Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

HVG.V ·

Cerro Cascaron Drill Permitting Underway

Permits & Approvals

CERRO CASCARON DRILL PERMITTING UNDERWAY

Vancouver, British Columbia, Decemb er 14, 2017 Harvest Gold Corporation (TSX.V:HVG)

(“Harvest Gold” or the “ Company”) is pleased to announce that the permitting process to

conduct a 3,000 m diamond drilling exploration program at the high-grade Cerro Cascaron gold-

silver project in Mexico is underway. The drill program is anticipated to include up to 30 holes

from 50 to 300 metres in length and will require approximately 45-60 days to complete.

The Cerro Cascaron project covers 69 square kilometr es in a historic Colonial-era mining district

in the prolific Sierra Madre Occidental (“SMO”) precious metals belt of western Chihuahua State.

Harvest Gold has the right to ear n up to an 80% interest in Cerro Cascaron from Evrim Resources

Corp. (“Evrim”) (TSX.V:EVM) by incurring certain exploration expenditures, making cash and

share payments and delivering a 43-101 compliant feasibility study.

Harvest Gold’s President and CEO Rick Mark states: “Recently a meeting of the Harvest

Gold/Evrim Resources geological team was held in Vancouver. Priority drill targets were selected

in both the main Cascaron gold vein field a nd the silver-rich Cascarita prospect. With the

knowledge gained from the fall 2017 Phase 1 explora tion program, which included rock and soil

sampling results, geologic mapping and adit sampling results, we have a high level of confidence

in our targeting and are looking forward to having these high priority targ ets tested. Our Joint

Venture partner expects the drill permitting process to be complete by the end of January.”

Cerro Cascaron Phase 1 Exploration Highlights

• Soil sampling defined 1.8-kilometre-long go ld – rich vein corridor extending north

and east of the Julieta and Serpiente Do rada veins and includes a sample that

assayed 1.38 grams per tonne (g/t) and is a high priority target for drill testing

• Soil sampling extended all veins by 600 to 1,800 metres in strike length

• Mapping following soil sampling defined new veins (El Salto and El Tascate) within

the Cascaron vein field with a total of 16 veins now identified in the vein field

• Sampling of adits at the Cascarita silver/ polymetallic showing returned five channel

sample cuts with widths of 1.4 to 3.3 metres that grade between 231 and 542 g/t silver

equivalent*

• Six sub-parallel veins were defined over an area of 300 metres x 900 metres in silver

rich Cascarita area

About the Cerro Cascaron Project

HARVEST GOLD CORP.

Suite 804 – 750 West Pender Street

Vancouver, BC V6C 2T7

T: (604) 682-2928

F: (604) 685-6905

E: [email protected]

W: www.harvestgoldcorp.com

- 2 -

The Cerro Cascaron property hosts a low to inte rmediate sulphidation ep ithermal gold bearing

system and includes a high-grade gold vein field measuring approximately 18 square kilometres in

area on the eastern third of the property. Veining has been mapped on a cliff face for over 900

vertical metres, with classic textural evid ence of multiple phases of hydrothermal boiling

accompanying the highest gold grades. These boiling zones have been established in the upper 380

metres of the vein field. Beneath the boiling zones, silver- and base metal-rich veins and breccias

provide additional exploration targets.

Cerro Cascaron’s setting and mineralization is sim ilar to many epithermal deposits in the Sierra

Madre Occidental, including Fresnillo PLC's La Cienega Mine in Durango, Goldcorp’s past

producing El Sauzal gold mine and further south, First Majestic’s San Mar tin de Bolanos silver

mine in Jalisco State. The property is approxima tely 55 kilometres southeast of Goldcorp Inc.’s

past-producing El Sauzal gold mine and is on e of the few unexplored and undrilled opportunities

in the region.

Readers should refer to Evrim’s press releases dated June 8 and August 17, 2016 and Harvest Gold

press releases dated June 8 and 15 and Octobe r 5 and 18 and November 27, 2017 for a full

description of previous exploration results.

Quality Assurance/Quality Control

Mr. Warren Bates, P. Geo (APGO#0211), the Company’s Director of Property Investigation, is the

Qualified Person for this press release for the pu rposes of National Instrument 43-101, and has

reviewed and approved the technical information herein.

Evrim Resources has advised that their quality c ontrol procedure is as follows: Samples were

delivered to ALS Global in Hermosillo, Sonora for sample preparation and to the ALS laboratory

in North Vancouver for analysis. The Hermos illo facility has ISO 9001:2008 certification while

the North Vancouver facility has ISO/IE 17025:20 05 certification. Blank soil samples were

inserted into the sample sequence at a frequency of one per 40 samples. Samples were assayed for

gold by 30 gram fire assay and multi-element analysis by aqua regia and ICP analysis.

About Harvest Gold

Harvest Gold is a gold-focused mineral explor ation company with an experienced board of

directors and management whose collective ge ological and financing experience exceeds 200

years. Harvest also holds three fully registered mineral concessions on properties in the Republic

of Suriname: the Goliat-Tibiti, Gonini River and Oelemari concessions.

About Evrim Resources

Evrim Resources is a mineral exploration compa ny whose goal is to participate in significant

exploration discoveries supported by a sustainable business model. The Company is well financed,

has a diverse range of quality projects and a data base in Mexico and portions of the southwestern

United States. The existing projects, and generati on of quality exploration targets and ideas, are

advanced through option and joint venture agreements with industry partners to create shareholder

value. Evrim’s business plan also includes royalty creation utiliz ing the Company’s exploration

expertise and existing projects.

ON BEHALF OF THE BOARD OF DIRECTORS

- 3 -

Rick Mark

President and CEO

Harvest Gold Corporation

For more information please contact:

Rick Mark or Jan Urata

@ 604.682.2928 or [email protected]

FORWARD-LOOKING STATEMENTS: This ne ws release contains certain "for ward-looking statements" within the

meaning of Section 21E of the United Stat es Securities Exchange Act of 1934, as amended. Except for statements of

historical fact relating to the company, certain informa tion contained herein constitutes forward-looking statements.

Forward-looking statements are frequentl y characterized by words such as "p lan," "expect," "pro ject," "intend,"

"believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or

"will" occur. Forward-looking statements are based on the op inions and estimates of management at the date the

statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual

events or results to differ materially from those projected in the forward-looking statemen ts. These factors include the

inherent risks involved in the explor ation and development of mineral prop erties, the uncertainties involved in

interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or

unanticipated costs and expenses, uncertainties relating to the availability and costs of financing needed in the future and

other factors. The Company undertakes no obligation to update forward-looking statem ents if circumstances or

management's estimates or opinions shoul d change. The reader is cautioned no t to place undue reli ance on forward-

looking statements. Neither the TSX Venture Exchange nor its Regulation Se rvices Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.