Heliostar Drills 56.6 Metres Grading 2.88 g/t Oxide Gold from 68 metres at the La Colorada Mine, Sonora, Mexico
595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045
TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1
Heliostar Drills 56.6 Metres Grading 2.88 g/t Oxide Gold
from 68 metres at the La Colorada Mine, Sonora, Mexico
HIGHLIGHTS:
• 56.6m grading 2.88 g/t gold from 68m
• 23.2m grading 14.4 g/t gold from surface (including 0.85m grading 381 g/t gold)
• 4.05m grading 17.8 g/t gold from 136m
• 8.7m grading 6.68 g/t gold from 56m
• 18.85m grading 3.54 g/t gold from 95m
• Deeper drilling at the Creston Pit shows a combination of wide intervals and high grades
• Results will be incorporated in an updated technical study for La Colorada expected to be
released mid-2025
• The focus of drilling at La Colorada will shift to stockpiles and then high-grade veins
beneath and along strike from the open pits
Vancouver, Canada – May 15, 202 5 – Heliostar Metals Ltd. (TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1)
(“Heliostar” or the “Company”) is pleased to announce additional results from an expanded 16,211 metre
drilling program at the La Colorada Mine in Sonora, Mexico. La Colorada restarted production in early
January 2025, and the current drill program is intended to expand the mineral reserves ahead of an updated
technical report and expansion decision planned for mid-2025.
Heliostar CEO, Charles Funk, commented , “The turnaround at La Colorada has been a real strength for
Heliostar. In the three months since the acquisition, the Company has restarted production and established
a mine life of 6.5 years. This drill program has returned a powerful combination of wide gold intervals and
high-grade veins, leading to our expanding the program to a total of 104 drill holes. The intervals reported
to date are intended to drive stronger economics in an updated technical report planned for mid- 2025. A
new drilling program at La Colorada will now focus on defining additional mineralized material from historic
stockpiles, which we believe can quickly be brought into production. We will then pivot to exploration for
underground targets in the second half of the year.”
Drill Results Summary
Mineralization at La Colorada’s Creston Pit is predominantly hosted in three veins: the North, Intermediate
and South Veins (Figure 1). These veins trend northeast- southwest to east-west, dip northward and are
surrounded by halos of smaller mineralized vein s. The Creston Pit has historically mined oxide gold and
silver from all three of these veins. A current Probable Mineral Reserve of 312,000 ounces of gold grading
0.76 grams per tonne (g/t) gold and 5,074,000 ounces of silver at 10.1 g/t silver is defined at the Creston
Pit1.
A technical review of expansion potential identified two opportunities for reserve growth, these being near
surface extensions of known veins with little or no drill data and exploring the under -sampled
mineralization beneath the pit. Both opportunities were defined using historical drilling, blasthole data,
mining shapes, and the geological model.
TSX.V: HSTR
OTCQX: HSTXF
595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045
TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1
Figure 1: Plan view of the Creston Pit showing historic drilling, blast hole samples and Heliostar drillholes.
Selected intercepts are labelled.
Figure 2: Cross-section view looking west at the eastern end of the Creston Pit. The section shows historic
drilling and new Heliostar drillhole results below the planned pit boundary.
Blast hole data clearly shows the potential for the continuation of veins at shallow depths that were
previously modelled as waste. They contain elevated gold grades that continue to the edge of the pit walls
where they remain open for expansion (Figures 1 and 2). At depth, drill spacing is wider than the area above.
Additional drilling allows for improved estimation of grade and continuity.
595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045
TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1
The Company has completed 104 holes totalling 16,211 metres in the program to date. This is an expansion
on the planned 12,500 metre program. This release reports r esults for 25 new holes at Creston, two at
Gran Central and four metallurgical holes completed at Veta Madre. The majority of the new drill holes
targeted extensions of the North, Intermediate and South Veins in areas where drilling is widely spaced yet,
within the current Creston resource. They aim to add ounces to the overall Creston resources and reserves.
Assay results show narrow to wide, low - to high-grade oxide gold intercepts. Targeted vein zones
consistently return intercepts above the 0.16 g/t gold-equivalent cutoff grade of reserves within the Creston
pit. The results may increase the tonnes and grade of mineralization in an updated pit shell. If so, that would
add to total reserves in an updated technical report.
Next Steps
Results from the current drill program are being incorporated into a resource model. They will support a
reserve update to be published with a technical report in mid-2025, which will include an updated mine
plan on any additional economic material defined to date.
This drill program is designed to increase the volume of rock containing potentially economic gold
mineralization, which, in turn, could improve the overall mine economics. Any zones currently modelled as
waste but subsequently modelled as ore from this program would have the double benefit of reducing the
overall strip ratio of the Creston pit expansion and adding ounces to the mine plan.
That, in-turn, could reduce the up-front capital requirements for the restart of operations and improve the
IRR and NPV of the updated t echnical report compared to the technical report released in January 2025.
This upcoming study will be the basis of an investment decision for the expansion of open pit mining
production at La Colorada.
Following the successful completion of this drill program, the Company will now change the focus of drilling
to test historic stockpiles. If drilling is successful, it may provide additional resources and cash flow similar
to that currently being generated from the producing Junkyard reserve. The intention is to produce from
these low-cost stockpiles to maximize cash flow ahead of primary mining from the open pit pushbacks.
In the second half of 2025 , the focus will shift to stepping out on the high -grade vein intercepts beneath
and along strike from the open pits. The results received to date provide optimism for the potential of an
underground future at La Colorada (see our April 9, 2025, press release here). In addition, the Company will
advance property scale exploration targets with mapping and geophysics to define drill targets beyond the
currently mined areas.
Quarterly Review and Future Plans Update
The Company presented a live webinar on Tuesday, May 13th, to provide an in-depth review of Heliostar’s
recently reported preliminary interim results for Q1 2025.
The Company also provided a forward-looking overview of what to expect in Q2 and beyond. This included
how Heliostar plans to leverage operational cash flow to boost annual gold production from its two
operating mines and advance the development of the Ana Paula project.
A replay of the webinar can be found on this link.
595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045
TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1
La Colorada Mineral Reserves Statement
Classification Zone
AuEq
Cut-off
(g/t)
Tonnes
(kt)
Gold Grade
(g/t Au)
Silver
Grade
(g/t Ag)
Contained
Gold
(koz)
Contained
Silver
(koz)
Probable
El Crestón 0.160 12,841 0.76 10.1 312 4,181
Veta Madre 0.175 1,905 0.70 3.1 43 189
La Chatarrera 0.164 3,413 0.20 6.4 22 704
Total 18,159 0.65 8.69 377 5,074
1 La Colorada Operations, Sonora, Mexico, NI 43-101 technical report (the “Report”) is dated January 11, 2024, has an effective date of December 4, 2024
Diamond Drilling Results Table
HoleID From
(metres)
To
(metres)
Interval
(metres)
Au
(g/t)
Ag
(g/t)
%
True
Width
Comment
24-LCDD-290 290.75 310.7 19.95 2.51 98.0 83.4 South Vein
including 301.25 306.5 5.25 5.79 115 83.4 South Vein
25-LCDD-291 1.0 13.75 12.75 0.91 14.2 100 Intermediate Vein
and 26.5 36.0 9.5 0.47 4.4 99.6 Intermediate Vein
and 40.5 46.5 6.0 0.65 3.6 99.6 Intermediate Vein
and 68.0 124.6 56.6 2.88 6.9 94.1 Intermediate Vein
68.0 124.6 56.6 2.18 6.9 94.1 Top-cut to 23 g/t Au
including 111.85 116.9 5.05 9.22 19.4 96.4 South Vein
25-LCDD-292 2.7 33.95 31.25 0.65 34.7 85.4 Intermediate Vein
and 41.75 51.0 9.25 0.23 33.6 88.7 Intermediate Vein
and 124.9 145.8 20.9 3.63 23.8 82.8 South Vein
124.9 145.8 20.9 3.03 23.8 82.8 Top-cut to 20 g/t Au
including 135.75 139.8 4.05 17.8 99.9 82.8 South Vein
135.75 139.8 4.05 14.6 99.9 82.8 Top-cut to 20 g/t Au
25-LCDD-293 48.35 55.85 7.5 1.00 5.2 77.1 Intermediate Vein
and 68.5 79.25 10.75 1.52 1.8 65.1 Intermediate Vein
and 92.0 100.7 8.7 2.41 8.4 77.8 Intermediate Vein
25-LCDD-294 0.0 15.3 15.3 0.57 28.1 100 Intermediate Vein
and 52.4 82.2 29.8 2.22 22.3 87.8 Intermediate Vein
52.4 82.2 29.8 1.62 22.3 87.8 Top-cut to 23 g/t Au
including 56.05 64.75 8.7 6.68 62.8 95.1 Intermediate Vein
including 56.05 64.75 8.7 4.63 62.8 95.1 Top-cut to 23 g/t Au
and 103.0 120.4 17.4 1.08 2.2 99.8 South Vein
25-LCDD-295 24.05 29.6 5.55 0.21 31.3 87.6 South Vein
and 35.55 38.35 2.8 0.17 28.0 85.7 South Vein
25-LCDD-296 0.0 29.3 29.3 1.08 7.2 88.9 Intermediate Vein
including 5.5 13.65 8.15 3.25 9.7 93.0 Intermediate Vein
and 59.2 84.8 25.6 0.66 4.8 80.9 Intermediate Vein
and 118.1 135.4 17.3 1.87 9.8 96.2 South Vein
595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045
TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1
including 121.8 124.8 3.0 6.73 25.4 96.2 South Vein
25-LCDD-297 29.9 46.0 16.1 0.29 17.4 85.1 Intermediate Vein
and 99.7 127.6 27.9 0.62 12.4 79.0 Intermediate Vein
25-LCDD-298 8.6 20.25 11.65 2.01 16.2 99.3 Intermediate Vein
and 77.8 119.05 41.25 1.87 4.9 98.3 South Vein
including 95.15 114.0 18.85 3.54 4.8 98.3 South Vein
25-LCDD-299 99.9 108.15 8.25 0.21 13.4 80.6 Gran Central Vein
and 114.4 118.0 3.6 0.53 19.0 80.6 Gran Central Vein
25-LCDD-300 0.0 23.2 23.2 14.4 21.8 94.5 Intermediate Vein
0.0 23.2 23.2 1.28 21.8 94.5 Top-cut to 23 g/t Au
including 9.15 10.0 0.85 381.0 167 94.5 Intermediate Vein
9.15 10.0 0.85 23.0 167 94.5 Top-cut to 23 g/t Au
and 38.0 51.65 13.65 0.93 12.7 87.6 Intermediate Vein
and 66.95 85.2 18.25 0.66 2.1 87.5 Intermediate Vein
and 104.9 116.25 11.35 1.47 1.8 91.1 South Vein
and 122.5 129.5 7.0 1.18 8.1 91.1 South Vein
25-LCDD-301 35.0 47.4 12.4 0.54 71.8 Gran Central Vein
Table 2: Significant Drill Intersections.
RC Drilling Results Table
HoleID From
(metres)
To
(metres)
Interval
(metres)
Au
(g/t)
Ag
(g/t)
% True
Width Comment
24-LCRC-757 No significant results
24-LCRC-758 No significant results
25-LCRC-759 No significant results
25-LCRC-760 No significant results
25-LCRC-761 No significant results
25-LCRC-762 50.3 61.0 10.7 2.01 2.8 98.9 North Vein
including 59.5 61.0 1.5 13.3 4.0 98.9 North Vein
25-LCRC-763 138.7 144.8 6.1 0.42 18.8 100 North Vein
and 167.6 179.8 12.2 0.24 4.5 98.9 Intermediate Vein
25-LCRC-765 No significant results
25-LCRC-766 109.7 120.4 10.7 0.77 123 94.7 Intermediate Vein
25-LCRC-767 47.2 53.3 6.1 0.34 51.7 99.0 North Vein
25-LCRC-768 47.2 57.9 10.7 0.62 82.1 95.0 North Vein
25-LCRC-769 245.4 251.5 6.1 7.94 3.2 80.5 Intermediate Vein
245.4 251.5 6.1 6.36 3.2 80.5 Top-cut to 23 g/t Au
25-LCRC-770 121.9 128.0 6.1 0.47 5.9 99.1 North Vein
and 163.1 169.2 6.1 0.75 4.1 73.7 North Vein
25-LCRC-771 No significant results
25-LCRC-772 No significant results
Table 3: Significant Drill Intersections.
595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045
TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1
Veta Madre Metallurgical Drilling Results Table
HoleID From
(metres)
To
(metres)
Interval
(metres)
Au
(g/t)
Ag
(g/t)
% True
Width Comment
24-LCMET-19 43.8 112.5 68.7 0.73 3.3 74.7
24-LCMET-20 108.6 118.65 10.05 1.00 1.3 69.1
and 138.5 223.75 85.25 1.14 4.3 69.1
138.5 223.75 85.25 1.01 4.3 69.1 Top-cut to 7 g/t Au
including 149.15 162.8 13.65 3.47 3.4 69.1
149.15 162.8 13.65 2.76 3.4 69.1 Top-cut to 7 g/t Au
24-LCMET-21 166.0 237.0 71 1.26 5.1 79.2
166.0 237.0 71 1.24 5.1 79.2
including 223.1 224.4 1.3 8.21 3.4 79.2
including 223.1 224.4 1.3 7.00 3.4 79.2
24-LCMET-22 185.0 247.45 62.45 0.64 6.7 67.2
Table 4: Significant Drill Intersections.
Drilling Coordinates Table
Hole ID
Northing
(NAD27 CONUS
Zone 12N)
Easting
(NAD27 CONUS
Zone 12N)
Elevation
(metres)
Azimuth
(°)
Inclination
(°)
Length
(metres)
25-LCDD-290 542264 3185808 360.4 180 -43 318.25
25-LCDD-291 542641 3185777 182.7 180 -12 154.95
25-LCDD-292 542415 3185710 221.1 180 -49 151.65
25-LCDD-293 542775 3185810 246.0 180 -70 157.25
25-LCDD-294 542641 3185777 182.3 180 -26 132.65
25-LCDD-295 542184 3185598 381.2 215 -40 84.1
25-LCDD-296 542641 3185777 183.2 180 +2 151.25
25-LCDD-297 542425 3185721 221.1 190 -55 138.15
25-LCDD-298 542653 3185788 182.7 170 -20 129.95
25-LCDD-299 540979 3185503 420.4 180 -60 138.05
25-LCDD-300 542653 3185788 183.3 170 -3 150.85
25-LCDD-301 540997 3185454 416.5 180 -55 72.6
24-LCMET-19 543965 3185611 346.0 184 -45 126.0
24-LCMET-20 543890 3185658 418.4 163 -51 223.75
24-LCMET-21 543880 3185639 419.6 180 -47 237.0
24-LCMET-22 543890 3185659 418.4 173 -55 247.45
24-LCRC-757 542065 3185543 458.7 180 -45 128.0
24-LCRC-758 542065 3185621 455.7 180 -45 158.5
25-LCRC-759 542748 3185451 433.6 180 -45 100.6
25-LCRC-760 542750 3185390 439.7 180 -45 152.4
595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045
TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1
25-LCRC-761 543080 3185936 444.1 180 -45 195.1
25-LCRC-762 543100 3185898 442.4 175 -50 167.6
25-LCRC-763 543025 3185964 460.6 180 -45 213.4
25-LCRC-764 542214 3185673 373.9 180 -50 121.9
25-LCRC-765 542188 3185623 380.2 215 -44 85.3
25-LCRC-766 542215 3185704 371.3 168 -44 176.8
25-LCRC-767 542218 3185725 369.6 180 -55 103.6
25-LCRC-768 542222 3185726 369.5 155 -45 100.6
25-LCRC-769 542975 3185996 472.7 178 -45 256.0
25-LCRC-770 542900 3186006 476.9 180 -49 268.2
25-LCRC-771 542465 3185371 415.1 179 -45 140.2
25-LCRC-772 542465 3185311 433.0 179 -50 152.4
Table 5: Drill Hole Details
Quality Assurance / Quality Control
Core holes were drilled with PQ, HQ, and NQ tools and drill core was sawn in half with one half submitted
for analysis and one half retained as a record. Reverse circulation (RC) holes were drilled with 5-inch and
5-1/4 inch tools. Reverse circulation samples with a mass of >20kg were split into one-quarter, which was
submitted for analysis. Reverse circulation samples with a mass of ≤20kg were split into half which was
submitted for analysis. Three-quarters or one-half of the samples, respectively were retained as a record.
Drill samples were shipped to ALS Limited in Hermosillo, Sonora, Mexico , for sample preparation and for
analysis at the ALS laboratory in North Vancouver. The Hermosillo and North Vancouver ALS facilities are
ISO/IEC 17025 certified. Gold was assayed by 30 -gram fire assay with atomic absorption spectroscopy
finish, and overlimits were analyzed by 30-gram fire assay with gravimetric finish.
Control samples comprising certified reference and blank samples were systematically inserted into the
sample stream and analyzed as part of the Company’s quality assurance / quality control protocol.
Statement of Qualified Person
Gregg Bush, P. Eng. and Stewart Harris, P.Geo. , the Company’s Qualified Persons, as such term is defined
by National Instrument 43-101 – Standards of Disclosure for Mineral Projects, have reviewed the scientific
and technical information that forms the basis for this news release and ha ve approved the disclosure
herein. Mr. Bush is employed as Chief Operating Officer of the Company, and Mr. Harris is employed as
Exploration Manager of the Company.
Technical Report Reference
1 La Colorada Operations, Sonora, Mexico, NI 43-101 Technical Report (the “Report”) is dated January
11, 2024, has an effective date of December 4, 2024 and was prepared for Heliostar Metals Inc. by Mr. Todd
Wakefield, RM SME, Mr. David Thomas, P.Geo., Mr. Jeffrey Choquette, P.E., Mr. Carl Defilippi, RM SME, and
Ms. Dawn Garcia, CPG. The Report can be found under the Company’s profile on SEDAR+
(www.sedarplus.ca) and on Heliostar’s website (www.heliostarmetals.com).
595 Burrard Street, Suite 1723, Vancouver BC, V7X 1J1, Canada - Tel +1 844 753 0045
TSX.V: HSTR, OTCQX: HSTXF, FRA: RGG1
About Heliostar Metals Ltd.
Heliostar is a gold mining company with production from operating mines in Mexico. This includes the La
Colorada Mine in Sonora and the San Agustin Mine in Durango. The Company also has a strong portfolio of
development projects in Mexico and the USA. These include the Ana Paula project in Guerrero, the Cerro
del Gallo project in Guanajuato, the San Antonio project in Baja Sur and the Unga project in Alaska, USA.
FOR ADDITIONAL INFORMATION PLEASE CONTACT:
Charles Funk
President and Chief Executive Officer
Heliostar Metals Limited
Email: [email protected]
Phone: +1 844-753-0045
Rob Grey
Investor Relations Manager
Heliostar Metals Limited
Email: [email protected]
Phone: +1 844-753-0045
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statement Regarding Forward-Looking Information
This news release includes certain "Forward–Looking Statements" within the meaning of the United States
Private Securities Litigation Reform Act of 1995 and "forward– looking information" under applicable
Canadian securities laws. When used in this news rel ease, the words "anticipate", "believe", "estimate",
"expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and similar words or expressions,
identify forward –looking statements or information. These forward– looking statements or infor mation
relate to, among other things, the open pit intervals are intended to drive stronger economics in an updated
technical report planned for mid-2025. Drilling at La Colorada will now be undertaken to define additional
stockpile material and then we will pivot to exploration for underground t argets in the second half of the
year and, leverage operational cash flow to boost annual gold production from its two operating mines and
advance the development of the Ana Paula project , the results received to date provide real optimism for
the potential of an underground future at La Colorada.
Forward-looking statements and forward–looking information relating to the terms and completion of the
Facility, any future mineral production, liquidity, and future exploration plans are based on management’s
reasonable assumptions, estimates, expectations, analyses and opinions, which are based on
management’s experience and perception of trends, current conditions and expected developments, and
other factors that management believes are relevant and reasonable in the circumstances, but which may
prove to be incorrect. Assumptions have been made regarding, among other things, the receipt of necessary
approvals, price of metals; no escalation in the severity of public health crises or ongoing military conflicts;
costs of exploration and development; the estimated costs of development of exploration projects; and the
Company’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable
terms.
These statements reflect the Company’s respective current views with respect to future events and are
necessarily based upon a number of other assumptions and estimates that, while considered reasonable by
management, are inherently subject to significant business, economic, competitive, political, and social
uncertainties and contingencies. Many factors, both known and unknown, could cause actual results,
performance, or achievements to be materially different from the results, performance or achievements that
are or may be expressed or implied by such forward–looking statements or forward-looking information and