Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

HSTR.V ·

Heliostar Drills 83.2m Grading 17.35 g/t Gold from 76.0m and Expands Program to 20,000m

Drill Results

595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045

TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1

Heliostar Drills 83.2m Grading 17.35 g/t Gold from

76.0m and Expands Program to 20,000m

HIGHLIGHTS:

• 83.2m grading 17.35 g/t gold from 76.0 m, including

o 46.65 m grading 27.35 g/t gold from 88.95 m

• 70.7m grading 9.38 g/t gold from 49.65 m

• 92.1 m grading 4.33 g/t gold from 97.1 m

• 65.2 m grading 5.39 g/t gold from 152.2 m

• Ana Paula drill program to be extended to 20,000 metres of drilling

Vancouver, Canada – November 24, 2025 – Heliostar Metals Ltd. (TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1)

(“Heliostar” or the “Company”) is pleased to announce additional results from the current drill program at

its 100% owned Ana Paula project in Guerrero, Mexico . The program aims to convert inferred ounces to

higher confidence classifications . It will also support the ongoing Feasibility Study and testing the next

exploration targets around the Ana Paula deposit.

Heliostar CEO, Charles Funk, commented , “It’s rare to find a deposit that consistently produces 50-100m

wide drill intercepts of these gold grades. Ana Paula is wide, high- grade, and shallow, with good

underground mining conditions. These factors drive the low $1,011 all in sustaining cost in our new PEA for

the project. It will also drive high margins at the project. The current program is focused on upgrading

inferred ounces to higher confidence categories and the new data will be incorporated in to a Feasibility

Study. The lower costs drive a lower cut -off grade in the planned mine that opens the potential for more

inferred material conversion. To maximize this opportunity, we will expand the program by 33% to 20,000

metres to allow for more infill and exploration drilling at Ana Paula. Across the Company, we have another

study, a Prefeasibility Study for Cerro del Gallo, planned this quarter. We are also drilling at San Agustin and

La Colorada. These programs should increase production and unlock the value we see in our deep growth

portfolio.”

Drilling Program

Heliostar has completed 44 holes and 12,615 metres drilled to date. Drilling is designed along north-south

sections with angled holes to be tter define the overall east-west orientation of the High Grade Panel.

Heliostar’s drilling approach at Ana Paula has been to change the direction of drilling by approximately 90

degrees from the majority of historic intercepts . Th e Company believes that this change contributed to

demonstrating more continuous and higher -grade gold mineralization within the High Grade Panel than

recognized by previous operators.

Where appropriate, the holes are also being used to collect rock strength data, hydrogeologic data and

samples for further metallurgical studies that will directly influence the Ana Paula mine design in the

ongoing Feasibility Study.

TSX.V: HSTR

OTCQX: HSTXF

595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045

TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1

Drill Results Summary

Holes AP-25-331, AP-25-333, AP-25-334 and AP-25-336 are resource conversion holes drilled in the central

part of the High Grade Panel. Holes AP-25-334 and AP-25-336 were drilled on the same fence, with AP-25-

334 targeting the polymictic breccia and hanging wall mineralization , and AP -25-336 targeting the

polymictic breccia and footwall mineralization. Hole AP-25-334 intercepted a wide zone of 92.05 met res

(“m”) grading 4.33 grams per tonne (“g/t”) gold, whilst AP-25-336 returned intervals of 3.2 m at 15.58 g/t

gold, 65.15 m at 5.39 g/t and 43.55 m at 4.66 g/t gold with a 3.05 m interval with 24.64 g/t gold.

Figure 1: Plan Map of the current drill program at Ana Paula

Figure 2: Cross-Section through newly reported holes AP-25-334 and AP-25-336

595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045

TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1

Hole AP-25-333 is located 60 m to the east of the above- mentioned fence and returned two high -grade

intervals of 26.6 m grading 4.7 8 g/t gold and 83.2 m grading 1 7.35 g/t gold. Hole AP-25-331 is a step out

32 m to the southeast and returned a 7.95 m zone grading 7.92 g/t gold and a wide high -grade interval of

70.65 m at 9.38 g/t gold.

Holes AP-25-330, AP-25-332 and AP-25-335A are geotechnical holes for mine development planning and

returned assay results in line with expectations, including intervals of 48.5 m of 5.48 g/t gold, 5.2 m of 4.23

g/t gold and 35.55 m of 6.73 g/t gold, respectively.

True widths are unknown. Mineralization at Ana Paula occurs as disseminations or vein stockworks with

variable controls including rock porosity, lithology and fault networks.

Drilling continues throughout the High Grade Panel and its less well-defined east and west edges , with

assays pending from twelve holes. Two of the drills have begun to target deeper inferred mineralization

and the northern exploration zone, which is approximately 250 m north of the High Grade Panel that has

two drill holes pending assay.

The next Ana Paula drill results are anticipated to be released in December.

Drilling Results and Coordinates Tables

Holey From

(metres)

To

(metres)

Interval

(metres)

Au

(g/t)

Topcut

Au

(g/t)

Hole

Purpose

AP-25-330 45.4 93.9 48.5 5.48 Geotechnical Hole

including 45.4 53.6 8.2 7.41

and 82.3 85.5 3.2 20.8

AP-25-331 29.9 38.85 8.95 7.27 Resource Hole

including 36.0 38.85 2.85 15.5

and 49.65 120.3 70.65 9.38 1

including 59.65 75.0 15.35 18.3

AP-25-332 140.5 145.75 5.25 4.23 Geotechnical Hole

AP-25-333 38.8 65.4 26.6 4.78 4.58 Resource Hole2

including 38.8 44.45 5.65 11.3 10.4 2

and including 59.7 65.4 5.7 9.45

and 76.0 159.2 83.2 17.3 15.8 1,2

including 88.95 135.6 46.65 27.3 24.5 3

and including 146.1 155.3 9.2 9.60

AP-25-334 97.1 189.15 92.05 4.33 Resource Hole

including 98.2 105.85 7.65 8.17

and including 140.15 147.15 7.0 8.49

and including 166.1 180.0 13.9 9.70

AP-25-335A 12.75 21.2 8.45 4.76 Geotechnical Hole

and 45.0 80.55 35.55 6.73

including 45.0 51.7 6.7 11.0

and including 62.2 80.55 18.35 7.94

595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045

TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1

and 102.6 108.2 5.6 4.67

and 140.55 145.8 5.25 5.01

AP-25-336 25.15 28.35 3.2 15.6 Resource Hole

and 128.35 141.7 13.35 2.50

including 128.35 132.0 3.65 6.85

and 152.2 217.35 65.15 5.39 4.98 4

including 152.2 162.4 10.2 13.6

including 173.8 176.85 3.05 24.6 15.8 4

Table 1: Significant Drill Intersections

1 Result reported in November 20th Q3, 2025 quarterly news release

2 Top cut to 47 ppm Au based on resource model domains

3 Top cut to 64 ppm Au based on resource model domains

4 Top cut to 38 ppm Au based on resource model domains

Drilling Coordinates Table

Hole ID Easting

(WGS84 Zone 14N)

Northing

(WGS84 Zone 14N)

Elevation

(metres)

Azimuth

(°)

Inclination

(°)

Length

(metres)

AP-25-330 410,274 1,997,960 962.6 0 -53 126.0

AP-25-331 410,205 1,998,038 917.7 180 -50 192.0

AP-25-332 410,030 1,998,137 972.8 180 -55 329.4

AP-25-333 410,191 1,998,065 907.1 180 -55 204.0

AP-25-334 410,126 1,998,071 931.8 178 -55 302.0

AP-25-335A 410,254 1,998,038 913.4 180 -46 237.0

AP-25-336 410,128 1,998,121 933.8 180 -55 353.0

Table 2: Drill Hole Details

Ana Paula Preliminary Economic Assessment Note

Heliostar announced the results of a Preliminary Economic Assessment on November 6, 2025. References

to the results in this release are provided in greater detail here.

Quality Assurance / Quality Control

Drill core is P Q size, and the core is cut in half, with half sent for analysis. Core samples were shipped to

ALS Limited in Zacatecas, Zacatecas, Mexico, for sample preparation and for analysis at the ALS laboratory

in North Vancouver. The Zacatecas and North Vancouver ALS facilities are ISO/IEC 17025 certified. Gold

was assayed by 30 -gram fire assay with atomic absorption spectroscopy finish , and overlimits were

analyzed by 30-gram fire assay with gravimetric finish.

Control samples comprising certified reference and blank samples were systematically inserted into the

sample stream and analyzed as part of the Company’s quality assurance / quality control protocol.

Statement of Qualified Person

Stewart Harris, P.Geo ., a Qualified Person, as such term is defined by National Instrument 43 -101 –

Standards of Disclosure for Mineral Projects, has reviewed the scientific and technical information that

595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045

TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1

forms the basis for this news release and has approved the disclosure herein. Mr. Harris is employed as

Exploration Manager of the Company.

About Heliostar Metals Ltd.

Heliostar is a gold mining company with production from operating mines in Mexico. This includes the La

Colorada Mine in Sonora and the San Agustin Mine in Durango. The Company also has a strong portfolio of

development projects in Mexico and the USA. These include the Ana Paula project in Guerrero, the Cerro

del Gallo project in Guanajuato, the San Antonio project in Baja Sur and the Unga project in Alaska, USA.

FOR ADDITIONAL INFORMATION PLEASE CONTACT:

Charles Funk

President and Chief Executive Officer

Heliostar Metals Limited

Email: [email protected]

Phone: +1 844-753-0045

Rob Grey

Investor Relations Manager

Heliostar Metals Limited

Email: [email protected]

Phone: +1 844-753-0045

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain "Forward–Looking Statements" within the meaning of the United States

Private Securities Litigation Reform Act of 1995 and "forward– looking information" under applicable

Canadian securities laws. When used in this news rel ease, the words "anticipate", "believe", "estimate",

"expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and similar words or expressions,

identify forward –looking statements or information. These forward– looking statements or infor mation

relate to, among other things, show the full extent of the deposit, upgrade and expand the resource base,

growing our annual production profile in the near term and bringing additional production online.

Forward-looking statements and forward–looking information relating to the terms and completion of the

Facility, any future mineral production, liquidity, and future exploration plans are based on management’s

reasonable assumptions, estimates, expectations, analyses and opinions, which are based on

management’s experience and perception of trends, current conditions and expected developments, and

other factors that management believes are relevant and reasonable in the circumstances, but which may

prove to be incorrect. Assumptions have been made regarding, among other things, the receipt of necessary

approvals, price of metals; no escalation in the severity of public health crises or ongoing military conflicts;

costs of exploration and development; the estimated costs of development of exploration projects; and the

Company’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable

terms.

These statements reflect the Company’s respective current views with respect to future events and are

necessarily based upon a number of other assumptions and estimates that, while considered reasonable by

management, are inherently subject to significant business, economic, competitive, political, and social

uncertainties and contingencies. Many factors, both known and unknown, could cause actual results,

performance, or achievements to be materially different from the results, performance or achievements that

are or may be expressed or implied by such forward–looking statements or forward-looking information and

the Company has made assumptions and estimates based on or related to many of these factors. Such

595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045

TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1

factors include, without limitation: precious metals price volatility; risks associated with the conduct of the

Company’s mining activities in foreign jurisdictions; regulatory, consent or permitting delays; risks relating

to reliance on the Company’s management team and outside contractors; risks regarding exploration and

mining activities; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable

basis or at all; currency fluctuations; risks regarding the failure to gene rate sufficient cash flow from

operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining

projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and

operating costs of such projects; contests over title to properties, particularly title to undeveloped

properties; laws and regulations governing the environment, health and safety; the ability of the

communities in which the Company operates to manage and cope with the implications of public health

crises; the economic and financial implications of public health crises, ongoing military conflicts and general

economic factors to the Company; operating or technical difficulties in connection with mining or

development activities; employee relations, labour unrest or unavailability; the Company’s interactions with

surrounding communities; the Company’s ability to successfully integrate acquired assets; the speculative

nature of exploration and development, including the risks of diminishing quantities or grades of reserves;

stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for

shareholders of the Company; litigation risk; and the factors identified under the caption “R isk Factors” in

the Company’s public disclosure documents. Readers are cautioned against attributing undue certainty to

forward–looking statements or forward -looking information. Although the Company has attempted to

identify important factors that could cause actual results to differ materially, there may be other factors

that cause results not to be anticipated, estimated or intended. The Company does not intend, and does not

assume any obligation, to update these forward– looking statements or forward -looking information to

reflect changes in assumptions or changes in circumstances or any other events affecting such statements

or information, other than as required by applicable law.