i-80 Gold Intersects High-Grade Gold in Underground Drilling at Granite Creek Including 10.7 g/t Au over 9.4 m , 8.2 g/t Au over 5.6 m & 14.5 g/t Au over 2.7 m

Drill Results

i-80 Gold Intersects High-Grade Gold in Underground Drilling at

Granite Creek

Including 10.7 g/t Au over

9.4 m

, 8.2 g/t Au over

5.6 m

& 14.5 g/t Au over

2.7 m

RENO, Nev.

,

Jan. 26, 2022

/CNW/ -

i-80 GOLD CORP

. (TSX: IAU) (OTCQX: IAUCF)

("i-80", or the "Company")

is pleased to

announce positive assay results from the ongoing underground drill program at the Company's Granite Creek Property ("

Granite Creek

"

or "

the Property

") located in

Humboldt County, Nevada

.

High-grade drill results from the 4790 Level targeting mineralization in the Otto,

Adam Peak

and Range Front fault horizons proximal to

and below existing mine workings are designed to confirm continuity in one of the initial areas being defined for underground mining (see

Table 1). The Otto,

Adam Peak

, and Range Front fault horizons are three of multiple target areas being drilled with several holes

intersecting gold mineralization in multiple horizons. The 2022 program has been upsized and is expected to comprise more than 30,000

metres (m) from surface and underground. The Company anticipates providing regular updates throughout the year as assay results are

received.

Highlight results from initial underground drilling (ten holes) from Level 4790 include:

20.3 g/t (grams per tonne) Au (gold) over

1.3 m

in hole iGU21-15

8.2 g/t Au over

5.6 m

in hole iGU21-17

14.5 g/t Au over

1.5 m

in hole iGU21-18

24.4 g/t Au over

1.2 m

in hole iGU21-22

14.5 g/t Au over

2.7 m

& 10.6 g/t over

1.5m

& 9.9 g/t over

1.1 m

in hole iGU21-23

10.7 g/t Au over

9.4 m

in hole iGU21-24

As part of the program targeting development and mining at Granite Creek, definition drilling utilizing two underground Cubex drills has

started in areas where encouraging assays results were received in 2021. This drilling is being completed to define initial stoping areas

as the Company advances towards a production decision.

The primary goal of the 2022 drill program is to delineate and expand underground mineralization as the Company ramps up mining on

the Property. It is expected that refractory mineralization from the underground operation at Granite Creek will initially be trucked to Twin

Creeks for processing, pursuant to the agreement entered into with

Nevada Gold Mines

, until such time that the Company's Lone Tree

facility is operational.

Matt Gili

, President and Chief Operating Officer of i-80 commented: "These results further confirm the high–grade opportunity that we

are developing at Granite Creek. We are focused on bringing these near–mine areas into reserves and then into production."

High-grade mineralization at Granite Creek occurs in a near-identical geological setting as that at the multi–million-ounce Turquoise Ridge

Mine located immediately to the north; proximal to a major regional fault (the Getchell or Range Front fault) on the eastern edge of the

large Osgood Mountains intrusive complex. The Granite Creek deposit remains open at depth and along strike from the existing

underground workings with step-out drilling aimed at expanding resources currently underway with multiple surface drill rigs.

Table 1 – Summary Assay Results from Level 4790 Drilling

New 2021 Drill Results from Granite Creek

Estimated true widths 50-90%

Drillhole ID

Type

From

(m)

To

(m)

Length

(m)

Au

(g/t)

iGU21-15

Core

6.3

7.6

1.3

20.3

iGU21-15

Core

73.1

73.8

0.7

10.9

iGU21-15

Core

98.5

99.2

0.7

10.0

iGU21-15

Core

102.8

105.5

2.7

6.8

iGU21-17

Core

15.8

21.5

5.6

8.2

iGU21-17

Core

27.1

29.9

2.7

5.5

iGU21-18

Core

95.7

97.2

1.5

14.5

iGU21-18

Core

116.4

117.2

0.8

19.0

iGU21-20

Core

34.9

35.9

1.0

12.8

iGU21-20

Core

58.2

61.0

2.7

5.8

iGU21-20

Core

87.8

90.5

2.7

5.6

iGU21-22

Core

48.8

50.0

1.2

24.4

iGU21-22

Core

101.8

103.3

1.5

5.2

iGU21-23

Core

16.8

19.5

2.7

14.5

iGU21-23

Core

27.2

28.7

1.6

10.6

iGU21-23

Core

30.9

32.0

1.1

9.9

iGU21-24

Core

82.9

92.4

9.4

10.7

Holes iGU21-16, iGU21-19, and iGU21-21 contained no significant intercepts

Table 1a

Collar Coordinates

UTM

Drillhole ID

East m

North m

Elevation m

Azimuth

Dip

iGU21-15

478062

4554228

1460

340

-26

iGU21-16

478062

4554228

1460

328

-35

iGU21-17

478062

4554228

1460

354

-67

iGU21-18

478062

4554228

1460

343

-45

iGU21-19

478062

4554228

1460

312

7

iGU21-20

478062

4554228

1460

300

7

iGU21-21

478062

4554228

1460

291

-22

iGU21-22

478062

4554228

1460

285

-25

NAD83 Zone 11

iGU21-23

478062

4554228

1460

346

-72

iGU21-24

478062

4554228

1460

329

-28

Figure 1 – 3D View of Mineralized Zones Being Drilled from Underground Workings (CNW Group/i-80 Gold Corp)

The Granite Creek Property is strategically located proximal to

Nevada Gold Mines'

Turquoise Ridge and Twin Creeks mines at the

north end of the Battle Mountain-Eureka Trend, at its intersection with the Getchell gold belt in

Nevada

(See Figure 2).

Figure 2 – Property Location Map (CNW Group/i-80 Gold Corp)

QAQC Procedures

All samples were submitted to Paragon Geochemical Assay Laboratories (PAL) of

Sparks, NV

, which is an ISO 9001 and 17025

certified and accredited laboratory, independent of the Company. Samples submitted through PAL are run through standard prep

methods and analyzed using FA-Pb30-ICP (Au; 30g fire assay) and 48MA-MS (48 element Suite; 0.5g 4-acid digestion/ICP-MS)

methods. PAL also undertake their own internal coarse and pulp duplicate analysis to ensure proper sample preparation and equipment

calibration. i-80 Gold Corp's QA/QC program includes regular insertion of CRM standards, duplicates, and blanks into the sample

stream with a stringent review of all results.

Qualified Person

Tim George, PE, Manager of Engineering Services, reviewed the technical and scientific information contained in this press release and

is a Qualified Person within the meaning of NI 43-101.

About i-80 Gold Corp.

i-80 Gold Corp.

is a well-financed, Nevada-focused, mining company with a goal of achieving mid-tier gold producer status through the

development of four new open pit and underground mining operations that will ultimately process ore at the Company's central Lone Tree

complex that includes an Autoclave.

Certain statements in this release constitute "forward-looking statements" or "forward-looking information" within the meaning of

applicable securities laws, including but not limited to, completion of refurbishment and development activities at the Long Tree project,

commencement of mining operations at the Lone Tree project or the Ruby Hill mine development activities at the Company's projects and

resource updates in respect of certain properties, the objectives set out under 2022 Scorecard – Key Goals & Catalysts in this press

release and the ESG initiatives. Such statements and information involve known and unknown risks, uncertainties and other factors that

may cause the actual results, performance or achievements of the company, its projects, or industry results, to be materially different

from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such

statements can be identified by the use of words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate",

"estimate", "scheduled", "forecast", "predict" and other similar terminology, or state that certain actions, events or results "may", "could",

"would", "might" or "will" be taken, occur or be achieved. These statements reflect the Company's current expectations regarding future

events, performance and results and speak only as of the date of this release.

Forward-looking statements and information involve significant risks and uncertainties, should not be read as guarantees of future

performance or results and will not necessarily be accurate indicators of whether or not such results will be achieved. A number of

factors could cause actual results to differ materially from the results discussed in the forward-looking statements or information,

including, but not limited to: failure to obtain the relevant regulatory approvals, material adverse changes, exercise of termination rights

by any relevant party, unexpected changes in laws, the failure of parties to contracts with the company to perform as agreed; social or

labour unrest; changes in commodity prices; and the failure of exploration, refurbishment, development or mining programs or studies to

deliver anticipated results or results that would justify and support continued exploration, studies, development or operations.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/i-80-gold-intersects-high-grade-gold-in-underground-drilling-at-granite-creek-301468492.html

SOURCE

i-80 Gold Corp

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/January2022/26/c9741.html

%SEDAR: 00052022E

For further information:

PLEASE CONTACT: Ewan Downie - CEO, Matt Gili - President & COO, Matthew Gollat - EVP Business &

Corporate Development, [email protected], www.i80gold.com

CO: i-80 Gold Corp

CNW 06:00e 26-JAN-22