Imagine Lithium Intercepts 15.77 m of 1.08% Li2O at the Jackpot Lithium Project
www.imaginelithium.com
Suite 1240 – 789 W. Pender Street, Vancouver, BC V6C 1H2
Imagine Lithium Intercepts 15.77 m of 1.08% Li2O
at the Jackpot Lithium Project
Vancouver, British Columbia, January 16, 2024 – IMAGINE LITHIUM INC. (the
“Company” or “Imagine”) (TSX-V: ILI) (OTCQB: ARXRF) is pleased to provide
significant near surface drill results from its ongoing drilling program at the Jackpot
lithium project, located within the rapidly emerging lithium camp in the Georgia
Lake area, approximately 140 km northeast of Thunder Bay, Ontario (Figure 1). The
Jackpot property is characterized by swarms of mineralized lithium-bearing granitic
pegmatite dikes distributed across an 18,800 ha land package.
Highlight holes from the ongoing drill program at the Jackpot Main Zone include:
- 15.77 m grading 1.08% Li2O from 19.2 m in hole JP-MAIN-2023-06
- Including 6.00 m grading 2.04% from 20.2 m
- 5.30 m grading 1.68% Li2O from 2.7 m in hole JPMET-2023-01B
- 7.0 m grading 1.03% Li2O from 40 m in hole JP-2023-P6
Results announced today demonstrate the near surface growth potential
surrounding the Jackpot Main Zone (Table 1). Drilling is currently ongoing at the
Jackpot Main Zone which consist of multiple stacked dikes covering a surface area of
approximately 1 km by 400 m. The goal of the current drilling program is to define
and expand the historical lithium resource. Areas being tested included the northern
area of the Jackpot Main Zone where the Company is seeing another stacked dike,
as well as the eastern extension of the Jackpot Main Zone which can expand the
mineralization along strike (Figure 2).
J.C. St-Amour, President of Imagine, commented, “We are pleased to see
continued near-surface mineralization that we believe will add significantly to
historical resources at Jackpot. We look forward to publishing a NI 43-101 compliant
resource estimate in the coming months. Drilling is also advancing on targets
outside the Jackpot Main Zone, including the Point Lithium area, which is an exciting
new zone that appears to parallel the Jackpot Main Zone pegmatite dikes.”
www.imaginelithium.com
Suite 1240 – 789 W. Pender Street, Vancouver, BC V6C 1H2
Figure 1: Jackpot Property located next to Trans-Canada Highway, power, port, railroad,
and workforce.
www.imaginelithium.com
Suite 1240 – 789 W. Pender Street, Vancouver, BC V6C 1H2
Figure 2. New lithium intercepts from the recent DDHs collared on the Jackpot Main Zone.
Table 1. Significant Li2O (%) intervals obtained from the 2023 drilling program in the
Jackpot Main Zone.
Hole From To Li2O % Length
JP-2023-P6 31.70 48.00 0.71 16.30
INCLUDING 40.00 47.00 1.03 7.00
JP-2023-P6B 26.20 34.20 0.81 8.00
JP-MAIN-2023-03 68.05 75.20 1.03 7.15
JP-MAIN-2023-04 2.70 8.00 1.68 5.30
JP-MAIN-2023-05 5.62 10.70 1.32 5.08
JP-MAIN-2023-06 8.00 12.22 0.95 4.22
www.imaginelithium.com
Suite 1240 – 789 W. Pender Street, Vancouver, BC V6C 1H2
JP-MAIN-2023-06 19.23 35.00 1.08 15.77
INCLUDING 20.23 26.23 2.04 6.00
JP-MET-2023-01B 35.92 51.90 0.94 15.98
The Company expects to publish a NI 43-101 compliant mineral resource estimate
in the first half of 2024 which will include results from drilling up to the end of 2023.
Existing infrastructure in the area (roads, power, labour force) and the proximity to
a major port is a distinguishing feature of the Jackpot lithium project which
differentiates it from more remote lithium projects. This infrastructure should
positively impact the overall project economics in the future.
The Jackpot Main Zone consists of five stacked pegmatite dike sheets of varying
thickness, called Pegmatite A through E (Figure 3). The pegmatite sheets generally
have an east-west strike and dip shallowly to the north (Figure 3). Drilling will
continue to expand Pegmatite A and Pegmatite C up-dip and to the east, while the
north zone will continue to be expanded down dip from the current intercepts. An
updated geological model will assist with drill targeting and the advancement of the
NI 43-101 resource estimate.
Figure 3. Isometric view looking NW of the Jackpot Main Zone pegmatite dikes A
through E.
QA/QC Protocol
JP-2023-P6 - 1.03% Li2O/7.00 m
JP-2023-P6B - 0.81% Li2O/8.00 m
JP-MAIN-2023-06
1.08% Li2O/15.77 m
JP-2023-P6B - 0.81%
Li2O/8.00 m
JP-MAIN-2023-05
1.32% Li2O/5.08 m
JP-MAIN-2023-04
1.68% Li2O/5.30 m
JP-MAIN-2023-03
1.03% Li2O/7.15 m
JP-MET-2023-01B
0.94% Li2O/15.98 m
Scale (m)
www.imaginelithium.com
Suite 1240 – 789 W. Pender Street, Vancouver, BC V6C 1H2
Imagine Lithium implemented a strict QA/QC protocol in processing all rock samples
collected from the core material obtained from the Jackpot property. The protocol
included the insertion and monitoring of appropriate reference materials, in this
case high concentration and low concentration certified OREAS lithium standards,
blanks and duplicates, to validate the accuracy and precision of the assay results.
All collected core rock samples were put in sturdy plastic bags, tagged, and sealed
in the core shack under the supervision of professional geologists. From 1 to 2 kg of
till material was collected, cleaned of coarse pebbles (>16 mm), put in Kraft paper
sample envelopes, and stowed in plastic bags for transport to the core shack in
Nipigon. For each sample collected; the sample number, UTM coordinates, and a
brief material description were systematically noted. The samples were dried for at
least 48h at the core shack. All sample bags containing rock or soil material were
put in rice pouches and kept securely before being sent by road transport to the
AGAT Laboratories in Thunder Bay, Ontario. Lithium was analyzed by Sodium
Peroxide Fusion with ICP-OES and ICP-MS Finish
www.imaginelithium.com
Suite 1240 – 789 W. Pender Street, Vancouver, BC V6C 1H2
Qualified Person
The technical content of this news release w as reviewed and approved by Jason
Arnold, P.Geo., an Independent Qualified Person as defined by the National
Instrument 43-101.
About Imagine Lithium Inc.
Imagine is a junior mining exploration company focused on seeking and acquiring
world-class mineral projects. The company holds the Jackpot lithium property
located in the Georgia Lake area about 140 km NNE of Thunder Bay, Ontario, is
approximately 12 km by road from the TransCanada Highway (Hwy 11), and is in
proximity to sources of power, railroads, and ports. The property contains known
lithium-bearing granitic pegmatite dikes, of which two provided estimated historical
resources of 2 million tons at 1.09% Li2O and 750,000 tons at 1.38% Li2O*.
* The estimates presented above are treated as historical information and have not
been verified or relied upon for economic evaluation by the Company. These
historical mineral resources do not refer to any category of sections 1.2 and 1.3 of NI-
43-101 such as mineral resources or mineral reserves as stated in the 2010 CIM
Definition Standards on Mineral Resources and Mineral Reserves. The explanation
lies in the inability by the Company to verify the data acquired by the various
historical drilling campaigns. The Company has not done sufficient work yet to
classify the historical estimates as current mineral resources or mineral reserves.
ON BEHALF OF THE BOARD
“J.C. St-Amour”
J.C. St-Amour, President
FOR FURTHER INFORMATION, PLEASE CONTACT:
Telephone: +1-604-683-3995
Toll Free: 1-888-945-4770
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
FORWARD LOOKING STATEMENTS: This news release contains forward-looking statements, which relate
to future events or future performance and reflect management’s current expectations and assumptions.
Such forward-looking statements reflect management’s curre nt beliefs and are based on assumptions
made by and information currently available to the Company. Investors are cautioned that these
forward-looking statements are neither promises nor guarantees and are subject to risks and
uncertainties that may cause future results to differ materially from those expected. These forward -
looking statements are made as of the date hereof and, except as required under applicable securities
legislation, the Company does not assume any obligation to update or revise them to reflect new events
www.imaginelithium.com
Suite 1240 – 789 W. Pender Street, Vancouver, BC V6C 1H2
or circumstances. All the forward-looking statements made in this press release are qualified by these
cautionary statements and by those made in our filings with SEDAR in Canada (available at
www.sedarplus.ca).