Imperial Reports Mount Polley Production Update for 2025 Third Quarter
imperialmetals.com
News Release
Imperial Reports Mount Polley Production Update for 2025 Third Quarter
Vancouver | October 20, 2025 | Imperial Metals Corporation (the “Company” or “Imperial”) (TSX:III) reports
quarterly copper and gold production from the 100% owned Mount Polley mine. Imperial’s third quarter
production from Mount Polley was 7.655 million pounds copper and 9,285 ounces gold.
Mount Polley Mine - Production
Mount Polley metal production for the third quarter of 2025 was 7.655 million pounds copper and 9,285 ounces
gold, compared to 9.822 million pounds copper and 9,527 ounces gold produced during the comparative quarter
of 2024.
Mill throughput in the third quarter 2025 was up 5%, with 1.780 million tonnes being treated compared with
1.694 million tonnes treated in the third quarter of 2024. Copper and gold production was lower in the third
quarter of 2025 versus the third quarter of 2024. The reduction in metal production reflects the lower grades,
and lower copper recovery, offset somewhat by the higher throughput.
For the first nine months of 202 5, an increase in throughput, similar copper and gold grades and recoveries
resulted in slightly lower copper production and 4.8% higher gold production compared to the same period last
year.
Mount Polley mine production Three Months Ended Sept 30 Nine Months Ended Sept 30
2025 2024 2025 2024
Ore milled - tonnes 1,780,867 1,694,355 5,261,729 5,080,190
Ore milled per calendar day - tonnes 19,357 18,417 19,274 18,541
Grade % - copper 0.240 0.316 0.272 0.287
Grade g/t - gold 0.233 0.251 0.264 0.265
Recovery % - copper 81.3 83.2 82.6 82.2
Recovery % - gold 69.6 69.7 69.2 68.2
Copper - 000’s pounds 7,655 9,822 26,055 26,459
Gold - ounces 9,285 9,527 30,967 29,544
Phase 4 pushback of the Springer pit generated 41% of the ore in the third quarter . Stripping of the Phase 5
pushback continues and produced 51% of the ore in the period. Approximately 1.0 million tonnes of Non-Acid
Generating “NAG” waste was hauled to the Tailings Storage Facility.
The 2025 production targets for Mount Polley were 25 - 27 million pounds copper and 35,000 - 40,000 ounces
gold. Copper production for the year is now targeted to be about 30 million pounds, exceeding the high end of
the original 2025 target range. Gold production for the fourth quarter is expected to be similar to the previous
quarters of 2025, and we expect to produce about 40,000 ounces of gold for 2025, the high end of the 2025
target for gold.
Brian Kynoch, P.Eng., Imperial’s President has reviewed the disclosures contained in this news release and is the
designated Qualified Person as defined by National Instrument 43-101 (“NI 43-101”).
---
imperialmetals.com
About Imperial
Imperial is a Vancouver based exploration, mine development and operating company with holdings that include the Mount
Polley mine (100%), the Huckleberry mine (100%), and the Red Chris mine (30%). Imperial also holds a portfolio of 23
exploration properties in British Columbia.
Company Contacts
Brian Kynoch | President | 604.669.8959
Darb S. Dhillon | Chief Financial Officer | 604.669.8959
Cautionary Note Regarding Forward-Looking Statements
Certain information contained in this news release are not statements of historical fact and are “forward -looking” statements.
Forward-looking statements relate to future events or future performance and reflect Imperial management’s expectations or
beliefs regarding future events and include, but are not limited to statements regarding: expected fourth quarter production for
copper and gold.
In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “expects” or “does not expect”,
“is expected”, “is targeted”, “targets”, “outlook”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates ” or
“does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or r esults
“may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved" or the negative of these terms or compara ble
terminology. By their very nature forward -looking statements involve known and unknown risks, uncertainties and other factors
which may cause the actual results, performance or achievements of Imperial to be materially different from any future result s,
performance or achievements expressed or implied by the forward-looking statements.
In making the forward -looking statements in this news release, Imperial has applied certain factors and assumptions that are
based on information currently available to Imperial as well as Imperial’s current beliefs and assumptions. These factors and
assumptions and beliefs and assumptions include, the risk factors detailed from time to time in Imperial’s interim and annual
financial statements and management’s discussion and analysis of those statements, and the Company’s current Annual
Information Form, a ll of which are filed and available for review on SEDAR+ at www.sedarplus.com. Although Imperial has
attempted to identify important factors that could cause actual actions, events or results to differ materially from those described
in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated
or intended, many of which are beyond Imperial’s ability to control or predict. There can be no assurance that forward -looking
statements will pro ve to be accurate, as actual results and future events could differ materially from those anticipated in such
statements. Accordingly, readers should not place undue reliance on forward looking statements and all forward -looking
statements in this news release are qualified by these cautionary statements.