Vancouver, Canada, November 14, 2024. Highland Copper Company Inc. (TSXV: HI; OTCQB: HDRSF)
(“Highland” or the “Company”) is pleased to provide key updates at its 100% owned Copperwood project
(“Copperwood”) and the White Pine North project (“White Pine”), its joint venture with Kinterra Copper LLC
(“Kinterra”).
Highland Copper continues to execute on its path to a near -term construction decision at Copperwood
through completion of required early site work and preparation for detailed engineering. In parallel at White
Pine, completion of a significant drill program and key environmental baselining studies represent important
progress toward engineering studies and permitting. The two projects are well sequenced, highly leveraged
to copper price, and create a strong copper production growth profile in the supportive Upper Peninsula of
Michigan, USA.
Copperwood Update
• 2024 Site Work: Highland is pleased to announce that it has substantially completed its early site
work program as required by its Wetlands and Streams P ermit. This program includes partial site
clearing, in addition to the construction of mitigating wetland areas and site stream diversion
structures. The Company will complete the on-site work with landscaping and tree planting in 2025,
in addition to an off- site stream mitigation project. The work has allowed Highland to establish an
operating presence, demonstrate strong environmental stewardship and strengthen relationships
with local authorities and stakeholders.
• Safety & Environmental : The site work was completed with no environmental incidents and one
reportable safety incident through 2023 and 2024 . In addition to constructing approximately 18
acres of on- site wetland, Highland is also establishing a 717 -acre wetland preservation area. In
combination, Highland is creating and preserving wetland areas approximately twelve times greater
than wetland areas impacted. We will provide future updates as we manage the newly created
wetland hydrology for native biodiversity to thrive. Highland believes that industry and environmental
protections can coexist and is committed to meeting Michigan’s high standards.
• Permits: The substantial completion of this site work satisfies key obligations under the Wetland
and Streams Permit, maintaining the permit in good standing. Highland is currently renewing the Part
55 Air Permit, which we expect to complete by Q1 2025.
• State Grant: In January 2024, the Michigan Economic Development Corporation proposed a $50
million grant to assist with infrastructure expenditure during construction. The Michigan Strategic
Fund and Michigan House Appropriations Committee approved the grant in March 2024 and June
2024, respectively. The grant is pending final approval by the Michigan Senate Appropriations
Committee. Highland continues to educate the committee on the merits of the project. We look
forward to a positive outcome for the Copperwood project which has been endorsed by 22 local
municipalities, counties and townships, in addition to the approvals already received for the grant.
TSX.V : HI | OTCQB : HDRSF Page 2 of 8
• Construction Team: In September 2024, Highland hired Dr. Wynand van Dyk as the Project Director
for the Copperwood project. Wynand is a senior executive with 30 years of experience in mining,
metallurgy and capital projects at De Beers, Hatch , Lonmin Platinum, and Itafos , in addition to
consulting engagements for numerous senior producers. Wynand’s scale of experience will support
Copperwood as it advances to final project design and development.
• Detailed Engineering: Highland has initiated bidding for key detailed engineering work packages
including mine engineering, process plant engineering , water management and tailings disposal
facility engineering, in addition to internal work on the site power plan. This engineering is critical to
both derisk and optimize Copperwood ’s design, as well as support due diligence during project
financing. Highland will adopt a phased approach to engineering with the initial step finalizing design
criteria for key work packages and assessing key opportunities to improve the project. Of particular
note, Highland may consider the applicability of ultrafine flotation technology to improve recoveries.
• Union Engagement: Highland signed a letter of intent with the Michigan Building and Construction
Trades Council reflecting the collective goal to sign a Project Labor Agreement. This agreement
would assure construction work on Copperwood proceeds economically, efficiently, safely, without
interruption, and with due consideration for the protection of labor standards, wages, and working
conditions in Michigan. Highland has received a formal letter of support from all unions represented
by both the Michigan B uilding and Construction Trades Council and the Upper Peninsula
Construction Council.
Highland’s CEO, Barry O'Shea, stated : “ Highland continues its methodical execution to prepare
Copperwood for a construction decision. Our early works program has set the foundation for development
while maintaining our permits in good standing. Our mitigation projects demonstrate Highland’s desire for
strong environmental stewardship and have increased our credibility with state authorities. We also
continue to build important relationships locally with union representatives, construction contractors, and
other stakeholders. Importantly, bringing on an experienced Project Director allows Copperwood to take the
important step into final project design and detailed engineering. We believe each key step brings
Copperwood closer to a responsible construction decision and accretion toward its significant asset value.”
White Pine Update
While Highland focuses on the Copperwood project, its joint venture partner, Kinterra, is applying its
technical and financial strength to the White Pine project.
• Drilling Programs: In January 2024, White Pine concluded a winter drill program of 10 holes or
approximately 6,600 metres. The primary goal of the drill program was to collect ore samples for
geotechnical and metallurgical testing to support further engineering studies. In October 2024,
White Pine completed a second drill program of 14 holes, or approximately 14,200 metres, including
28 wedges . At the conclusion of the drill program s, sufficient metallurgical and geotechnical
samples have been collected to support key engineering studies. A resource update is planned for
the first half of 2025 which will include infill holes from the second drill program.
• Test work and Engineering Trade-offs: Geotechnical test work is continuing on samples collected
to date. Engineering trade-off studies are also underway to evaluate mining methods, mine access
options, and material handling systems. Metallurgical test work has been initiated with the main
TSX.V : HI | OTCQB : HDRSF Page 3 of 8
objective of developing a flowsheet to maximize metal recovery. It primarily consists of grinding and
flotation test work on multiple variability samples.
• Environmental Baselining: Environmental baseline studies have been completed for surface water
flow and water quality monitoring , groundwater elevation and water quality monitoring , aquatic
habitat, threatened and endangered species, wetlands and streams, wildlife habitat, and
archaeological and cultural surveys. Environmental baselining will continue through 2025. This
baselining is a key initial step to support permit applications.
• Kinterra Loan: Highland is funding its share of joint venture expenditures on White Pine by drawing
down on the loan facility provided by Kinterra. As of the last fiscal reporting date, June 30, 2024,
Highland has a loan outstanding of $2.4 million. Expenditure has accelerated during the quarter -
ended September 30, 2024.
Highland’s CEO, Barry O'Shea, stated: “When we divested a portion of White Pine in 2023, the goal was to
find a motivated partner that would advance the asset at a fast rate. Kinterra has executed as we would have
hoped. They are taking a methodical approach to permitting and engineering studies , starting with
comprehensive drilling and environmental baselining. We are excited as they progress to resource update
and completion of key technical program . White Pine remains nicely sequenced with Copperwood as we
seek to build a domestic copper producer in the US.”
Highland Copper will host a webinar on Tuesday, November 19th at 1pm EST to discuss our progress.
Link to the webinar - https://6ix.com/event/highland-copper-copperwood-and-white-pine-project-updates
TSX.V : HI | OTCQB : HDRSF Page 4 of 8
Photos from Wetland Creation and Stream Diversion Sites
The photos below demonstrate Highland’s environmental commitment to mitigating site impacts and
maintaining the natural beauty of the region . All work is subject to ongoing inspection from Michigan EGLE
(Department of Environment, Great Lakes and Energy).
Figure 1: Stream diversion with in-stream structures
TSX.V : HI | OTCQB : HDRSF Page 5 of 8
Figure 2: Stream diversion maturing with natural growth
Figure 3: Newly created wetland designed for native biodiversity to thrive.
TSX.V : HI | OTCQB : HDRSF Page 6 of 8
Figure 4: Wetland creation with anti-erosion structures
TSX.V : HI | OTCQB : HDRSF Page 7 of 8
Qualified Person Statement
The technical information in this news release has been reviewed and approved b y Dr. Wynand van Dyk, a
qualified person as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects.
About Highland Copper Company
Highland Copper Company Inc. is a Canadian company focused on exploring and developing copper
projects in the Upper Peninsula of Michigan, U.S.A. The Company owns the Copperwood deposit through
long-term mineral leases and 34% of the White Pine North proje ct through a joint venture with Kinterra
Copper USA LLC. The Company also owns surface rights securing access to the Copperwood deposit and
providing space for infrastructure at Copperwood as required. The Company has 736,363,619 common
shares issued and outstanding. Its common shares are listed on the TSX Venture Exchange under the symbol
"HI" and trade on the OTCQB Venture Market under symbol "HDRSF".
More information about the Company is available on the Company’s website at www.highlandcopper.com
and on SEDAR+ at www.sedarplus.com.
Cautionary Note Regarding Forward-Looking Information
This news release contains “forward -looking statements” and “forward -looking information” (collectively
“forward-looking statements”) within the meaning of applicable Canadian securities legislation. These
statements include, without limitation, statements with respect to: (a) anticipated completion of 2025 early
site work program at Copperwood and anticipated benefits thereof , including the resulting maintenance of
the Wetland and Streams Permit (b) the expected renewal to the Part 55 Air Permit (c) the potential approval
of the Michigan Strategic Fund grant (d) the potential to advance engineering studies and project
optimization at Copperwood, and the anticipated benefits thereof (e) future metallurgical, geotechnical and
hydrogeological testing, baseline studies and drilling at White Pine; and (f) the potential for further resource
definition and completion of a feasibility study at White Pine. The forward-looking statements are subject to
a number of assumptions, including those set out in the technical reports entitled “Feasibility Study Update
Copperwood Project Michigan, USA” and the Company’s annual information form for the year ended June
30, 2024 (the “AIF”). These underlying assumptions may prove to be incorrect. Important factors that could
materially impact the Company's expectations include: changes in project parameters as plans continue to
be refined; availability of services, materials and skilled lab our to complete work programs, testing and
drilling; effects of regulation by governmental agencies; the fact that permit extensions, re newals and
amendments are subject to regulatory approvals, which may be conditioned, delayed or denied; there is no
assurance that the Michigan State legislature will approve the Michigan State Strategic Funds grant, and any
such approval may be subject to conditions; advancement to a construction decision at Copperwood is
subject to additional studies, for which the Company will require additional funds, which may not be
available on a timely basis and accordingly could delay a construction decision; the C ompany will be
required to repay the loan facility from Kinterra in July, 2026, or will have its interest at White Pine diluted;
unexpected cost increases, which could include significant increases in estimated capital and operating
costs and the effects of inflation; fluctuations in metal prices and currency exchange rates; general market
and industry conditions, the results of baseline studies and test work may result in unforeseen issues which
could delay or hamper advancement of the projects, the result s of ongoing drill programs may not result in
TSX.V : HI | OTCQB : HDRSF Page 8 of 8
identification or confirmation of resources, the results of work programs at White Pine may not warrant
progressing to a feasibility study, and the other risks set out in the Company’s public disclosure documents,
including the AIF, filed on SEDARPlus. Although the Company believes that the assumptions and factors
used in preparing the forward- looking statements in this news release are reasonable, undue reliance
should not be placed on forward looking statements. All forward- looking statements in this p ress release
are based on information available to the Company as of the date hereof, and the Company undertakes no
obligation to update forward-looking statements except as required by law.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
For further information or media requests, please contact:
Barry O’Shea, CEO
Email: [email protected]
Website: www.highlandcopper.com