Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

HVG.V ·

Harvest Gold and Evrim Resources Complete Drilling at Cerro Cascaron

Drill Results Exploration Programs

Harvest Gold and Evrim Resources Complete Drilling at Cerro Cascaron

Vancouver B.C. – March 19, 2019: Harvest Gold Corporation (“Harvest Gold” or the “Company”)

(TSX.V: HVG), is pleased to announce final drill results at the Cerro Cascaron gold and silver project in

southwestern Chihuahua, Mexico. Harvest Gold and its JV partner Evrim Resources Corp (“ Evrim”)

have completed a total of ten diamond drill holes at Se rpiente Dorada, San Pedro and Cascarita for a total

of 2,255.40 metres. The assay results follow up the announcement made February 14, 2019.

Warren Bates, Harvest Gold’s Chief Geologist stat es: “The maiden drill program at Cerro Cascaron

demonstrates significant potential to discover a low to intermediate sulphidation epithermal gold deposit,

specifically at the Serpiente Dorada and San Pedro areas.   Drilling at Serpiente Dorada delineated a

significant structural corridor containing local hi gh-grade gold mineralization. Well-developed quartz

fissure veins within a broad stockwork containing m oderate gold grades and epithermal textures exists at

San Pedro, and drilling has aided in vectoring toward a deeper and possibly higher grade gold target.

Additional drilling is needed to follow up both areas and for exploration of several untested targets.”

Harvest Gold CEO Rick Mark states: “I would like to thank the excellent technical team composed of

Evrim and Harvest Gold management and geologists who planned and directed this drill program. As

Warren’s comments above indicate, we have learned a great deal about the gold vein field that so

attracted us to Cerro Cascaron, but will need more drilling to determine whether it hosts an ore body. Our

next step is to sit down with Evrim and review our options to continue the search for a gold deposit at

Cerro Cascaron. They have been an excellent part ner and we would like to continue the search with

them.”

Drill Program Highlights

Serpiente Dorada

• Drill hole SPT18-01 intersected 1.0 metre grading 20 .1 grams per tonne (g/t) gold and 22.5 g/t

silver from 225.5 metres downhole within 6.5 metres gr ading 3.29 g/t gold and 6.3 g/t silver from

224.5 metres (previously reported February 14, 2019);

• Drill hole SPT19-02 intersected 11.5 metres gradi ng 0.48 g/t gold and 3.9 g/t silver from 119.5

metres downhole and 1 metre grading 1.57 g/t gold and 1.2 g/t silver from 219 metres

San Pedro

• SPED19-02 intersected 4.8 metres grading 1.02 g/t gold and 13.0 g/t silver from 141 metres

downhole and 0.35 metres grading 5.39 g/t gold and 23.7 g/t silver from 154.45 metres downhole

(previously reported February 14, 2019);

• SPED19-03 intersected 2.4 metres grading 0.98 g/t gold and 36.6 g/t silver from 162.5 metres

downhole.

HARVEST GOLD CORP.

Suite 804 – 750 West Pender Street

Vancouver, BC V6C 2T7

T: (604) 682-2928

F: (604) 685-6905

E: [email protected]

W: www.harvestgoldcorp.com

2

About the Cerro Cascaron Drill Program

Ten drill holes have been completed with two holes at the Serpiente Dorada, four holes at San Pedro gold

targets, and four at the silver-rich Cascarita target.

Figure 1 – Map of the Cascaron vein field with Serpiente Dorada and San Pedro drilling shown

Serpiente Dorada

Drill hole SPT19-02 targeted the intersection of th e north-trending Serpiente Dorada and northeast-

trending La Julieta structures approximately 180 me tres north of SPT18-01. The hole drilled into a

sequence of rhyolitic and andesitic volcanic rocks with crosscutting hydrothermal breccias; a similar

setting as hole SPT18-01. A zone of pervasive silicif ication and quartz veining hosts a broad zone of

low-grade gold mineralization from 119.5 metres depth and a narrow zone of strong quartz veining hosts

the intersection from 219.0 metres. The true widths of the zone of silicification and strong quartz veining

are not known.

Drill holes SPT18-01 and SPT19-02 intersected the Serpiente Dorada structure over a strike length of

approximately 180 metres and also delineated a new struct ure or splay off the Serpiente Dorada structure.

Mineralization intersected in these holes comprises qua rtz veining and silicification where the Serpiente

Dorada structure intersects interpreted hydrotherm al breccias and a contact between andesitic and

rhyolitic volcanic rocks and presents a structural setting for additional drilling.

3

Figure 2a – Cross section of drill hole at Serpiente Dorada (A-A’) and Figure 2b – Cross section of drilling at San Pedro (B-B’)

San Pedro

Drilling at San Pedro has intersected a quartz vein beneath the shallow historic workings hosted in

rhyolitic tuff and andesite. Drill hole SPED19-02 intersected the quartz vein approximately 110 metres

beneath the workings at the contact between andesite and rhyolite and returned 4.8 metres grading 1.02

g/t gold and a separate higher grade interval of 5.39 g/t gold over 0.35 metres. Drill hole SPED19-03

intersected the San Pedro vein approximately 40 me tres beneath the vein in SPED19-02 and returned 2.4

metres grading 0.98 g/t gold from 162.5 metres downhole. Both SPED19-02 and SPED19-03 intersected

the banded San Pedro quartz vein and the vein in tersected in hole SPED19-03 also contained multi-

episodal chalcedonic quartz and quartz breccias. The textures observed in holes SPED19-02 and

SPED19-03 suggested that the vein in these holes is a bove the boiling zone where the best mineralization

is expected. Hole SPED19-04 was drilled to intersect the San Pedro Vein about 70 metres downdip from

the vein in SPED19-03 and intersected a zone of pervasive silicification and quartz veinlets with

anomalous gold and pathfinder elements. Additional drilling is recommended to test deeper targets along

strike within the system.

4

Figure 3 – “San Pedro vein intersected in hole SPED19-03”

Significant Intersection Table

Hole  From  

(m) 

To  

(m) 

Width  

(m) 

Gold  

(g/t) 

Silver 

(g/t) 

SPED18‐01  No significant assays 

SPED19‐02  141.0  145.8  4.8  1.02  13.0 

And  154.45  154.8  0.35  5.39  23.7 

SPED19‐03  162.5  166  3.5  0.74  26.5 

including  162.5  164.9  2.4  0.98  36.6 

SPED19‐04  No significant assays 

SPT18‐01  224.5  231.0  6.5  3.29  6.3 

Including  225.5  226.5  1.0  20.1  22.5 

SPT19‐02  119.5  131.0  11.5  0.48  3.9 

and  219.0  220.0  1.0  1.57  1.2 

All intervals given for mineralized intervals are core le ngths. The true widths of the intersections are not

known.

Drill Hole Information Table

Hole  Easting 

(m) 

Northing  

(m) 

Elevation 

(m) 

Azimuth 

(o) 

Dip 

(o) 

Hole Depth 

(m) 

SPED18‐01  246,222  2,949,475  1,883  276 ‐ 45  201.0 

SPED19‐02  246,222  2,949,475  1,883  220 ‐ 55  219.0 

SPED19‐03  246,222  2,949,475  1,883  220 ‐ 68  216.0 

SPED19‐04  246,309  2,949,410  1,919  270 ‐ 70  370.5 

SPT18‐01  248,404  2,947,705  1,677  270 ‐ 64  320.0 

SPT19‐02  248,370  2,947,880  1,733  270 ‐ 55  270.0 

CAS18‐01  240,533  2,947,389  1,360  060 ‐ 45  209.7 

5

CAS18‐02 1  240,556  2,947,295  1,301  070 ‐ 45  48.2 

CAS18‐02B  240,557  2,947,296  1,301  070 ‐ 45  201.0 

CAS18‐03  240,361  2,947,455  1,405  040 ‐ 60  200.0 

1. Hole was lost

About the Cerro Cascaron Project

The Cerro Cascaron property hosts a low to intermediate sulphidation epithermal gold system that

includes a gold-bearing vein in the eastern part of the property. Veining has been mapped over 900

vertical metres, with classic textural evidence of hydrothermal boiling accompanying the highest gold

grades. The proposed boiling zone has been established in the upper 380 metres of the vein field. Beneath

the boiling zones, silver and base metal rich veins and breccias provide additional exploration targets.

Cerro Cascaron's setting and mineralization are similar to many epithermal deposits in the Sierra Madre

Occidental, including Minera Frisco SAB's Ocampo Mine to the northwest, Coeur Mining Inc.’s

Palmarejo mine, and First Majestic Silver's San Martin de Bolaños silver mine.

Qualified Person Statement

The disclosure of technical or scientific information in this press release has been reviewed and approved

by Warren Bates, P.Geo. Chief Geologist for Harves t Gold. Mr. Bates serves as a Qualified Person under

the definition of National Instrument 43-101.

Core samples were delivered to ALS Global in Hermosillo, Sonora for sample preparation and to the ALS

laboratory in North Vancouver for analysis. The Hermosillo and North Vancouver facilities have ISO/IEC

17025:2017 certification. Field duplicate samples, bl ank samples and certified reference materials were

inserted into the sample sequence each at a frequency of one per 20 samples. Samples were assayed for

gold by 30 gram fire assay and multi-element analysis by four-acid and ICP analysis.

About Harvest Gold Corporation

Harvest Gold is a mineral exploration company presently advancing its Cerro Cascaron high grade

gold/silver project in Chihuahua State, Mexico, where an initial 3,000 metre drill program is underway.

Harvest can earn up to 80% of the Cerro Cascaron project through its Joint Venture with Evrim Resources

Corp.

Harvest Gold’s Board of Directors and management team are experienced in successful exploration and

have collective geological and financing experience exceeding 200 years.

ON BEHALF OF THE BOARD OF DIRECTORS:

Rick Mark,

President and CEO

For more information please contact:

Rick Mark or Jan Urata

@ 604.682.2928 or [email protected]

Neither TSX Venture Exchange nor its Regulation Serv ices Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

6

Forward Looking Information

This news release includes certain statements that may be deemed "forward looking stat ements". All statements in

this news release, other than statements of historical fact s, that address events or de velopments that Harvest Gold

Corporation (the " Company“) expects to occur, are fo rward looking statements. Forw ard looking statements are

statements that are not histor ical facts and are generally, but not always, identified by the words "expects", "plans",

"anticipates", "believes", "intends", "e stimates", "projects", "pot ential" and similar expressions, or that events or

conditions "will", "would", "may", "could" or "should" occur.

Although the Company believes the expectations expressed in such forward looking statements are based on

reasonable assumptions, such statements are not guarant ees of future performance and actual results may differ

materially from those in the forward looking statements . Factors that could cause the actual results to differ

materially from those in forward lookin g statements include market prices, exploitation and exploration successes,

and continued availability of capital and financing, and ge neral economic, market or business conditions. Investors

are cautioned that any such statements are not guarantees of future performan ce and actual results or developments

may differ materially from those projected in the forward looking statements. Forward looking statements are based

on the beliefs, estimates and opinions of the Company’s management on the date the statements are made. Except as

required by securities laws, the Company undertakes no obligation to update these forward looking statements in the

event that management's beliefs, estimates or opinions, or other factors, should change.