Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

HHE.CN ·

Q Battery Metals Corporation LA Corne South Lithium Project, Quebec

Corporate Updates

Q BATTERY METALS CORPORATION

500- 666 Burrard Street

Vancouver, BC, V6C 3P6

www.blacktuskresources.com

Q BATTERY METALS CORPORATION

LA CORNE SOUTH LITHIUM PROJECT, QUEBEC

March 8, 2023, Vancouver, BC – Q Battery Metals Corp. (“Q Battery Metals” or the “Company) is pleased

to provide a n update on the exploration targeting on their mineral claims located north of Val d’Or,

Quebec. In particular, the potential for lithium mineralization has recently become a new focus for the

claims.

Preliminary review of the rock sampling results from the 2021 Q Battery Metals work program indicates

elevated lithium in the area of the Boily-Berubé mineral showing. Table 1 summarizes rock samples that

returned elevated lithium. The samples were obtained to test for VMS potential and were not targeted

on rocks that might better return lithium results.

The Boily-Berubé mineral showing is documented as being associated with granitic pegmatites. Stripping

carried out in 1989 exposed a pegmatitic vein containing molybdenite with some grains of pyrite and

traces of chalcopyrite and malachite (GM49151). Several coarse quartz veins were exposed in the area of

the showing, with some returning elevated molybdenum and bismuth values (GM16255).

The Lac Fiedmont South mi neral showing, on the eastern margin of the Q Battery Metals claims, has

similar geology to the Boily-Berubé, including molybdenite hosted in pegmatite.

Table 1 – Summary of 2021 Rock Sampling, elevated lithium

SampleID Lithology

Code

Lithology

Summary

UTM_E UTM_N SampType Li

B0116756 I4 (AM) GG

Ultramafic,

coarse

grained

298678 5353828 Grab 468

B0116786 V3B Basalt 298676 5353877 Grab 374

B0116758 I3A GM Gabbro 298679 5353848 Grab 203

B0116769 I3A PO AM Gabbro with

pyrrhotite 298893 5353864 Grab 153

B0116771 V3B Basalt 298743 5353654 Grab 103

B0116763 V3B Basalt 298682 5353906 Grab 94

Initial review of historic drilling on the La Corne South indicates that pegmatitic rocks were intersected in

drilling undertaken by Noranda Inc. in 2004, while they were exploring base metal targets. Not all of the

core was sampled for lithium, but one hole (FIE -15-04-01, report GM62134) where sampling for lithium

was undertaken, returned up to 333 ppm lithium (186.1-187.6 metres depth). This drill hole was collared

one kilometre northwest of the Boily-Berubé showing. A summary of lithium results from this 2004 drill

hole is provided on table 2. Th e drill hole was oriente d at a -45 degree angle toward azimuth 054,

intersecting komatiite with interstitial coarse grained granite. The drill hole also returned elevated copper

and molybdenum values.

Table 2 – Summary of lithium results from drill hole FIE-15-04-01 (Noranda, 2004)

Hole id From (m) To (m) Sample id Length Li (ppm)

(PPm)

FIE 15-04-01 171.9 173.4 502575 1.5 106

FIE 15-04-01 174 175.5 502577 1.5 120

FIE 15-04-01 186.1 187.6 502580 1.5 333

The reader is cautioned that historic trenching and drilling results reported by various operators have

not been verified by Q Battery Metals.

Q Battery Metal’s La Corne South Project contact the La Corne Batholith within the northern section of

the claim block. The La Corne Batholith and the volcanic rocks on the margin of the batholith host several

well-documented lithium deposits. Of particular significance , approximately 10 kilometres to the north,

Sayona Mining Ltd is in the process of restarting the North American Lithium (NAL) mine. The NAL mine

has a reported proven ore reserve of 1.2 million tonnes of 0.92% Li 2O and probable reserve of 28 million

tonnes of 0.96% Li2O (https://www.mining.com/sayona-raises-136m-for-quebec-lithium-projects-restart-

in-2023/). The reader is cautioned that potential lithium resources that exist on properties outside of

the Q Battery Metals claims are not direct indicators of lithium mineralization on the claims.

The La Corne lithium mineralization is hosted in a series of pegmatitic bodies that cut the hornblende

granodiorite of the La Corne Batholite and the mafic volcanic group rocks. The NAL mineralization consists

of spodumene, beryl, tantalite, molybdenite, bismithinite and lepidolite contained in granitic pegmatites

(Sigeom).

Q Battery Metals is currently planning 2023 exploration programs on their lithium projects as well as

continuing to test the best VMS targets outlined on the Mogold and PG Highway claims. The company is

pleased with the indications of lithium mineralization documented in the historic work, with exploration

designed to test the best targets. Lithium exploration will also be undertaken on the newly acquired

Pegalith Project located north of Gatineau (see News Release dated February 6, 2023).

Q Battery Metals exploration programs undertaken in Quebec are supervised by Dr. Mathieu Piché, OGQ,

with office located north of Val d’Or. He is also a Q Battery Metals company director. The company has

100% interest in mineral claims within Quebec and British Columbia, with exploration targeting strategic

metals and precious metals.

Perry Grunenberg, P.Geo, a “Qualified Person” as that term defined under NI 43 -101, has reviewed and

approved the technical information in this news release.

Figure 1 – La Corne Batholith Lithium Projects and Q Battery Metals - Mogold and PG Highway Claims

Mogold Claims

Mogold Claims

Cautionary Statement

This press release contains forward -looking statements based on assumptions as of that date. These

statements reflect management’s current estimates, beliefs, intentions and expectations; they are not

guarantees of future performance. The Company cautions that all forward -looking statements are

inherently uncertain and that actual performance may be affected by a number of material factors, many

of which are beyond the Company’s control. Such factors include, among other things: risks and

uncertainties relating to exploration and development; the ability of the Company to obtain additional

financing; the Company’s limited operating history; the need to comply with environmental and

governmental regulations; fluctuations in the prices of commodities; operating hazards and risks;

competition and other risks and uncertainti es, including those described in the Company’s Prospectus

dated September 8, 2017 available on www.sedar.com. Accordingly, actual and future events, conditions,

and results may differ materially from the estimates, beliefs, intentions, and expectations ex pressed or

implied in the forward-looking information. Except as required under applicable securities legislation, the

Company undertakes no obligation to publicly update or revise forward-looking information.

On behalf of the Board of Directors

Richard Penn

CEO

(778) 384-8923