Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ICM.V ·

Iconic Files Amended Preliminary Economic Assessment Report ON Bonnie Claire Project

Economic Studies

LC373118-1

ICONIC FILES AMENDED PRELIMINARY ECONOMIC ASSESSMENT

REPORT ON BONNIE CLAIRE PROJECT

Vancouver, British Columbia – November 18, 202 2 – Iconic Minerals Ltd.

(the "Company" or "Iconic") (TSX-V: ICM) (OTC: BVTEF) (FSE: YQGB) reports

that it has filed an amended National Instrument 43 -101 Standards of Disclosure for

Mineral Projects ("NI 43-101") preliminary economic assessment technical report for the

Bonnie Claire project (the "Bonnie Claire Property") located 48 km (30 miles) north of

Beatty, Nevada.

The NI 43-101 technical report is entitled "Preliminary Economic Assessment NI 43 -101

Technical Report, Bonnie Claire Lithium Project , Nye County, Nevada " (the "Amended

PEA Technical Report ") and is dated effective August 20, 2021 with a revised and

amended date of November 11, 2022 . The Amended PEA Technical Report was

prepared pursuant to NI 43 -101 by Global Resource Engineering Ltd. of Denver ,

Colorado. The Amended PEA Technical Report is available on the Company' s SEDAR

profile at www.sedar.com and on the Company's website at www.iconicminerals.com.

Bonnie Claire Property

The Bonnie Claire Property is located within Sarcobatus Valley, which is approximately

30 km (19 miles) long and 20 km (12 miles) wide. Quartz-rich volcanic tuffs containing

anomalous amounts of lithium occur within and adjacent to the valley. Drill results from

the salt flat have included lithium values as high as 2550 ppm Li and a 1560 foot

(roughly 475 meter) vertical intercept that averaged 1153 ppm Li. The current 43 -101

resource from the Amended PEA Technical Report for the borehole mineable portion of

the resource is 3,407 million tonnes (inferred) grading 1,013 ppm Li or 18,372 million

kilograms of lithium carbonate equivalent . The gravity low within the valley is 20 km

(12 miles) long, and the current estimates of depth to basement rocks range from 600 to

1,200 meters (2,000 to 4,000 feet). The current claim block covers an area of 74 km 2

(28.6 mi2) with potential for brine systems and further sediment resources.

Qualified Persons

Richard Kern, Certified Professional Geologist, a qualified person as defined by

NI 43-101, has reviewed and approved the scientific and technical information contained

in this news release. Mr. Kern is not independent of the Company as he is the Chief

Executive Officer of Iconic.

- 2 -

LC373118-1

On behalf of the Board of Directors

SIGNED: "Richard Kern"

Richard Kern, President and CEO

For further informatio n on Iconic, please visit our website at www.iconicminerals.com,

or contact: Keturah Nathe, VP Corporate Development (604) 336-8614.

The Company's public documents may be accessed at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy

or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release contains forward-looking statements and forward -looking information (collectively,

"forward looking statements") within the meaning of applicable Canadian and U.S. securities legislation.

All statements, other than statements of historical fact, included herein are forward-looking statements.

Although the Company believes that such statements are reasonable, it can give no assurance that such

expectations will prove to be correct. Forward -looking statements are typically identified by words such

as: "believes", "exp ects", "anticipates", "intends", "estimates", "plans", "may", "should", "would", "will",

"potential", "scheduled" or variations of such words and phrases and similar expressions, which, by their

nature, refer to future events or results that may, could, wo uld, might or will occur or be taken or achieved.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may

cause the actual results, performance or achievements of the Company to differ materially from any futur e

results, performance or achievements expressed or implied by the forward looking information. Such risks

and other factors include, among others, statements as to the anticipated business plans and timing of

future activities of the Company, the ability of the Company to obtain sufficient financing to fund its

business activities and plans, delays in obtaining governmental and regulatory approvals (including of the

TSX Venture Exchange), permits or financing, changes in laws, regulations and policies affe cting mining

operations, currency fluctuations, title disputes or claims, environmental issues and liabilities, risks

relating to epidemics or pandemics such as COVID –19, including the im pact of COVID –19 on the

Company's business, financial condition and r esults of operations, changes in laws, regulations and

policies affecting mining operations, title disputes, the inability of the Company to obtain any necessary

permits, consents, approvals or authorizations, the timing and possible outcome of any pending litigation,

environmental issues and liabilities, and risks related to joint venture operations, and other risks and

uncertainties disclosed in the Company 's continuous disclosure documents. All of the Company' s Canadian

public disclosure filings may be a ccessed via www.sedar.com and readers are urged to review these

materials.

Readers are cautioned not to place undue reliance on forward -looking statements. The Company does not

undertake any obligation to update any of the forward -looking statements in th is news release or

incorporated by reference herein, except as otherwise required by law.