Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

HHE.CN ·

Black Tusk Resources Inc. Begins Work ON the Mckenzie East GOLD Project, Val-D’Or, Quebec

Corporate Updates

BLACK TUSK RESOURCES INC.

500- 666 Burrard Street

Vancouver, BC, V6C 3P6

www.blacktuskresources.com

BLACK TUSK RESOURCES INC. BEGINS WORK

On The

McKENZIE EAST GOLD PROJECT, VAL-D’OR, QUEBEC

May 13, 2020, Vancouver, B.C. – Black Tusk Resource s Inc. (“Black Tusk” or the “Company) (CSE: TUSK,

OTC: BTKRF, Frankfurt: 0NB) is pleased to announce that the Company has begun work on the McKenzie

East Gold Project located 30 kilometres north of Val d’Or, Quebec.

The company has contracted VD Geo Service, based in Val d’Or, to conduct geological and geochemical

surveying over the property. Geologist, Dr. Mathieu Piché, a Black Tusk Director, will be leading the

exploration team. Work will include mapping and sampling of outcrops, and reconnaissance soil and rock

sampling. This work will provide an initial orientation over the property that can be used for the upcoming

diamond drill program at McKenzie East. Targets for this work were generated from results of the drone-

supported detailed magnetic survey completed by Black Tusk earlier this year, combined with the results

of historic exploration programs.

Black Tusk recently acquired a permit that allows f or the construction of 18 drill pads with supportin g

water supply stations and access trails. Black Tusk plans to conduct this upcoming drill program in th e

Summer 2020 exploration season.

“We look forward to obtaining the results from this exploration program to assist in defining potentia l

high-priority drill targets at the McKenzie East Gold Project,’’ stated CEO, Richard Penn.

Black Tusk Resources' McKenzie East Gold Project is located approximately two kilometres east of

Monarch Gold's McKenzie Break Project. At the McKenzie break, gold mineralization is reported as visually

distinctive white quartz-carbonate ribbon veins and sheeted veinlet complexes in places containing free

gold. Shear zones hosting the veins range from two metres to 10 metres in thickness. A Monarch Gold

news release dated Feb. 26, 2020, states that drill hole MK-18-205 returned 20.12 grams per tonne gold

over 2.6 metres, with the hole being extended in 20 19. Hole extension MK-18-205ext continued to

intersect mineralization at depth, returning 32.3 g/t Au over 7.1 metres, including 142.8 g/t Au over 1.2

metres, 26.97 g/t Au over 1.3 metres and 24.6 g/t A u over 0.7 metre. This high-grade intersection is

considered one of the best on the property to date. The reader is cautioned that results obtained from

McKenzie break gold project are not necessarily indicative of potential on the Black Tusk-McKenzie East

gold project.

Perry Grunenberg, P.Geo, a "Qualified Person" as that term is defined under NI 43-101, has reviewed and

approved the technical information contained in this news release. Mr. Grunenberg is also a director o f

the Company.

About Black Tusk Resources Inc.

Black Tusk Resources is a gold-focused Canadian exploration company with operations primarily based in

the world-class Abitibi greenstone belt region of Quebec. Black Tusk currently holds 100% ownership in 5

separate gold and palladium projects in Canada. For information on these gold and palladium projects,

please visit our website www.blacktuskresources.com

On behalf of the Board of Directors

Richard Penn

CEO

(778) 384-8923

Forward-looking Information Cautionary Statement

Except for statements of historic fact, this news r elease contains certain “forward-looking informatio n”

within the meaning of applicable securities law. Fo rward-looking information is frequently characterized

by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate” and other similar

words, or statements that certain events or conditions “may” or “will” occur. Forward-looking statements

are based on the opinions and estimates at the date the statements are made, and are subject to a variety

of risks and uncertainties and other factors that c ould cause actual events or results to differ mater ially

from those anticipated in the forward-looking state ments including, but not limited to delays or

uncertainties with regulatory approvals, including that of the CSE. There are uncertainties inherent i n

forward-looking information, including factors beyo nd the Company’s control. There are no assurances

that the business plans for the Company as described in this news release will come into effect on the terms

or time frame described herein. The Company underta kes no obligation to update forward-looking

information if circumstances or management’s estimates or opinions should change except as required by

law. The reader is cautioned not to place undue rel iance on forward-looking statements. Additional

information identifying risks and uncertainties tha t could affect financial results is contained in th e

Company’s filings with Canadian securities regulators, which are available at www.sedar.com .

The CSE and Information Service Provider have not reviewed and does not accept responsibility for the

accuracy or adequacy of this release.