Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ICM.V ·

Iconic Announces 2019 Exploration Plans Bonnie Claire Lithium Project, Nevada

Exploration Programs

ICONIC MINERALS LTD.

Suite 303, 595 Howe Street

Vancouver, B.C. V6C 2T5

Phone: (604) 336-8614 Fax: (604) 718-2808

www.iconicmineralsltd.com

NEWS RELEASE

Iconic Announces 2019 Exploration Plans Bonnie Claire Lithium Project, Nevada

(April 23, 201 9) – Iconic Minerals Ltd. (“Company” or “Iconic”) (TSX-V: ICM) (OTC:

BVTEF) (FSE: YQGB) has finalized plans for its 2019 drilling program ( the “Drilling Program”)

at Bonnie Claire. Five drill holes averaging 90 meters (300 feet) depth will be drilled in the southern

portion of the project area in an area of anomalous surface lithium values and interpreted faults. Th

e purpose of the Drilling Program is to define shallow lithium mineralization which the Company

can utilize for bulk sampling and extend the resource to the south. If results are favorable, one or

more of the shallow holes will be deepened to +600 meters (2,000 feet) to further enlarge the

resource. A map of the drilling, surface lithium sampling results and interpreted faults can be found

on the Company website (www.iconicmineralsltd.com).

The Drilling Program is located 2 -5 kilometers (1.3 -3.1 miles) so uth of drill hole BC1602 (see

map). The shallow holes will be drilled using a tracked or buggy reverse circulation (RC) rig

suitable for the salt flats being tested. Down-hole sediment samples will be collected continuously

in 6 meter (20 feet) intervals and sent to a geochem lab for analysis.

Drilling will be initiated when the wet season has ended and the salt flats dry sufficiently to allow

access. This year has seen the fourth wettest season in history.

The Bonnie Claire Lithium Property Characteristics:

The Property is located within Sarcobatus Valley that is approximately 30 km (19 miles)

long and 20 km (12 miles) wide. Quartz -rich volcanic tuffs, that contain anomalous

amounts of lithium, occur within and adjacent to the valley. Geochemical analysis of the

local salt flats has yielded lithium values up to 340 ppm. The gravity low within the valley

is 20 km (12 miles) long, and the current estimates of depth to basement rocks range from

600 to 1,200 meters (2,000 to 4,000 feet). Four drill holes have identified an open ended,

43-101 compliant resource of 28.58 billion kilograms of lithium carbonate equivalent. The

drilling that defined the current resource only covered an area of 3.0 km 2 (1.2mi2), while

previously run MT geophysics show a potentially mineralized area of 27.3 km 2 (10.5mi2).

Drilling to date has shown strong correlation between the MT results and the lithium

mineralization. The thickness of the lithium mineralization is unknown, but drilling

indicates it is greater than 600 meters (2,000 feet). The current claim block covers an area

of 57.5 km2 (22.2mi2). Further drilling has been permitted and metallurgy to determine the

most efficient recovery method is currently in progress.

Richard Kern, Certified Professional Geologist (#11494) and CEO of Iconic is the Qualified Person

who has prepared and reviewed this press release in accordance with NI 43-101 reporting standards.

On behalf of the Board of Directors

SIGNED: “Richard Kern”

Richard Kern, President and CEO

Contact: Keturah Nathe, VP Corporate Development (604) 336-8614

2

For further information on ICM, please visit our website at www.iconicmineralsltd.com. The Company’s

public documents may be accessed at www.sedar.com

Forward Statement: This news release includes certain forward-looking statements or information. All statements

other than statements of historical fact included in this release are forward-looking statements that involve various

risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results

and future events could differ materially from those anticipated in such statements. Iconic expressly disclaims any

intention or obligation to update or revise any forward-looking statements whether as a result of new information,

future events or otherwise except as otherwise required by applicable securities legislation.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.