Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

HVG.V ·

GOLD Intersected at San Pedro and Serpiente Dorado Targets at Cerro Cascaron Project IN Mexico; Deeper Drilling C Ontinuing at San Pedro; Assays Pending FOR Last Three Holes

Drill Results

GOLD INTERSECTED AT SAN PEDRO AND SERPIENTE DORADO TARGETS AT

CERRO CASCARON PROJECT IN MEXICO; DEEPER DRILLING C ONTINUING AT

SAN PEDRO; ASSAYS PENDING FOR LAST THREE HOLES

Vancouver, British Columbia / February 14, 2019 – Harvest Gold Corporation (TSX.V: HVG) (the

“ Company ”) is pleased to announce drill results at the Cerr o Cascaron gold and silver project in

southwestern Chihuahua, Mexico. Evrim Resources Co rp. and the Company have completed nine

diamond drill holes to date at Serpiente Dorada, Sa n Pedro and Cascarita for a total of 1,885 metres, with

assay results received from seven drill holes.

Harvest Gold CEO, Rick Mark, states: “The maiden dr ill program at Cerro Cascaron successfully

intersected gold mineralization at both the San Ped ro and Serpiente Dorada areas. Highlights are below .

We are particularly excited about the immediate pro spects for the San Pedro target and have committed

an additional $30,000USD to repurpose our last drill hole to go deeper at San Pedro.”

Harvest Gold Chief Geologist Warren Bates states: “ We have decided to go deeper at San Pedro because

the vein intersected in holes 2 and 3 (SPED19-02 an d SPED19-03) contains banded chalcedonic quartz

and calcite with quartz-healed breccia channels ind icative of multiple phases of vein formation. The

textures suggest a level near to, but above, a boil ing zone (where the best mineralization is to be

expected), so we are targeting a potential minerali zed shoot with better mineralization approximately 100

metres deeper than hole SPED19-03. This fourth hole at San Pedro is underway.”

Assays are pending for three holes, two at San Pedr o and one at Serpiente Dorada, where earlier drilli ng

delineated a significant corridor of alteration containing local high-grade gold mineralization.

Drill Program Highlights

San Pedro

• SPED19-02 intersected 4.8 metres grading 1.02 g/t gold and 13 .0 g/t silver from 141 metres

downhole and 0.35 metres grading 5.39 g/t gold and 23.7 g/t silver from 154.45 metres

downhole.

• SPED19-03 intersected a 2.7-metre-wide quartz vein from 162.6 metres downhole. Assays

are pending.

Serpiente Dorada

• Drill hole SPT18-01 intersected 1.0 metre grading 20.1 grams per tonne (g/t) gold and 22.5

g/t silver from 225.5 metres downhole within 6.5 metres grading 3.29 g/t gold and 6.3 g/t

silver from 224.5 metres.

The true width of the mineralized zones are not known at this stage.

HARVEST GOLD CORP.

Suite 804 – 750 West Pender Street

Vancouver, BC V6C 2T7

T: (604) 682-2928

F: (604) 685-6905

E: [email protected]

W: www.harvestgoldcorp.com

2

Figure 1 – Map of the Cascaron vienfield with Serpi ente Dorada and San Pedro drilling shown

San Pedro Summary

Drilling at San Pedro has intersected a quartz vein beneath the shallow historic workings hosted in

rhyolitic tuff and andesite. Drill hole SPED19-02 intersected a 1.8 metre wide quartz vein within an

approximate 20 metre stockwork zone. The zone incl udes 4.8 metres grading 1.05 g/t gold and 15.8 g/t

silver from 141 metres downhole with a slightly dee per narrow vein returning 0.35 metres grading 5.39

g/t gold and 23.7 g/t silver from 154.45 metres dow nhole. The true width of the structures are not kn own

at this stage. Follow-up drill hole SPED19-03, int ersected a 2.7 metre wide vein from 162.6 metres

within a broader 33.5 metre surrounding stockwork z one. Assays results remain pending for drill hole

SPED19-03.

The vein intersected in holes SPED19-02 and SPED19-03 contains banded chalcedonic quartz and calcite

with quartz-healed breccia channels indicative of multiple phases of vein formation. The textures suggest

a level near to, but above a boiling zone (where th e best mineralization is to be expected) and

subsequently, a fourth hole at San Pedro is planned to target a potential mineralized shoot with bette r

mineralization approximately 100 metres deeper than hole SPED19-03.

In drill hole SPED18-01 located 72 metres to the no rth, the zone consists of a zone of minor calcite a nd

quartz veinlets with strong pathfinder element geoc hemistry but only anomalous gold values, suggesting

that best target will be at depth rather than in vein extensions to the north.

3

Figure 2a - Cross section of drill hole at Serpient e Dorada (A-A’) and Figure 2b - Cross section of dr illing at San Pedro

(B-B’)

Serpiente Dorada Summary

Drill hole SPT18-01 targeted the Serpiente Dorada v ein approximately 100 metres below surface. The

hole drilled into a sequence of rhyolitic and andes itic volcanic rocks with overprinting hydrothermal

breccias. A wide zone of silicification and quartz stockwork veining exploits the margins of the brec cias

in the lower half of drill hole SPT18-01 and hosts many narrow low-grade mineralized intersections along

with the highlighted 1.0 metre grading 20.1 g/t gold and 22.5 g/t silver from 225.5 metres downhole. The

true width of the zone of silicification and stockwork quartz veining is not known.

The intersection encountered in SPT18-01 may be a new structure or a splay of the outcropping Serpiente

Dorada structure. A zone of elevated pathfinder el ement geochemistry exists at the base of the hole t hat

corresponds with the projection of the surface expr ession of the Serpiente Dorada structure. A follow -up

drill hole has been designed to target this zone of mineralization approximately 180 metres to the nor th

where the northeast-trending La Julieta vein is interpreted to intersect the Serpiente Dorada structure.

Cascarita Summary

Three drill holes at Cascarita intersected a predominately rhyolitic tuff sequence with zones of

silicification and veining throughout each hole. Veinlets are predominantly crystalline quartz with rare

colloform quartz and no significant results were intersected. The zones of sulphide breccia with high

silver grades at surface were not intersected in drilling.

4

Cerro Cascaron Drill Program Summary

A total of nine drill holes have been completed to date with two holes at the Serpiente Dorada, three

holes at San Pedro gold targets, and four at the silver-rich Cascarita target. Assay results remain pending

from three holes, one at at Serpiente Dorada and two at San Pedro.

Significant Intersection Table

Hole From

(m)

To

(m)

Width

(m)

Gold

(g/t)

Silver

(g/t) Comment

SPED18-01 No Significant Result

SPED19-02 141.0 145.8 4.8 1.02 13.0

And 154.45 154.8 0.35 5.39 23.7

SPED19-03 Assays Pending

SPT18-01 224.5 231.0 6.5 3.29 6.3

Including 225.5 226.5 1.0 20.1 22.5

SPT19-02 Assays Pending

Drill Hole Information Table

Hole Easting

(m)

Northing

(m)

Elevation

(m)

Azimuth

(o)

Dip

(o)

Hole Depth

(m)

SPED18 -01 246 ,222 2,949 ,475 1,883 27 0 -45 201.0

SPED19 -02 246 ,222 2,949 ,475 1,883 220 -55 219.0

SPED19 -03 246 ,222 2,949 ,475 1,883 220 -68 216.0

SPT18 -01 248 ,404 2,947 ,705 1,677 270 -64 320.0

SPT19 -02 248 ,370 2,947 ,880 1,733 270 -55 27 0.0

CAS18 -01 240 ,533 2,947 ,389 1,360 060 -45 209.7

CAS18 -02B 240 ,557 2,947 ,29 6 1,301 060 -45 201.0

CAS18 -03 240 ,361 2,947 ,455 1,405 040 -60 200.0

About the Cerro Cascaron Project

The Cerro Cascaron property hosts a low to intermed iate sulphidation epithermal gold system that

includes a gold-bearing vein in the eastern part of the property. Veining has been mapped over 900

vertical metres, with classic textural evidence of hydrothermal boiling accompanying the highest gold

grades. The proposed boiling zone has been established in the upper 380 metres of the vein field. Beneath

the boiling zones, silver and base metal rich veins and breccias provide additional exploration targets.

Cerro Cascaron's setting and mineralization are sim ilar to many epithermal deposits in the Sierra Madr e

Occidental, including Minera Frisco SAB's Ocampo Mi ne to the northwest, Coeur Mining Inc.’s

Palmarejo mine, and First Majestic Silver's San Martin de Bolanos silver mine.

Qualified Person Statement

The disclosure of technical or scientific informati on in this press release has been reviewed and appr oved

by Warren Bates, P.Geo. Chief Geologist for Harvest Gold. Mr. Bates serves as a Qualified Person under

the definition of National Instrument 43-101.

5

Core samples were delivered to ALS Global in Hermosillo, Sonora for sample preparation and to the ALS

laboratory in North Vancouver for analysis. The Hermosillo and North Vancouver facilities have ISO/IEC

17025:2017 certification. Field duplicate samples, blank samples and certified reference materials wer e

inserted into the sample sequence each at a frequen cy of one per 20 samples. Samples were assayed for

gold by 30-gram fire assay and multi-element analysis by four-acid and ICP analysis.

About Harvest Gold Corporation

Harvest Gold is a mineral exploration company prese ntly advancing its Cerro Cascaron high grade

gold/silver project in Chihuahua State, Mexico, whe re an initial 3,000 metre drill program is underway .

Harvest can earn up to 80% of the Cerro Cascaron project through its Joint Venture with Evrim Resources

Corp.

Harvest Gold’s Board of Directors and management te am are experienced in successful exploration and

have collective geological and financing experience exceeding 200 years.

ON BEHALF OF THE BOARD OF DIRECTORS:

Rick Mark,

President and CEO

For more information please contact:

Rick Mark or Jan Urata

@ 604.682.2928 or [email protected]

Neither TSX Venture Exchange nor its Regulation Ser vices Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Information

This news release includes certain statements that may be deemed "forward looking statements". All

statements in this news release, other than stateme nts of historical facts, that address events or

developments that Harvest Gold Corporation (the "C ompany“) expects to occur, are forward looking

statements. Forward looking statements are statemen ts that are not historical facts and are generally, but

not always, identified by the words "expects", "pla ns", "anticipates", "believes", "intends", "estimat es",

"projects", "potential" and similar expressions, or that events or conditions "will", "would", "may",

"could" or "should" occur.

Although the Company believes the expectations expr essed in such forward looking statements are based

on reasonable assumptions, such statements are not guarantees of future performance and actual results

may differ materially from those in the forward loo king statements. Factors that could cause the actua l

results to differ materially from those in forward looking statements include market prices, exploitat ion

and exploration successes, and continued availabili ty of capital and financing, and general economic,

market or business conditions. Investors are cautio ned that any such statements are not guarantees of

future performance and actual results or developmen ts may differ materially from those projected in th e

forward looking statements. Forward looking stateme nts are based on the beliefs, estimates and opinion s

of the Company’s management on the date the statements are made. Except as required by securities laws,

the Company undertakes no obligation to update thes e forward looking statements in the event that

management's beliefs, estimates or opinions, or other factors, should change.