Black Tusk Explores Targets FOR Diamond Drilling ON the Mckenzie East GOLD Project, Val-D’Or, Quebec
BLACK TUSK RESOURCES INC.
500- 666 Burrard Street
Vancouver, BC, V6C 3P6
www.blacktuskresources.com
BLACK TUSK EXPLORES TARGETS FOR DIAMOND DRILLING
ON THE
McKENZIE EAST GOLD PROJECT, VAL-D’OR, QUEBEC
August 24, 2020, Vancouver, BC– Black Tusk Resources Inc. (“Black Tusk” or the “Company) (C: TUSK, OTC:
BTKRF, Frankfurt: 0NB) is pleased to announce that the company’s exploration team are refining the
location of primary drill targets on their 100-per- cent-owned McKenzie East Gold Project, located near
Val d’Or, Quebec. The targets will be tested by diamond drilling slated to begin in early to mid-September.
The Phase 1 drilling program will consist of a minimum 1,000-metres of diamond drilling, with the initial
5 drill holes targeting depths between 200 to 300 m etres downhole. Phase 1 is designed to test the
mineralization potential of several anomalous features that occur within the northwestern section of the
1,676-hectare property.
The drilling program will test a corridor of intere st that includes elevated gold associated with copp er
returned from the MMI soil sample results (see news release dated July 20, 2020), combined with
magnetic anomalies outlined by the detailed drone survey. The team is also awaiting results from the 3D
IP survey recently completed on the property prior to setting the final locations for initial drilling.
The geologic team has recently added 4 historic diamond drill holes to the McKenzie East database. These
holes were completed by Exploration Auriginor Inc. and are documented in assessment report GM52916.
The 4 holes were completed within the Black Tusk ta rget corridor and returned significant gold results,
now recorded as the C2-B gold showing on the Sigeom website. Intercepts include 2.8 grams per tonne
(gpt) gold over 0.3 metre (m) (232.5-232.8 m downho le) and 0.9 gpt gold over 0.3 m (373.7-374 m
downhole) from CO94-10, and 1.0 gpt gold over 0.3 m (84.4-84.7 m downhole), from hole C-94-13. True
widths of mineralized intercepts are unknown.
1994 Diamond Drilling Collar Summary
ddh number ddhAZ ddhDIP utmE utmN Total length (m) Significant Au intercept*
CO -94 -10 25 65 311913 5357640 486.46 2.8 gpt (232.5-232.8)
0.9 gpt (373.7-374)
CO -94 -11 205 65 311874 5357581 502.31 0.7 gpt (80.8-81.4)
0.7 gpt (476.4-477)
CO -94 -12 25 65 312314 5357600 477.36 0.7 gpt (100.9-101.5)
0.8 gpt (285.6-286.2)
CO -94 -13 205 65 311892 5357471 221.28 1.0 gpt (84.4-84.7)
* True width of intercept unknown at this time
The presence of gold in core from the historic drilling is very encouraging and assists in determining areas
for continued exploration on the project. The Black Tusk geological team will continue to review all
available data, and will add the 3D IP survey results as soon as they are available, in order to determine
exact locations for initial phase 1 diamond drilling.
Perry Grunenberg, P.Geo, a “Qualified Person” as that term is defined under NI 43-101, has reviewed and
approved the technical information contained in this news release. Mr. Grunenberg is also a Director of
the Company.
Cautionary Statement
This press release contains forward-looking stateme nts based on assumptions as of that date. These
statements reflect management’s current estimates, beliefs, intentions and expectations; they are not
guarantees of future performance. The Company cauti ons that all forward-looking statements are
inherently uncertain and that actual performance may be affected by a number of material factors, many
of which are beyond the Company’s control. Such fac tors include, among other things: risks and
uncertainties relating to exploration and developme nt; the ability of the Company to obtain additional
financing; the Company’s limited operating history; the need to comply with environmental and
governmental regulations; fluctuations in the price s of commodities; operating hazards and risks;
competition and other risks and uncertainties, incl uding those described in the Company’s Prospectus
dated September 8, 2017 available on www.sedar.com. Accordingly, actual and future events, conditions,
and results may differ materially from the estimate s, beliefs, intentions, and expectations expressed or
implied in the forward-looking information. Except as required under applicable securities legislation, the
Company undertakes no obligation to publicly update or revise forward-looking information.
On behalf of the Board of Directors
Richard Penn
CEO
(778) 384-8923