Saturday, September 19, 2026
MiningNewsTerminal
Saturday, September 19, 2026 Admin

IGO.V ·

Independence GOLD Completes Drill Program at 3TS Project, BC

Exploration Programs

Suite 580 – 625 Howe Street, Vancouver, British Columbia V6C 2T6

Telephone: 604-687-3959 Facsimile: 604-687-1448 E-Mail: [email protected]

NEWS RELEASE

INDEPENDENCE GOLD COMPLETES DRILL PROGRAM AT 3TS PROJECT, BC

Vancouver, BC – (June 16, 2025) – Independence Gold Corp. (TSXV: IGO) (OTCQB: IEGCF) ("Independence"

or "the Company") is pleased to report the successful completion of its 2024 –2025 drill program at the

3Ts Project. Located approximately 185 kilometres (“km”) southwest of Prince George, British Columbia,

the 3Ts Project is comprised of thirty-one mineral claims covering approximately 35,486 hectares (“ha”)

in the Nechako Plateau region of central British Columbia. The project is situated 16 km southwest of

Artemis Gold Inc.’s Blackwater Mine and covers a low -sulphidation epithermal quartz - carbonate vein

district within which nineteen individual mineralized veins, ranging from 50 m to more than 1,100 m in

strike length and with true widths up to 32 m have been identified.

Highlights from 2024-2025 Drill Program

A total of 12,480 m of drilling completed and included:

• Infill and expansion drilling on the Ted -Mint and Tommy vein systems for an upcoming mineral

resource update

• Exploration and detailed drilling on the recently discovered Johnny, Larry and Ian veins, also to be

included in the updated mineral resource

• Exploratory drilling on the Ootsa copper-silver target

Randy Turner, President & CEO of the Company commented , “We are very pleased with the results to

date from the winter-spring drill program as we advance the Ted-Mint, Tommy, Johnny, Larry and Ian vein

systems. With the expansion of our mineralized vein portfolio and pending assay results, 2025 is shaping

up to be a transformational year for the project.”

The drill program commenced in November 2024 and continued through the winter, concluding in early

June 2025. Final analysis of samples is underway, and results are expected in the coming weeks. Highlights

released to date from the drilling include:

• Tommy Vein: 3TS-24-26 returned 8.30 g/t Au and 73.23 g/t Ag over 7.47 m (true width

approximately 5.77 m)

• Johnny Vein: 3TS -25-05 returned 4.04 g/t Au and 40.9 g/t Ag over 77 m (true width

approximately 32 m)

• Ted–Mint Vein: 3TS -24-28 returned 5.59 g/t Au and 86.17 g/t Ag over 29.5 m (true width

approximately 14.75 m)

• Larry Vein: 3TS -25-07 returned 5.58 g/t Au and 73.76 g/t Ag over 19.40 m (true width

approximately 6.3 m)

• Ootsa target drilling: Hole 3TS-25-15: 5.49 m averaging 55.74 g/t Ag, 0.95% Cu , plus Pb –Zn

mineralization. (true width approximately 4.45 m)

Suite 580 – 625 Howe Street, Vancouver, British Columbia V6C 2T6

Telephone: 604-687-3959 Facsimile: 604-687-1448 E-Mail: [email protected]

The Company anticipates an updated mineral resource model in the third quarter of 2025, strengthened

by extensive infill and exploratory drilling. New drill data, combined with refined geological modelling, will

underpin resource estimates for the expanded set of vein systems. The current NI 43-101 resource model

was completed in 2022 and the updated resource will include data compiled over five drill programs since

then (please see news release dated August 18 th, 2022 for further details; “Technical Report on the

Mineral Resource Estimate Update for the 3Ts Gold Project, Omineca Mining Division, British Columbia,

Canada”, authored by Armitage and Miller).

QA/QC Protocols

Samples consist of saw-cut (NQ) drill core with one-half retained for reference and one-half submitted for

analysis. Samples were submitted in sealed plastic bags delivered to Bandstra Transportation for shipping

to SGS Natural Resources Canada (SGS) labs in Burnaby, British Columbia, for sample preparation and

analysis. Robotic sample preparation is used to ensure reproducibility and samples are pulverized to

greater than 85% passing 75 microns. All samples are submitted for four acid digest with an ICP finish.

Gold grades are obtained by fire assay with AAS finish. Samples which return greater than 10 parts per

million gold and 100 parts per million silver are resubmitted for fire assay with a gravimetric finish. Sample

batches consist of core samples, control standards, blanks and duplicates. Blank s and control standards

(QAQC) are inserted into each batch of samples, with one QAQC per 20 samples. QAQC samples that

return values 10% outside of the expected range require samples from that internal batch to be rerun by

the lab. SGS laboratories operate under a Quality Management System that complies with ISO/IEC 17025.

SGS’s minerals laboratory in Burnaby is accredited by the Standards Council of Canada (SCC) for specific

mineral tests listed on the scope of accreditation to the ISO/IEC 17025 standard. Please see SGS Analytical

Methods for further details regarding analytical procedures.

About Independence

Independence Gold Corp. is a well -financed mineral exploration company with holdings ranging from

early-stage grassroots exploration to advanced-stage resource expansion in British Columbia and Yukon.

The Company is positioned to add shareholder value through systematic project advancement, while

management continues to evaluate additional gold and silver projects for possible acquisition. For

additional information, visit the Company's website www.ingold.ca.

Andy Randell, P.Geo., the Company’s Qualified Person as defined by National Instrument 43-101 and

who is an independent consultant of the Company, has reviewed the technical information in this news

release.

ON BEHALF OF THE BOARD OF INDEPENDENCE GOLD CORP.

“Randy Turner”

Randy Turner, President and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Drill Hole Location Data

Drill Hole Easting Northing Elevation Azimuth** Dip Total Meterage

3TS-24-28 364960 5876638 1091 270 -45 125m

3TS-25-05 363044 5876910 1214 90 -90 276m

3TS-25-07 363940 5876982 1150 270 -70 330m

3TS-25-15 365804 5877551 1160 40 -50 351m

3TS-24-26 363715 5876774 1197 2700 -65 201m

*All drill hole locations are in NAD83, Zone 10 Datum

** Based on true north; For magnetic declination add 17.5°

Suite 580 – 625 Howe Street, Vancouver, British Columbia V6C 2T6

Telephone: 604-687-3959 Facsimile: 604-687-1448 E-Mail: [email protected]

All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to

Independence within the meaning of applicable securities laws, including statements with respect to the Company’s planned

drilling and exploration activities. The Company provides forward-looking statements for the purpose of conveying information

about current expectations and plans relating to the future and readers are cautioned that such statements may not be

appropriate for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be general

or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not

prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be

achieved. These risks and uncertainties include but are not limited to those identified and reported in Independence’s public

filings under Independence Gold Corp.’s SEDAR profile at www.sedarplus.ca. Although Independence has attempted to identify

important factors that could cause actual actions, events or results to differ materially from those described in forward-looking

information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended .

There can be no assurance that such information will prove to be accurate as actual results and future events could differ

materially from those anticipated in such statements. Independence disclaims any intention or obligation to update or revise

any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.