Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ILC.V ·

International Lithium Announces Positive Preliminary Economic Assessment Results for the Mariana Lithium Brine Project, Salta, Argentina

Economic Studies

NEWS RELEASE

International Lithium Announces Positive Preliminary

Economic Assessment Results for the Mariana Lithium Brine

Project, Salta, Argentina

Vancouver, B.C. December 6, 2018 : International Lithium Corp. (the “ Company” or “ ILC”)

(TSXV: ILC) is pleased to announce the results of a Preliminary Economic Assessment (“PEA”)

for the Mariana Lithium Brine Project located in the province of Salta, Argentina.

PEA Highlights:

• 25-year mine life producing 10,000 tonnes per year ( “TPY”) Lithium Carbonate

Equivalent (“LCE”) plus 84,000 TPY Sulphate of Potash (“SOP”).

• The estimated CAPEX and OPEX are for a conventional brine extraction facility, solar

evaporation ponds and SOP processing with a level of accuracy of -30/+50%.

• CAPEX estimated at US $243 million for 25-year mine life.

• NPV = US $192 million after-tax at 10% discount rate, IRR = 20% post-tax.

• Project results remain positive, even with important negative variations on the driver

variables, indicating project strength and resilience; thus, the PEA study indicates

Mariana’s proposed 10,000 TPY LCE concentrated brine and 84,000 TPY SOP fertilizer

operation has the potential to generate strong economic returns.

The PEA was prepared by Advisian (“Advisian”), a division of the WorleyParsons Group , for

Mariana Lithium Corp. to provide a PEA of its Mariana Lithium Brine Project in accordance with

National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). The

PEA technical report assesses the potential economic viability of developing the 14 exploration

licenses (Minas), that cover the Salar de Llullaillaco (the Salar) and surrounding area (23,560

hectares), for the purpose of extraction of lithium brine resources and processing of two

products - Lithium Carbonate Equivalent and Sulphate of Potash. All figures are quoted in US

dollars. It should be noted that the Company did not play any significant part in the production of

the PEA report, and that the conclusions are therefore those of the consultants.

Cautionary Note:

The preliminary economic assessment (PEA) is preliminary in nature, and it includes inferred

mineral resources that are considered too speculative geologically to have the economic

considerations applied to them that would enable them to be categorized as mineral reserves,

and there is no certainty that the preliminary economic assessment will be realized . The PEA

includes the results of an economic analysis of mineral resources, and mineral resources that

are not mineral reserves do not have demonstrated economic viability.

1030 West Georgia Street, Suite 1910

Vancouver, British Columbia

V6E 2Y3, Canada

T: +1-604-449-6520

[email protected]

www.internationallithium.com

2

Current ownership of the Mariana Project is through a joint venture company, Litio Minera

Argentina S. A., a private company registered in Argentina, owned 82.754% by Ganfeng Lithium

through its wholly-owned subsidiary, Mariana Litihium Corp. and 17.246% by ILC . In addition,

ILC has an option to acquire another 10% in the Mariana Project through a back-in right.

John Wisbey, Chairman and CEO of the Company said, “It is good finally to have received this

Preliminary Economic Assessment (PEA) showing a post-tax NPV for Mariana of over US $190

million (over CAD $250 million at current exchange rates) with net annual cashflows of US $96

million after production starts . It is significant how much the high concentration of Sulphate of

Potash is worth to the project, which is a large credit on top of the lithium revenues. Our present

share in Mariana is 17.246% and it would rise to 27.246% if we exercised our back -in right

which would currently cost us about CAD $7 million. It should be noted that the conclusions of

the PEA were prepared by Advisian based on work carried out by the project managers . The

cutoff for data supporting the PEA is March 31, 2018. The process methodology is based on the

assumption that conventional brine extraction and evaporation methods will be the only method

used for the production of lithium and potassium compounds at Mariana. It is our belief that

additional value can be created for the project by use of appropriate membrane technology

onsite in Argentina, and we will be supportive of initiatives to use this method to complement the

current plans for evaporation. Additionally we are hopeful that the estimate of 10,000 tonnes per

annum of production and a 25 -year mine life are on the conservative side, given the 1,248,000

tonnes of indicated resource and the 6 18,000 tonnes of inferred resource reported in 201 6.

Nevertheless, these solid numbers in the PEA give us great encouragement that Mariana has

been worth investing in and that, provided that Ganfeng and we can together finance the project

appropriately, it is capable of delivering a significant return to our shareholders.”

Preliminary Economic Analysis

The economic analysis of the Mariana Lithium Project (the “Project”) is based on an operating

capacity of 40,150 TPY of 4.7% lithium concentration brine and production of 84,000 TPY of

SOP fertilizer product.

To perform the Project’s economic evaluation, Advisian used a discounted cash flow (DCF)

financial model with a 10% discount rate. Capital and operating costs estimates are as shown in

the following sections. Other main inputs for this model are an assumed ramp up and production

program, and a market and pricing forecast included below.

Results of the model comprise the Project’s NPV and IRR. Table 1 presents the Project’s base

case economic analysis results.

Table 1: Economic Evaluation – Base Case Summary.

Description Units LCE SOP Total

Production tpy 10,000 84,000

Mine Life years

25

Capital Cost (CAPEX) US$

243,425,000

3

Description Units LCE SOP Total

Operating Cost (OPEX) US$

46,666,000

Lithium Carbonate Refining Cost US$/t 2,900 N/A

Average Selling Price US$/t 9,683 550

Annual Revenue US$ 96,830,000 46,200,000 143,030,000

Discount Rate %

10%

Net Present Value (NPV) Pre-Tax US$

288,017,000

Internal Rate of Return (IRR) Pre-Tax %

23.7

Net Present Value (NPV) Post-Tax US$

191,670,000

Internal Rate of Return (IRR) Post-Tax %

20.0

Capital and Operating Costs

Capital expenditures are based on an operating capacity of 40,150 TPY of 4.7% lithium

concentrated brine and production of 84,000 TPY of SOP fertilizer product. Capital equipment

costs were obtained from in-house data and solicited budget price information. The estimate is

compliant to AACE Class 5 standard. Accuracy of this estimate is expected to be within a -30% /

+50% range.

Table 2: CAPEX Summary.

Area Code & Name Cost US$

1000 Brine Field 24,428,000

2000 Evaporation Ponds 87,547,000

3000 SOP Process Plant 41,742,000

4000 On Site Infrastructure & Auxiliaries 6,888,000

5000 Tailings Management Area (TMA) 4,617,000

6000 Lithium Carbonate Plant N/A

7000 Off-Site Infrastructure 22,316,000

Direct Cost Sub-Total 187,538,000

4

Area Code & Name Cost US$

8000 Owner’s & Misc. Indirect Costs 18,754,000

9000 EPCM Services 15,003,000

Indirect Cost Sub-Total 33,757,000

Total Cost (Direct +Indirect) 221,295,000

Contingency (10%) 22,130,500

TOTAL 243,425,000

Table 3: Annual Operating Cost Summary.

Item № Description Cost (US$)

1 Manpower 2,052,000

2 Electrical Power 12,023,000

3 Reagents, Fuel & Consumables 14,715,000

4 Ponds Harvesting & TMA Operation 5,954,000

5 Water 531,000

6 Camp Operations & Personnel Transport 1,084,000

7 Sustaining Capital Cost 3,808,000

8 Product Transportation 3,966,000

9 Miscellaneous Direct Expenditures 662,000

10 Sub-Total 44,134,000

11 Indirect Operational Expenditures 1,870,000

TOTAL 46,666,000

Summary and Conclusions

• The technical solutions included in the PEA technical report are standard, time

proven designs for main operating facilities. This approach provides a solid,

workable base case to which other design alternatives can be related and

compared.

5

• Advisian has estimated CAPEX and OPEX for a conventional brine extraction

facility, solar evaporation ponds and SOP processing with a level of accuracy of -

30/+50%, including equipment, materials, indirect costs and contingencies during

the construction period, is estimated to be US $243.4 million.

• The Project economic analysis indicates that, for the base case, the After Tax (AT)

NPV (10%) is US $191.7 million and IRR is 20.0%.

• Project results remain positive, even with important negative variations on the

driver variables, indicating project strength and resilience; thus, the PEA study

completed by Advisian indicates the Project’s proposed 10,000 TPY LCE

concentrated brine and 84,000 TPY SOP fertilizer operation has the potential to

generate strong economic returns.

An NI 43 -101 technical report is required to be filed, in conjunction with the disclosure of the

PEA in this news release, within 45 days.

Afzaal Pirzada, P. Geo., a Qualified Person as defined by NI 43-101 and a consultant to the

Company, has reviewed and approved the all disclosure of scientific or technical information in

this news release.

About International Lithium Corp.

International Lithium Corp. has a significant portfolio of projects, strong management, and a

strategic partner and key investor, Jiangxi Ganfeng Lithium Co. Ltd., (“ Ganfeng Lithium ”) a

leading China-based lithium product manufacturer.

The Company’s primary strategic focus is now on the Mariana project in Argentina and on the

Raleigh Lake project in Canada.

The Company has a strategic stake in the Mariana lithium -potash brine project located within

the renowned South American “Lithium Belt” that is the host to the vast majority of global lithium

resources, reserves and production. The Mariana project strategically encompasses an entire

mineral rich evaporite basin, tota lling 160 square kilometres that ranks as one of the more

prospective salars or ‘salt lakes’ in the region. Current ownership of the project is through a joint

venture company, Litio Minera Argentina S. A., a pri vate company registered in Argentina,

owned 82.754% by Ganfeng Lithium and 17.246% by ILC . In addition, ILC has an option to

acquire 10% in the Mariana project through a back-in right.

The Raleigh Lake project, now consisting of 3,027 hectares of adjoinin g mineral claims in

Ontario, is now regarded by ILC management as ILC’s most significant project in Canada. It

is 100% owned by ILC, is not subject to any encumbrances, and is royalty free.

Complementing the Company’s lithium brine project at Mariana and rare metal pegmatite

property at Ra leigh Lake, are interests in two other rare metal pegmatite properties in Ontario,

Canada known as the Mavis Lake and Forgan Lake projects, and the Avalonia project in

Ireland, which encompasses an extensive 50-km-long pegmatite belt.

6

The ownership of the Mavis Lake project is now 51% Pioneer Resources Limited (ASX:PIO,

“Pioneer”) and 49% ILC. In addition, ILC owns a 1.5% NSR on Mavis Lake. Pioneer has an

option to earn an additional 29% by sole -funding a further CAD $8.5 million expenditures of

exploration activities, at which time the ownership will be 80% Pioneer and 20% ILC.

The Forgan Lake project will, upon Ultra Lithium meeting its contractual requirements

pursuant to its agreement with ILC, become 100% owned by Ultra Lithium (TSXV: ULI), and

ILC will retain a 1.5% NSR on Forgan Lake.

The ownership of the Avalonia project is currently 55% Ganfeng Lithum and 45% ILC.

Ganfeng Lithium has an option to earn an additional 24% by either incurring CAD $10

million expenditures on exploration ac tivities or delivering a positive feasibility study on the

project, at which time the ownership will be 79% Ganfeng Lithum and 21% ILC.

With the increasing demand for high tech rechargeable batteries used in electric vehicles

and electrical storage as well as portable electronics, lithium has been designated “the new

oil”, and is a key part of a “green tech”, sustainable economy. By positioning itself with solid

strategic partners and projects with significant resource potential, ILC aims to be one of the

lithium and battery metals resource developers of choice for investors and to continue to

build value for its shareholders.

International Lithium Corp.’s mission is to find, explore and develop projects that have the

potential to become world class lithiu m, potash and rare metal deposits. A key goal is to

become a well funded company to turn that aspiration into reality.

On behalf of the Company,

John Wisbey

Chairman and CEO

www.internationallithium.com

For further information concerning this news release please contact +1 604-449-6520

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

Cautionary Statement Regarding Forward-Looking Information

Except for statements of historical fact, this news release contains certain “forward -looking

information” within the meaning of applicable securities law. Forward -looking information or

forward-looking statements in this or other news releases may include: the effect of results of

the preliminary economic assessment of the Mariana Joint Venture Project, timing of publication

of the PEA technical report, anticipated production rates, the timing and/or anticipated results of

drilling on the Raleigh Lake or Mavis Lake projects, the expectation of feasibility studies, lithium

recoveries, modeling of capital and operating costs, results of studies utilizing membrane

7

technology at the Mariana Project, budgeted expenditures and planned exploration work on the

Avalonia J oint Venture, satisfactory completion of the sale of mineral rights at Forgan Lake ,

satisfactory completion of the purchase of additional mineral rights at Raleigh Lake , increased

value of shareholder investments, and continued agreement between the Company and Jiangxi

Ganfeng Lithium Co. Ltd. regarding the Company’s percentage interest in the Mariana project.

Such forward-looking information is based on a number of assumptions and subject to a variety

of risks and uncertainties, including but not lim ited to those discussed in the sections entitled

“Risks” and “Forward-Looking Statements” in the interim and annual Management’s Discussion

and Analysis which are available at www.sedar.com. While management believes that the

assumptions made are reasonable, there can be no assurance that forward -looking statements

will prove to be accurate . Should one or more of the risks, uncertainties or other factors

materialize, or should underlying assumptions prove incorrect, actual results may vary materially

from those described in forward-looking information. Forward-looking information herein, and all

subsequent written and oral forward -looking information are based on expectations, estimates

and opinions of management on the dates they are made that, while considered reasonable by

the Company as of the time of such statements, are subject to significant business, economic

and competitive uncertainties and contingencies. These estimates and assumptions may prove

to be incorrect and are expressly qualified in their entirety by this cautionary statement. Except

as required by law, the Company assumes no obligation to update forward -looking information

should circumstances or management’s estimates or opinions change.