Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

HVG.V ·

Harvest GOLD Options High Grade GOLD and Silver Project IN Mexico from Evrim Resources Corp.

Mergers & Acquisitions Property Options & Staking

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE

SERVICES OR DISSEMINATION IN THE UNITED STATES

HARVEST GOLD OPTIONS HIGH GRADE GOLD AND SILVER PROJECT IN

MEXICO FROM EVRIM RESOURCES CORP.

Vancouver, British Columbia, June 8, 2017- Harvest Gold Corporation (TSX.V: HVG)

(“Harvest Gold” or the “ Company”) and Evrim Resources Corp. (TSX.V: EVM) (“Evrim”) are

pleased to announce that they have entered into an Option Agreement whereby Harvest Gold can

earn up to an 80% interest in the high grade Cerro Cascaron gold/silver project in Mexico. The

project covers 69 square kilometers in an historic Colonial-era mining district in the prolific Sierra

Madre Occidental precious metals belt of western Chihuahua State, Mexico (Figure 1).

The Cerro Cascaron property hosts a low to intermediate sulfidation epithermal gold bearing system

and includes a high-grade gold vein field measuring approximately 20 square kilometers in area on

the eastern third of the property. Veining has been mapped over 900 vertical metres, with classic

textural evidence of hydrothermal boiling accompanying the highest gold grades. This boiling zone

has been established in the upper 380 metres of the vein field. Beneath the boiling zones, silver and

base metal rich veins and breccias provide additional exploration targets.

The property a lso contains a substantial silver rich breccia target (La Cascarita) located five

kilometers west of the currently defined gold field. Much of Cerro Cascaron is yet to explored

Harvest Gold’s’ President and CEO Rick Mark states: “After an ex tensive eight-month search for

a project we believe offers tremendous upside to our shareholders, we are pleased to announce the

option to acquire Cerro Cascaron in the Sierra Madre Occidental belt in Mexico. Cerro Cascaron

has the classic characteristics we believe the market will value: it has drill ready, high grade gold

and silver targets; it has district-scale potential; it is in a mining friendly jurisdiction: and, it is

situated in a world class mineral belt. Finally, Cerro Cascaron is undrilled.”

Mark further states: “Key to a successful option/JV agreement is a solid and open relationship. Our

partner Evrim Resources has been excellent to work with in reaching this deal. Their team has years

of market experience, knows the local environment well, is technically strong and are excellent

operators. Their work in discovering and doing initial exploration at Cerro Cascaron is to our great

advantage. I want to thank their CEO Paddy Nicol for his focus and fairness in the past two months

in getting this deal done. We look forward to advancing Cerro Cascaron together.”

About the Cerro Cascaron Project

Cerro Cascaron’s setting and mineralization is similar to many epithermal deposits in the Sierra

Madre Occidental, including Fresnillo PLC's La Cienega Mine in Durango , Goldcorp’s past

producing El Sauzal gold mine and further south, First Majestic’s San Martin de Bolanos silver

mine in Jalisco State). The property is approximately 55 kilometers southeast of Goldcorp Inc.’s

past-producing El Sauzal gold mine and is one of the few unexplored and undrilled opportunities

in the region.

HARVEST GOLD CORP.

Suite 804 – 750 West Pender Street

Vancouver, BC V6C 2T7

T: (604) 682-2928

F: (604) 685-6905

E: [email protected]

W: www.harvestgoldcorp.com

- 2 -

Highlights of Evrim’s Exploration Programs

• Veining has been mapped over 900 vertical metres, with classic textural evidence of

hydrothermal boiling accompanying the highest gold grades.

• Fourteen structurally-controlled epithermal gold -silver veins identified with strike

lengths ranging from 70 to 1,980 metres and a cumulative strike length of over 11

kilometres delineated to date

- 3 -

• Rock chip samples grade from <0.005 grams per tonne gold ("g/t") to 1,670 g/t gold

in the upper part of the system*

• The lower part of the system is characterized by silver and base metal rich veins with

rock chip samples grading from <0.5 g/t to 599 g/t silver*

• Mapping has defined competent quartz veins up to 1.5 metres wide and quartz breccia

veins/quartz healed faults and stockwork zones up to 25 metres wide

• Tourmaline rich breccias and veins with high grade gold values from 0.565 g/t to 39.7

g/t gold are present at the lowest elevations

• Channel samples collected perpendicular to strike have returned grades of 19 g/t gold

and 72.6 g/t silver over 0.8 metres within 2.6 metres grading 6.05 g/t gold and 28.3

g/t silver at the San Pedro vein, and 45 metres north along the vein, 10.5 g/t gold and

46.4 g/t silver over 0.9 metres within 4.3 metres grading 2.22 g/t gold and 10.9 g/t

silver

• Five kilometers to the west, the La Cascarita prospect contains intermediate

sulphidation silver dominant veins and breccias up to three metres wide and range

from 0.46 to a maximum of 982 g/t silver.

*Readers are cautioned that rock chip samples are selected samples and are not necessarily representative of the

mineralization hosted on the property. Readers should refer to Evrim’ s press releases dated June 8 and August 17, 2016

for a full description of their exploration results.

Mapping to date has focused within the vein field and contains multiple north-south trending veins

including the Serpiente Dorada, San Pedro, Julietta and Carabino veins. These north/south trending

veins are cut by east -west and northeast -southwest trending structures. The upper levels of the

veining occur at the contact between the Upper and Lower Volcanic Sequence.

Alain Charest, Evrim Resources' Vice President Exploration, Mexico, said: "The Cerro Cascaron

project continues to impress with high grade gold and silver systems spread over large areas on the

project. The channel sampling program has provided drill targets at San Pedro and Carabina,

confirmed our understanding of the controls on high grade epithermal mineralization, and increased

the cumulative strike length of the vein system. Sample results from the newly -recognized high-

grade silver La Cascarita prospect demonstrates the district scale of the project with most of the

property yet to be explored.”

- 4 -

Phase 1 Exploration Plans

A fully funded Phase 1 Field Program developed by Harvest Gold and Evrim is scheduled to begin

shortly and will require approximately two months with a budget of approximately $225 ,000.

Evrim’ s knowledgeable and experienced field crews will operate this program. The program will

include the opening of two historic adits, detailed mapping, sampling and prospecting on the main

vein field, La Cascarita, and a well altered and currently unexplored eastern extension of the vein

field that lies across a river v alley. The object of the Phase 1 program is to provide multiple drill

targets for a minimum 3,000 metre diamond drill program in the fall of 2017.

About the Cerro Cascaron Option Agreement

Under the terms of the Agreement, which is subject to TSX Venture Exchange ("TSX.V") approval,

Harvest can earn an initial 70% interest (the “Initial Interest”) in the Cerro Cascaron project by

incurring $6 million in exploration expenditures, making $900,000 in cash payments and issuing

2,000,000 shares to Evrim over a four year period. Evrim will be the operator during the Initial

Interest period.

Time Exploration (CDN) Cash (CDN) Shares

TSX.V Approval - - 1,000,000*

End of Y1 $1.0 million $200,000 -

End of Y2 $1.0 million $100,000 -

End of Y3 $2.0 million $100,000 -

End of Y4 $2.0 million $500,000 1,000,000**

TOTAL $6.0 million $900,000 2,000,000

- 5 -

* subject to a 12 month hold period and Harvest retains the right to repurchase the shares at a greater of the 20 day

volume weighted average price or the issue price at the end of year one.

** Harvest will issue the greater of 1,000,000 shares or 1% of the issued and outstanding shares of Harvest.

Once Harvest has earned its Initial Interest it will have a 90 day period during which it can elect to

earn an additional 10% (“Additional Interest”) for an aggregate 80% interest in the Project. To earn

the additional 10% interest Harvest has to make a cash payment of $200,000 (or 200,000 shares at

Evrim’s election) and fund a 43-101 compliant feasibility study (“Feasibility Study”) over a five

year period. Minimum annual exploration expenditures of $2.0 million are required during this

period and a $200,000 cash payment has to be made to Evrim if the minimum expenditures are not

met.

During the Initial Interest period, Harvest can defer exploration expenditures at the end of the

first, second or third anniversary for 12 months by making quarterly cash payments of $25,000 to

Evrim and maintaining all other cash payments and claim maintenance costs.

If Evrim’s interest in Cerro Cascaron is diluted to 10% or less, its interest will convert into a 2%

net smelter royalty (“NSR”). Evrim will retain the right to purchase half of a pre-existing 2% NSR

from a property vendor for US$2.5 million.

Harvest will also be responsible for all other claim maintenance and underlying vendor costs.

Detailed information on the Cerro Cascaron project, including detailed maps are available at the

Company’s website www.harvestgoldcorp.com.

Quality Assurance/Quality Control

Mr. Warren Bates, P. Geo (APGO#0211), the Company’s Director of Property Investigation, is the

Qualified Person for this press release for the purposes of National Instrument 43 -101, and has

reviewed and approved the technical information herein. Evrim Resources has advised that their

quality control procedure is as follows: Samples were delivered to ALS Global in Hermosillo,

Sonora for sample preparatio n and to the ALS laboratory in North Vancouver for analysis. The

Hermosillo facility has ISO 9001:2008 certification while the North Vancouver facility has ISO/IE

17025:2005 certification. Blank samples were inserted into the sample sequence for all chan nel

samples with noted visible gold with no indications of contamination. Samples were assayed for

gold by 30 gram fire assay and multi -element analysis by aqua regia and four -acid ICP

analysis. Selected samples with coarse or visible gold were re-analyzed by 50 gram screen metallic

assay.

About Harvest Gold

Harvest Gold is a gold and silver focused mineral exploration company with an experienced board

of directors and management whose collective geological and financing experience exceeds 200

years. Harvest currently holds three fully registered mineral conces sions on properties in the

Republic of Suriname: the Goliat-Tibiti, Gonini River and Oelemari concessions.

About Evrim Resources

Evrim Resources is a mineral exploration company whose goal is to participate in significant

exploration discoveries supported by a sustainable business model. The Company is well financed,

has a diver se range of quality projects and a database in Mexico and portions of southwestern

United States. The existing projects, and generation of quality exploration targets and ideas, are

advanced through option and joint venture agreements with industry partners to create shareholder

value. Evrim’s business plan also includes royalty creation utilizing the Company’s exploration

expertise and existing projects.

- 6 -

ON BEHALF OF THE BOARD OF DIRECTORS

Joel Matheson,

Director

Harvest Gold Corporation

For more information please contact:

Rick Mark or Jan Urata

@ 604.682.2928 or [email protected]

FORWARD-LOOKING STATEMENTS: This news release contains certain "forward -looking statements" within the

meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. Except for statements of

historical fact relating to the company, certain information contained herein constitutes forward -looking statements.

Forward-looking statements are fr equently characterized by words such as "plan," "expect," "project," "intend,"

"believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will"

occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are

made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to

differ materially from those projected in the forward-looking statements. These factors include the inherent risks involved

in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and

other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses,

uncertainties relating to the availability and costs of financing needed in the future and other factors. The Company

undertakes no obligation to update forward -looking statements if circumstances or management's estimates or opinions

should change. The reader is cautioned not to place undue reliance o n forward-looking statements. Neither the TSX

Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.