Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

IAU.TO ·

i-80 Gold Announces Best Results To-date from Underground Drilling at Cove Results Include 18.9 g/t Gold 29.3 m and 14.9 g/t Gold over 32.7 m and 15.7 g/t Au over 22.5 m

Drill Results

i-80 Gold Announces Best Results To-date from Underground

Drilling at Cove

Results Include 18.9 g/t Gold

29.3 m

and

14.9 g/t Gold over

32.7 m

and

15.7 g/t Au over

22.5 m

RENO, Nev.

,

July 10, 2023

/CNW/ -

i-80 GOLD CORP.

(TSX: IAU) (NYSE: IAUX)

("i-80",

or the

"Company")

is pleased to announce

positive results from two additional underground drill holes at the Company's 100%

owned McCoy-Cove Property ("

Cove

" or "

the

Property

") located in

Lander County, Nevada

. The new results include the best intercepts to date and continue to demonstrate

continuity of high-grade mineralization in the CSD/Gap Zone.

Highlight results from recent 2023 drilling at Cove include:

iCHU23-10:

14.9 g/t Au over

32.7 m

, including 22.8 g/t Au over

14.8 m

iCHU23-11 :

15.7 g/t Au over

22.5 m

, including 21.

8 g/t Au over

11.5 m

and

18.9 g/t Au over

29.3 m

, including 27.8 g/t Au over

14.9 m

The ongoing program, expected to consist of approximately 40,000 metres of drilling, is being completed on 30 metre spacing in

advance of an updated resource estimate and economic study related to the construction of mining operation at McCoy-Cove. This

program is focused on the CSD/Gap and

Helen Zone

portions (Figures 1 & 2) of the deposit which also includes mineralization below

the pit in the Cove South Deep and 2201 deposits that are not being drilled as part of this program.

"Grades and widths continue to meet or exceed expectations and are consistently at or above the current resource grade.", stated

Tyler

Hill

, Chief Geologist of i-80 Gold. "With the Phase 1 underground decline nearing completion, the focus will shift entirely to the drill

program, permitting and final mine approvals."

Figure 1 – 3D View of the Cove Deposit and Drill Program (CNW Group/i-80 Gold Corp)

Figure 2 – 3D Section View Gap Drill Program (CNW Group/i-80 Gold Corp)

Cove is one of three projects currently being advanced to realize the Company's goal of becoming the second largest gold producer in

Nevada

. In addition to the underground drill program, the exploration and development program will also include the completion of the

first phase of the underground decline and drift, and detailed hydrological and metallurgical test work in advance of completing a

Feasibility Study following the underground definition drill program.

Table 1 – Highlight Assay Results from Cove Underground Drilling

New 2023 results from McCoy-Cove, estimated true thickness 80-95%

Drillhole ID

Zone

Type

From (m)

To (m)

Length (m)

Au (g/t)

iCHU23-10

CSD Gap

Core

303.0

335.7

32.7

14.9

including

CSD Gap

Core

320.8

335.7

14.8

22.8

iCHU23-11

CSD Gap

Core

306.6

329.2

22.5

15.7

including

CSD Gap

Core

317.6

329.2

11.5

21.8

and

CSD Gap

Core

334.4

363.6

29.3

18.9

including

CSD Gap

Core

334.4

349.2

14.9

27.8

UTM

Drillhole ID

East m

North m

Elevation m

Azimuth

Dip

NAD83 Zone 11

iCHU23-10

482202

4465759

1416

167

-85

iCHU23-11

482202

4465760

1417

184

-83

The ongoing infill and step-out drill program will aide in the advancement of the Company's plan to develop an underground mine at Cove

utilizing the current decline with material anticipated to be trucked to the Company's

Lone Tree

facility, once operational, for processing

in addition to

Nevada Gold Mines

pursuant to the processing agreement between the two companies. Following the underground drill

program, i-80 plans to complete an updated mineral resource estimate and a Feasibility Study.

Cove is one of the Company's primary assets and is host to a resource of:

Mineral Resources

1

Tonnage

Au Grade

Ag Grade

Gold

Silver

(kt)

(g/t)

(g/t)

(koz)

(koz)

Indicated

1,007

10.9

29.1

351

943

Inferred

3,867

10.9

20.6

1,353

2,565

1. Mineral Resources were calculated at a gold price of US$1500/oz, cut-off grade 0.141 opt Au, and is based on the Preliminary

Economic Assessment issued by i-80 on April 13, 2021 and an effective date of January 1, 2021.

Please

click here

for further information on abbreviations and conversions referenced in this press release.

QAQC Procedures

All samples were submitted to ALS Minerals (ALS) of

Sparks, NV

, which is an ISO 9001 and 17025 certified and accredited laboratory,

independent of the Company. Samples submitted through ALS are run through standard prep methods and analysed using Au-AA23

(ALS) (Au; 30g fire assay) and ME-MS61 (35 element suite; 0.4g 4 acid/ICP-AES). ALS also undertakes their own internal coarse and

pulp duplicate analysis to ensure proper sample preparation and equipment calibration. i-80 Gold Corp's QA/QC program includes

regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results.

Qualified Person

Tyler Hill

, CPG-12146, Chief Geologist at i-80 is the Qualified Person for the information contained in this press release and is a

Qualified Person within the meaning of National Instrument 43-101.

About i-80 Gold Corp.

i-80 Gold Corp.

is a Nevada-focused, mining company with a goal of achieving mid-tier gold producer status through the development

of multiple deposits within the Company's advanced-stage property portfolio with processing at i-80's centralized milling facilities. i-80

Gold's common shares are listed on the TSX and the NYSE American under the trading symbol IAU:TSX and IAUX:NYSE. Further

information about i-80 Gold's portfolio of assets and long-term growth strategy is available at

www.i80gold.com

or by email at

[email protected]

.

Certain statements in this release constitute "forward-looking statements" or "forward-looking information" within the meaning of

applicable securities laws, including but not limited to, the expansion or mineral resources at McCoy-Cove and the potential of the Cove

project. Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual

results, performance or achievements of the company, its projects, or industry results, to be materially different from any future results,

performance or achievements expressed or implied by such forward-looking statements or information. Such statements can be

identified by the use of words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate",

"scheduled", "forecast", "predict" and other similar terminology, or state that certain actions, events or results "may", "could", "would",

"might" or "will" be taken, occur or be achieved. These statements reflect the Company's current expectations regarding future events,

performance and results and speak only as of the date of this release.

Forward-looking statements and information involve significant risks and uncertainties, should not be read as guarantees of future

performance or results and will not necessarily be accurate indicators of whether or not such results will be achieved. A number of

factors could cause actual results to differ materially from the results discussed in the forward-looking statements or information,

including, but not limited to: material adverse changes, unexpected changes in laws, rules or regulations, or their enforcement by

applicable authorities; the failure of parties to contracts with the company to perform as agreed; social or labour unrest; changes in

commodity prices; and the failure of exploration programs or studies to deliver anticipated results or results that would justify and

support continued exploration, studies, development or operations.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/i-80-gold-announces-best-results-to-date-from-underground-drilling-at-cove-301872578.html

SOURCE

i-80 Gold Corp

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/July2023/10/c2100.html

%SEDAR: 00052022E

For further information:

Please contact: Ewan Downie - CEO, Matt Gili - President & COO, Matthew Gollat - Executive Vice-

President, 1.866.525.6450, [email protected], www.i80gold.com

CO: i-80 Gold Corp

CNW 06:00e 10-JUL-23