Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

IAU.TO ·

i-80 Gold Provides High-Grade Results from Drilling at Ruby Hill 13.7% Zn, 0.6% Cu, 17.5 g/t Ag Over 57.8 m

Drill Results

i-80 Gold Provides High-Grade Results from Drilling at

Ruby Hill

13.7% Zn, 0.6% Cu, 17.5 g/t

Ag Over

57.8 m

RENO, Nev.

,

Feb. 26, 2024

/CNW/ -

i-80 GOLD CORP.

(TSX: IAU) (NYSE: IAUX)

("i-80", or the "Company")

is

pleased to announce high-grade results from the final three holes completed as part of the multi-year drilling program

targeting polymetallic mineralization at the Company's 100%-owned Ruby Hill Property ("

Ruby Hill

" or "

the Property

")

located in

Eureka County, Nevada

. These holes will be included in an initial resource estimate for the polymetallic

mineralization contained within the Property.

The final three holes were drilled in the East Hilltop Zone, the most recently discovered of the Hilltop deposits, where both

Carbonate Replacement Deposit (CRD) and skarn mineralized horizons have been identified – both of which remain open

for expansion. Highlight results from final three holes include:

0.2% Zn, 6.3% Pb, 180.0 g/t Ag & 2.2 g/t Au Over

5.0 m

(iRH24-01 – CRD)

6.2% Zn, 5.6% Pb, 198.0 g/t Ag & 1.0 g/t Au Over

3.6 m

and 13.4% Zn, 2.5% Pb, 93.7 g/t Ag, & 0.6 g/t Au over

5.5 m

(iRH24-02 – CRD)

13.7% Zn, 0.6% Cu, & 17.5 g/t

Ag Over

57.8 m

(iRH24-03 – Skarn)

incl. 21.6 % Zn, 1.9 % Cu, & 54.6 g/t

Ag Over

9.5 m

Ruby Hill represents one of the Company's primary assets and is host to multiple gold, base metal and precious metal-

rich polymetallic deposits. Drilling completed between 2022 and 2024 at the Blackjack, Hilltop and FAD deposits

intersected significant high-grade mineralization with all deposits remaining open for expansion. The polymetallic (base

metal) resource estimate is being completed as part of the Company's plan to advance mine development at Ruby Hill

with underground workings accessing both the gold and polymetallic deposits.

"Since the initial discovery less than two years ago, we have been successful in identifying multiple high

grade mineralized

zones along the strike of the Hilltop fault structure. These discoveries highlight the geological potential for Ruby Hill to host

some of the highest-grade polymetallic mineralization known world

wide.", stated

Ewan Downie

, Chief Executive Officer of

i-80. "Our Hilltop discovery has produced some of the highest-grade results anywhere on the globe for this style of

mineralization, rich in zinc, gold, silver, lead and locally copper. The final hole of the program returned the best copper

intercepts to-date assaying 0.6% Cu over

57.8 m

."

Hilltop Mineralization

The Hilltop Zones were discovered in 2022 while testing an exploration target proximal to the Archimedes pit. At Hilltop,

zinc skarn mineralization is located proximal to the Graveyard Flats intrusive and transitions to CRD mineralization

westward along the Hilltop fault corridor. Mineralization has now been defined along the Hilltop fault structure over a strike

length of approximately 750 metres, and includes the Upper, Lower and East Hilltop Zones (see Figure 1). Definition and

step-out drilling suggests significant growth potential with mineralization remaining open for expansion. Highlight 2023 drill

results from the Hilltop zones include:

iRH23-54 – Upper Hilltop Zone:

8.8% Zn, 18.8% Pb, 332.9 g/t Ag & 0.6 g/t Au Over

32.0 m

iRH23-10 – East Hilltop Zone CRD:

9.7% Zn, 10.0% Pb, 226.1 g/t Ag & 0.5 g/t Au Over

8.4 m

iRH23-50 – East Hilltop Skarn (2 zones) southmost step-out to-date:

9.5% Zn, 0.3% Cu & 12.6 g/t Ag over

114.3 m

including

17.7% Zn, 0.4% Cu & 10.2 g/t Ag over

36.6 m

and

12.9% Zn, 0.6% Cu & 48.8 g/t Ag over

15.2 m

9.5% Zn, 0.8% Cu & 18.6 g/t Ag over

7.6 m

A single exploration hole (iRH23-55) drilled approximately 150 metres to the south of East Hilltop to test for potential

continuation of mineralization along the intrusive contact intersected a broad zone of skarn mineralization with four

narrower high-grade zones that include the highest silver grades intersected in skarn so far at Ruby Hill:

252.0 g/t Ag & 22.3% Zn over

1.5 m

1181.0 g/t Ag, 19.5% Zn, 10.2% Pb & 1.2% Cu over

1.5 m

125.0 g/t Ag, 13.7% Zn over

1.5 m

159.0 g/t Ag, 11.3% Zn over 5.6% Pb over

1.5 m

Blackjack Deposit

The Blackjack deposit consists of high-grade skarn mineralization located immediately below the Archimedes Pit, proximal

to the west contact of the Graveyard Flats intrusive (see Figure 1). Hole iRH23

18A is the southmost intercept in the

Blackjack deposit that remains open along strike to the north and south. These results will be included in an initial

resource estimate for this zone. Previously released results from the Blackjack deposit demonstrate high-grade

mineralization with highlight intercepts of:

iRH23-18A: 19.4% Zn, 19.2 g/t Ag and 0.4 g/t Au over

30.4 m

iRH23-29:

17.8% Zn, 0.8 % Pb, 59.8 g/t Ag & 0.9 g/t Au -

16.4 m

iRH23-41: 10.7% Zn & 37.0 g

/t Ag over

47.9 m

(skarn) & 15.6% Zn, 8.7% Pb, 420.4 g/t Ag & 0.6 g/t Au over

40.4 m

(CRD)

iRH23-42A: 10.1% Zn, 0.6% Pb, 37.0 g/t Ag & 0.3 g/t Au over

116.3 m

FAD Deposit

The FAD deposit is located approximately 2 km to the south of the Archimedes pit and the multiple polymetallic zones

being defined at Ruby Hill. Hole PC23-28 demonstrate the FAD deposit remains open for expansion to the east (see

figure 2). FAD is the most gold-rich of the polymetallic mineralized zones at Ruby Hill. Highlight results from i-80 and

Paycore drill program include:

PC22-07: 155.0 g/t Ag, 22.0% Zn & 1.5% Pb over

12.5 m

PC22-08A: 7.1 g/t Au, 376.0 g/t Ag, 6.3% Zn & 10.3% Pb over

14.8 m

PC22-10: 8.0 g/t Au, 79.0 g/t Ag, 10.0% Zn & 1.0% Pb over

27.4 m

PC23-22 – infill hole drilled on the western margin of the west FAD lobe (3 zones)

5.7 g/t Au, 159.4 g/t Ag, 15.0% Zn & 2.8% Pb over

5.4 m

13.7 g/t Au, 430.0 g/t Ag, 15.9% Zn & 7.7% Pb over

2.5 m

9.0 g/t Au, 92.4 g/t Ag, 12.2% Zn & 1.0% Pb over

14.6 m

PC23-28 – final hole and furthest hole drilled to the east in the east FAD lobe (6 zones)

1.9 g/t Au, 109.7 g/t Ag, 8.9% Zn & 0.2% Pb over

3.2 m

33.4 g/t Au, 87.7 g/t Ag, 7.1% Zn & 0.2% Pb over

2.1 m

7.6 g/t Au, 42.2 g/t Ag, & 6.3% Zn over

6.0 m

11.4 g/t Au, 65.8 g/t Ag, 0.6% Zn, & 0.2% Pb over

2.0 m

4.3 g/t Au, 41.3 g/t Ag, 12.0 % Zn & 0.2% Pb over

3.5 m

3.9 g/t Au, 185.6 g/t Ag, 11.1% Zn & 3.6% Pb over

25.4 m

Figure 1 – Hilltop Surface Plan (CNW Group/i-80 Gold Corp)

The deposits being drilled at Ruby Hill and FAD are situated within the Hilltop Corridor, a +2 km long, alluvial covered,

trend immediately south of the Archimedes pit that is largely untested by previous drilling. The Company has recently

completed geophysical surveys to cover this corridor and data is being compiled to help guide future exploration.

The

Eureka

(Ruby Hill) Mining District has a history of high-grade polymetallic CRD production that began in the 1860's

and spanned a period of more than one hundred years. Historic mined grades rank amongst the highest for any CRD

district in the world. The Ruby Hill Property is host to the only processing infrastructure within the

Eureka

District of the

Battle Mountain-Eureka Trend including an idle leach plant, an active heap leach facility, and is host to multiple gold, gold-

silver and polymetallic (base metal) deposits.

Figure 2 – Hilltop Cross-section (CNW Group/i-80 Gold Corp)

The Company has submitted for approval its plan to develop an underground mine at Ruby Hill with mineralization

accessed via a ramp from the Archimedes open pit. Work is also progressing for the completion of initial mineral resource

estimates on the polymetallic mineralization followed by initial economic study(s).

Please

click here

for further information on abbreviations and conversions referenced in this press release.

Table 1 – Highlight New Assay Results from Ruby Hill

Drillhole ID

Zone

Type

From (m)

To (m)

Length (m)

Au (g/t)

Ag (g/t)

Cu

(%)

Pb (%)

Zn (%)

iRH24-01

East Hilltop

Core

261.4

266.4

5.0

2.2

180.0

0.1

6.3

0.2

iRH24-02

East Hilltop

Core

289.5

293.0

3.6

1.0

198.0

0.1

5.6

6.2

And

East Hilltop

Core

391.5

396.9

5.5

0.6

93.7

0.1

2.5

13.4

iRH24-03

East Hilltop

Core

343.7

401.4

57.8

0.1

17.5

0.6

-

13.7

* True widths estimated at 75-95%. Numbers may not add due to rounding.

UTM

Drillhole ID

East m

North m

Elevation m

Azimuth

Dip

NAD83 Zone 11

iRH24-01

587522

4375184

1997

092

-72

iRH24-02

587636

4375089

1998

067

-82

iRH24-03

587637

4375086

1995

091

-77

QAQC Procedures

All samples were submitted to American Assay Laboratories (AAL) of

Sparks, NV

, which is an ISO 9001 and 17025

certified and accredited laboratory, independent of the Company. Samples submitted through AAL and are run through

standard prep methods and analyzed using FA-PB30-ICP (Au; 30g fire assay) and IO

4AB32 (35 element suite; 0.5g 4-

acid ICP-OES+MS). AAL undertakes their own internal coarse and pulp duplicate analysis to ensure proper sample

preparation and equipment calibration. i-80 Gold Corp's QA/QC program includes regular insertion of CRM standards,

duplicates, and blanks into the sample stream with a stringent review of all results.

Qualified Person

Tyler Hill

, CPG-12146, Chief Geologist at i-80 is the Qualified Person for the information contained in this press release

and is a Qualified Person within the meaning of National Instrument 43-101.

About i-80 Gold Corp.

i-80 Gold Corp.

is a

Nevada

-focused, mining company with a goal of achieving mid-tier gold producer status through the

development of multiple deposits within the Company's advanced-stage property portfolio with processing at i-80's

centralized milling facilities. i-80 Gold's common shares are listed on the TSX and the NYSE American under the trading

symbol IAU:TSX and IAUX:NYSE. Further information about i-80 Gold's portfolio of assets and long-term growth strategy

is available at

www.i80gold.com

or by email at

[email protected]

.

Certain statements in this release constitute "forward-looking statements" or "forward-looking information" within the

meaning of applicable securities laws, including but not limited to, the expansion or mineral resources at Ruby Hill and the

potential of the Ruby Hill project. Such statements and information involve known and unknown risks, uncertainties and

other factors that may cause the actual results, performance or achievements of the company, its projects, or industry

results, to be materially different from any future results, performance or achievements expressed or implied by such

forward-looking statements or information. Such statements can be identified by the use of words such as "may", "would",

"could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate", "scheduled", "forecast", "predict" and other

similar terminology, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur

or be achieved. These statements reflect the Company's current expectations regarding future events, performance and

results and speak only as of the date of this release.

Forward-looking statements and information involve significant risks and uncertainties, should not be read as guarantees

of future performance or results and will not necessarily be accurate indicators of whether or not such results will be

achieved. A number of factors could cause actual results to differ materially from the results discussed in the forward-

looking statements or information, including, but not limited to: material adverse changes, unexpected changes in laws,

rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with the company to

perform as agreed; social or labour unrest; changes in commodity prices; and the failure of exploration programs or

studies to deliver anticipated results or results that would justify and support continued exploration, studies, development

or operations.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/i-80-gold-provides-high-grade-results-from-drilling-at-ruby-hill-302070658.html

SOURCE

i-80 Gold Corp

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/February2024/26/c6520.html

%SEDAR: 00052022E

For further information:

Ewan Downie - CEO, Matt Gili - President & COO; Matthew Gollat - Executive Vice-President,

1.866.525.6450

CO: i-80 Gold Corp

CNW 06:00e 26-FEB-24