Ivanhoe Electric On-Track to Deliver Santa Cruz Copper Project Preliminary Feasibility Study in Q2 2025 Ivanhoe Electric Will Use the Preliminary Feasibility Study to Pursue Long-term Project Financing Metallurgical Results from Ongoing Testwork Show High Copper

Financings Metallurgy & Processing

1

September 16, 2024

Ivanhoe Electric On-Track to Deliver Santa Cruz Copper Project

Preliminary Feasibility Study in Q2 2025

Ivanhoe Electric Will Use the Preliminary Feasibility Study to Pursue

Long-term Project Financing

Metallurgical Results from Ongoing Testwork Show High Copper

Recoveries and Recoverable Precious Metals

Santa Cruz Copper Project Received General Plan Amendment

Approval from the City of Casa Grande and is Preparing Key Permit

Applications for Submittal in H1 2025

Recent Infill Drilling Intersects High-Grade Copper Mineralization at

the Santa Cruz Deposit, Including 99 Meters Grading 2.39% Copper

PHOENIX, ARIZONA – Ivanhoe Electric Inc. (“Ivanhoe Electric”) (NYSE American: IE;

TSX: IE) Executive Chairman Robert Friedland and President and Chief Executive

Officer Taylor Melvin are pleased to provide an update on the ongoing progress at the

Company’s Santa Cruz Copper Project in Arizona.

Mr. Melvin commented: “We are encouraged by the ongoing progress at our Santa Cruz

Copper Project. Our Preliminary Feasibility Study remains on track and on budget for

completion in the second quarter of 2025. We are pleased to have received approval by

the City of Casa Grande for our General Plan Amendment, and we look forward to

submitting key permit applications in early 2025.”

2

The Santa Cruz Copper Project Preliminary Feasibility Study will define an

underground mining operation supported by a mine plan and an updated mineral

resource and reserve estimate

Our Preliminary Feasibility Study (“PFS” or the “Study”) is being conducted under the

standards of U.S. Regulation S-K 1300. The Study will include a detailed mine plan that

will be supported by an updated mineral resource and reserve estimate resulting from

our infill drilling and testwork activities. The Study will be used by Ivanhoe Electric to

make an investment decision and pursue long-term project financing.

The Santa Cruz Copper Project Preliminary Feasibility Study is now 50%

complete, with several significant milestones achieved, and on track for

completion in Q2 2025

• 120,000 meters of new drilling completed since December 2022 Mineral Resource

Estimate (“MRE”) to support Preliminary Feasibility Study

• Significant advancements in metallurgy, mine engineering, processing, tailings

trade-off studies, and mine access planning

• Studies focused on process design and optimization, power, water management,

and environmental/permitting are ongoing

Metallurgical studies, conducted by Blue Coast Research Ltd. of British

Columbia, Canada, showing high copper recoveries and presence of recoverable

precious metal by-products

• Up to 98% recoveries of acid-soluble copper for production of copper cathode

• Up to 92% recoveries of floatable copper to produce high-grade copper

concentrate

• Expected to produce a high-grade copper concentrate grading up to 51% copper

by weight and high-purity copper cathode meeting London Metal Exchange Grade

A standards

• Identified recoverable precious metal by-products expected to average 2.0 g/t

gold and 145.9 g/t silver in the high-grade copper concentrate

3

Permitting milestone achieved and major permits in preparation for submittal

In June 2024, Ivanhoe Electric received approval from the City of Casa Grande for the

Major General Plan Amendment for the Santa Cruz Copper Project, a major milestone

for the Project. The City of Casa Grande Council unanimously approved amending

nearly 3,000 acres of land use designation from “Neighborhoods” to

“Manufacturing/Industry.” Key permitting applications are being prepared for submittal

in the first half of 2025 in connection with the PFS.

Infill drilling at Santa Cruz Deposit demonstrates presence of high-grade

domains within the Mineral Resource Estimate

The development drill program at the Santa Cruz Copper Project included drill holes

completed to support metallurgical studies, resource definition and infill, hydrogeology,

and geotechnical studies, all of which support the PFS. Infill drill holes were completed

to support the conversion of resources from the Inferred category to the higher-

confidence Indicated category.

Infill drill hole SCC-234, completed in the Santa Cruz Deposit, intersected higher than

expected copper grades, with mineralization present as strong chalcocite, atacamite,

and chrysocolla in bedrock Oracle Granite and porphyry as disseminations, veins, and

fracture fillings.

Assays from the recently completed development drill program continue to be received

and will be added to an updated MRE to support the PFS delivery in Q2 2025. Recent

intercepts include:

• 99.4 meters @ 2.39% total copper from 738.0 meters, including 46.1 meters @

3.99% total copper from 755.9 meters (Hole SCC-234)

• 140.1 meters @ 1.56% total copper from 753.4 meters, including 29.0 meters @

2.92% total copper from 799.0 meters (Hole SCC-228)

• 101.9 meters @ 1.65% total copper from 678.1 meters, including 17.6 meters @

2.37% total copper from 702.7 meters (Hole SCC-232)

• 70.2 meters @ 1.44% total copper from 551.0 meters, and 115.8 meters @ 1.12%

total copper from 630.2 meters (Hole SCC-219A)

See Figure 1 below for drill hole locations.

4

Figure 1. Plan view map showing completed drill holes with received and

pending assays and the location of infill drill holes from this release.

5

Photo 1. Drill core from infill drill hole SCC-234 at 776.72 meters showing intense

steely-gray chalcocite (a floatable mineral that is approximately 80% copper by

weight) enrichment mineralization in veins and disseminations.

6

Photo 2. Drill core from infill drill hole SCC-232 at 691.00 meters showing intense

dark green atacamite (a leachable mineral that is approximately 60% copper by

weight) mineralization.

7

Highlighted drill intercepts not previously disclosed from the Santa Cruz Copper Project

(refer to the Santa Cruz Drill Results page on Ivanhoe Electric’s website for further

details of all reported drill holes).

DRILL

HOLE LOCATION

FROM

(M)

TO

(M)

INTERVAL

LENGTH

(M)

TOTAL

COPPER

(%)

TOTAL

SOLUBLE

COPPER

(%)

SCC-210 Santa Cruz 594.97 650.00 55.03 1.05 1.01

AND 656.00 705.00 49.00 1.36 1.12

SCC-211 Santa Cruz 552.00 584.00 32.00 1.34 1.24

INCLUDING 552.00 568.00 16.00 1.68 1.63

SCC-212 Santa Cruz 615.00 640.00 25.00 1.19 1.02

AND 667.96 698.46 30.50 1.42 1.35

INCLUDING 675.56 698.46 22.90 1.54 1.46

INCLUDING 675.56 692.00 16.44 1.73 1.65

AND 707.21 748.15 40.94 1.10 1.06

INCLUDING 707.21 726.95 19.74 1.41 1.34

AND 753.49 808.00 54.51 1.17 1.15

SCC-215 Santa Cruz 598.46 630.89 32.43 1.38 1.32

AND 745.00 794.20 49.20 1.18 0.69

INCLUDING 750.93 772.00 21.07 1.57 1.17

AND 802.00 857.00 55.00 0.86 0.07

SCC-219A Santa Cruz 551.00 621.22 70.22 1.44 1.34

AND 630.17 746.00 115.83 1.12 0.82

SCC-221 Santa Cruz 844.91 965.00 120.09 1.34 1.25

8

INCLUDING 870.00 922.31 52.31 1.81 1.88

SCC-223 Santa Cruz 421.00 450.00 29.00 1.59 1.36

SCC-225A Santa Cruz 479.00 519.00 40.00 2.00 1.91

INCLUDING 479.00 509.00 30.00 2.42 2.33

INCLUDING 482.00 488.87 6.87 4.23 4.17

SCC-228 Santa Cruz 616.62 702.00 85.38 1.21 1.17

INCLUDING 638.85 657.40 18.55 1.97 1.86

AND 753.39 893.52 140.13 1.56 0.18

INCLUDING 799.00 828.00 29.00 2.92 0.37

SCC-229 Santa Cruz 623.00 701.00 78.00 1.47 1.15

INCLUDING 623.00 655.00 32.00 2.37 2.30

INCLUDING 629.00 645.00 16.00 2.86 2.78

SCC-232 Santa Cruz 678.09 780.00 101.91 1.65 1.68

INCLUDING 678.09 758.00 79.91 1.79 1.83

INCLUDING 702.69 720.25 17.56 2.37 2.41

AND 788.00 838.30 50.30 1.51 1.49

INCLUDING 788.00 825.09 37.09 1.74 1.72

SCC-234 Santa Cruz 691.08 731.98 40.90 1.59 1.58

INCLUDING 691.08 730.04 38.96 1.63 1.62

AND 738.00 837.36 99.36 2.39 2.36

INCLUDING 738.00 814.00 76.00 2.92 2.86

INCLUDING 755.91 802.00 46.09 3.99 3.93

*Total Soluble Copper is the calculated summation of all soluble copper analyses derived from the sequential copper

analysis suite.