Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

HCH.V ·

Hot Chili Quarterly Report Period Ending

Drill Results Financials

Hot Chili Quarterly Report Period Ending June 30,

2025

PERTH, Australia

,

July 29, 2025

/CNW/ -

Highlights

Latest Drill Results Double La Verde Porphyry Discovery Footprint

Completion of phase-one Reverse Circulation ("RC") drilling programme confirms significant copper-gold (Cu-

Au) discovery, with mineralisation extending over 1 km in length and up to

750 m

in width from near surface.

Discovery remains open laterally and at depth, with over half of Hot Chili's drill holes ending in mineralisation.

Significant intercepts from latest drill results included:

389 m

grading 0.4% Cu and 0.1 g/t Au from

4 m

depth to end-of-hole (DKP030)

including

46 m

at 0.6% Cu and 0.2 g/t Au from

238 m

including

34 m

at 0.6% Cu and 0.2g/t Au from

322 m

286 m

grading 0.3% Cu and 0.1 g/t Au from

4 m

depth (DKP027)

including

154 m

at 0.4% Cu, 0.1g/t Au from

44 m

District-Scale Porphyry Cluster Potential Emerging at La Verde

Geophysical and surface geochemical Programmes identify a cluster of three large targets adjacent to the

La Verde porphyry discovery.

Phase-two expansion drilling of La Verde and first drilling across adjacent porphyry targets awaiting access

approval.

Projects Registered for Priority Status by Chilean Ministry of Economy

Costa Fuego Copper-Gold Project and Huasco Water Project fulfilled key requirements to be considered in

the Chilean government's list of strategic investment projects for the country to expedite through streamlined

administrative approval processing.

Hot Chili Adds Mine-Build Credentials with Key Appointments

High profile Australian mining executive and former Gold Fields executive vice president Mr

Stuart Mathews

appointed to the Board of Directors in the role of Non-Executive Chair.

Well regarded Chilean mining executive and project director for several of

Chile's

largest mine developments,

Mr

Alberto Cerda

, has been appointed to the executive role of Project Director.

Strategic Partnering Process Advancing

Ongoing strategic partnering process to secure qualified partners to support funding and delivery of Costa

Fuego and Huasco Water, with BMO Capital Markets appointed as financial advisor.

A$5.2M

Cash &

A$2.0M

in Returns Expected (VAT reimbursements)

This quarter saw the completion of the Phase 1 drilling at La Verde, located 30km south of Costa Fuego in

coastal Chile (CNW Group/Hot Chili Limited)

Cautionary Statement – JORC Code (2012)

The Costa Fuego Copper-Gold Project is currently at the Pre-Feasibility Study ("PFS") stage. The production

targets and forecast financial information contained in this report are based on technical and economic

assessments that are preliminary in nature. While the PFS incorporates Measured, Indicated, and Inferred

Mineral Resources, there is a lower level of geological confidence associated with Inferred Mineral Resources,

and no certainty that further exploration or development will result in the conversion of Inferred Mineral Resources

to Indicated or Measured categories.

The PFS is not a definitive study and is based on a number of assumptions, including commodity prices, capital

and operating costs, metallurgical recoveries, permitting, and other factors, which are subject to change. The

outcomes of the PFS should not be used as the basis for a final investment decision. Further work, including

additional drilling, metallurgical testing, and detailed engineering, is required before the Company can make a

decision to proceed to development.

Of the Mineral Resources scheduled for extraction in the PFS production plan, more than 99% are classified as

Indicated, with the remaining <1% as Inferred. The Company has concluded that it has reasonable grounds for

disclosing a production target which includes a small amount of Inferred Mineral Resources, as permitted under

the JORC Code. There is a low level of geological confidence associated with Inferred Mineral Resources and

there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or

that the production target itself will be realised. The viability of the development scenario envisaged in the PFS

does not depend on the inclusion of Inferred Mineral Resources. However, it is reasonably expected that the

majority of Inferred Mineral Resources could be upgraded to Measured or Indicated Mineral Resource with

continued drilling.

The Mineral Resources underpinning the production target in the PFS have been prepared by a competent person

in accordance with the requirements of the JORC 2012. For full details on the Mineral Resource estimate, please

refer to the ASX announcement of

27 March 2025

.

To achieve the outcomes indicated in the PFS, including reaching Definitive Feasibility Study ("DFS"), mine

construction and production stages, funding in the order of

US$1.27 Billion

will be required, including pre-

production and working capital and assumed financing charges. Investors should note that that there is no

certainty that Hot Chili will be able to raise that amount of funding when needed. One of the key assumptions is

that the funding for the Project will be available when required and on acceptable terms. It is also possible that

such funding may only be available on terms that may be dilutive to, or otherwise affect the value of, Hot Chili's

existing shares. It is also possible that Hot Chili could pursue other value realisation strategies such as debt

financing, a sale or partial sale of its interest in the Costa Fuego Copper Project and/or Huasco Water, sale of

further royalties and/or streaming rights, sale of non-committed offtake rights, and sale of non-core assets.

The Company cautions that there is no certainty that the results or estimates contained in the PFS will be

realised.

This Report contains forward-looking statements. Hot Chili has concluded that it has a reasonable basis for

providing these forward-looking statements and believes it has a reasonable basis to expect it will be able to fund

development of the Costa Fuego Copper Project. However, a number of factors could cause actual results or

expectations to differ materially from the results expressed or implied in the forward-looking statements. Given

the uncertainties involved, investors should not make any investment decisions based solely of the results of the

PFS.

SUMMARY OF OPERATIONAL ACTIVITIES

La Verde Exploration Update

R

apidly

E

xpanding

D

iscovery

,

Multiple Higher-Grade Centres Confirmed

The phase-one RC drilling programme across the La Verde copper-gold porphyry discovery ("La Verde"), located

30km south of the Company's Costa Fuego Copper-Gold Project ("Costa Fuego"), was completed on

8 April

2025

with a total of 31 RC drillholes for

9,630 m

drilled. Final results from the phase-one drill programme

reported during the quarter confirm:

Three higher-grade centres defined by multiple intersections (refer Figure 1)

Shallow copper-gold (Cu-Au) mineralisation extending over 1 km in length and up to

750 m

in width (refer

Figure 2).

The La Verde discovery remains open laterally and at depth with over half of Hot Chili's drilling ending in

mineralisation (at depth of RC drill capability).

Significant drill results reported during the quarter included:

389 m

grading 0.4% Cu and 0.1 g/t Au from

4 m

depth to end-of-hole

(

DKP030

)

including

46 m

at 0.6% Cu and 0.2 g/t Au from

238 m

including

34 m

at 0.6% Cu and 0.2g/t Au from

322m

120 m

grading 0.4% Cu and 0.1 g/t Au from

6 m

depth

(

DKP028

)

including

48 m

at 0.5% Cu and 0.1 g/t Au from

26 m

and,

114m

at 0.3% Cu, 0.1g/t Au from

318m

depth to end-of-hole

including

34m

at 0.4% Cu, 0.2g/t Au from

380 m

to end-of-hole

114 m

grading 0.4% Cu from

86 m

depth

(

DKP024

)

including

52 m

at 0.5% Cu and 0.1 g/t Au from

96 m

286 m

grading 0.3% Cu and 0.1 g/t Au from

4 m

depth (DKP027)

including

154 m

at 0.4% Cu, 0.1g/t Au from

44 m

228

m grading 0.3% Cu and 0.2 g/t Au from

42 m

depth

(

DKP013

)

including

104 m

at 0.4% Cu and 0.3 g/t Au from

42 m

202 m

grading 0.3% Cu and 0.1 g/t Au from

50 m

depth (DKP017)

including

14 m

at 0.4% Cu and 0.1 g/t Au from

96 m

including

16 m

at 0.4% Cu and 0.1 g/t Au from

180 m

138 m

grading 0.3% Cu and 0.1 g/t Au from

6m

depth to end-of-hole (DKP020)

including

24 m

at 0.4% Cu and 0.1 g/t Au from

6 m

including

48 m

at 0.4% Cu and 0.1 g/t Au from

36 m

including

36 m

at 0.4% Cu and 0.1 g/t Au from

102 m

The Company is planning to commence diamond drilling planned for phase two to extend higher grade centres at

depth. Regulatory application for phase-two drilling access has been submitted and is progressing.

Baseline studies for a second Environmental Impact Assessment ("EIA") are ongoing to ensure timely integration

of La Verde into Costa Fuego's potential future mine plan.

District-Scale Porphyry Cluster Potential Emerging at La Verde

Regional exploration activities reported during the quarter have identified multiple look-alike magnetic features

adjacent to La Verde highlight potential for a broader district-scale porphyry system.

The integration of a 3D magnetic inversion model from ground magnetic data shows a spatial correlation between

the mineralised tonalitic porphyry intrusion and a NNE-SSW trending weakly magnetic anomaly over La Verde.

This magnetic anomaly sits within a localised circular magnetic-low feature. This relationship has been used to

identify three additional circular magnetic-low features (lookalike targets) adjacent to La Verde, all of which are

well-positioned at the intersection point of major regional structures (Figure 3).

In addition to the geophysical data, the Company has also completed 3D geochemical probability modelling using

an extensive regional soil geochemistry programme (Figure 4).

This work has outlined three priority porphyry targets as outlined in Figure 3, with two of these porphyry targets

concealed under shallow gravel cover (blind exploration opportunity). Regulatory applications for access clearing

are being progressed across these new target areas adjacent to La Verde.

Figure 1. Oblique long-section of La Verde Cu-Au porphyry discovery (facing 335 azimuth +35 plunge) outlining

the size potential of the emerging higher-grade centres and the broader copper mineralisation model, which

remains open in all directions. Copper interpolants displayed as 3D meshes, drillholes displayed as thin black

traces. For full details of the drilling intercepts and assay results to date, refer to the Company's announcement

"Hot Chili Announces Latest Drill Results for La Verde" dated 19 May 2025. (CNW Group/Hot Chili Limited)

Figure 2. Plan view slice at 950 RL (± 50 m clipping) of tonalitic (pink polygon) and dioritic porphyry (red polygon)

intrusions compared to the footprint of the +0.2% Copper interpolant (yellow outline). Returned Cu grades

graphed downhole. For full details of the drilling intercepts and assay results to date, refer to the Company's

announcement "Hot Chili Announces Latest Drill Results for La Verde" dated 19 May 2025. (CNW Group/Hot Chili

Limited)

Figure 2. Plan view slice at 950 RL (± 50 m clipping) of tonalitic (pink polygon) and dioritic porphyry (red polygon)

intrusions compared to the footprint of the +0.2% Copper interpolant (yellow outline). Returned Cu grades

graphed downhole. For full details of the drilling intercepts and assay results to date, refer to the Company's

announcement "Hot Chili Announces Latest Drill Results for La Verde" dated 19 May 2025. (CNW Group/Hot Chili

Limited)

Figure 3. Plan view showing the La Verde +0.2% Cu mineralisation interpolant in relation to regional magnetic

destruction footprint (red dashed), local magnetic low features (white dashed), weakly magnetic anomalies (white

line) and Fathom 3D geochemical probability models (purple isosurfaces). Left – shown overlain on reduced-to-

the-pole (RTP) ground magnetics and the 3D magnetic inversion model (sliced at 850 RL, displayed as blocks,

filtered for Magnetic Susceptibility > 0.014). Right – shown in relation to mapped gravel cover, interpreted

regional structures and soil sample coverage. A - A' indicates the position of long section in Figure 4. (CNW

Group/Hot Chili Limited)

Figure 4. Long section view A - A’ facing north-west showing the La Verde +0.2% (yellow) and +0.3% copper

(red) mineralisation interpolants in comparison to the 3D magnetic inversion model (displayed as blocks, filtered

for Magnetic Susceptibility > 0.014) and 3D geochemical target at La Verde North-East. Local circular magnetic

low features are outlined (white dashed line) and locations where shallow weakly magnetic anomalies extend to

the surface are marked with blue arrows. Position of 850 RL depth shown for 3D magnetic inversion model slice

in Figure 3. (CNW Group/Hot Chili Limited)

Table 1 - Drill Holes Completed for Costa Fuego in Quarter 2 2025

Prospect

Hole ID

North

East

RL

Depth

Azimuth

Dip

Results

La Verde

DKP031

6785786

324560

1123

279

272

-60

No Significant Intersection

Table 2 – Significant Intersections returned for Costa Fuego in Quarter 2 2025

Hole_ID

Coordinates

Azim.

Dip

Hole Depth

Intersection

Interval

Copper

Gold

Silver

Molybdenum

North

East

RL

From

To

(m)

(% Cu)

(g/t Au)

(ppm Ag)

(ppm Mo)

DKP013

6785971

324839

1192

244

-60

437

42

270

228

0.3

0.2

0.3

7

Incl

42

146

104

0.4

0.3

0.3

6

Or Incl

50

116

66

0.5

0.3

0.3

5

296

437

141

0.2

0.1

0.4

19

Incl

334

358

24

0.3

0.1

0.7

18

DKP014

6785852

324747

1149

299

-61

444

0

12

12

0.3

0.1

0.3

7

194

204

10

0.3

0.2

0.4

5

306

402

96

0.3

0.1

0.6

20

And incl

340

352

12

0.4

0.1

0.9

14

And incl

366

376

10

0.4

0.2

0.8

14

424

444

20

0.2

0.0

0.5

29

DKP015

6786096

324434

1159

130

-60

313

2

34

32

0.3

0.0

0.9

22

176

313

137

0.2

0.1

0.5

29

Incl

236

242

6

0.4

0.1

0.9

20

DKP016

6785947

324416

1111

111

-60

360

0

48

48

0.4

0.0

0.6

39

Incl

0

22

22

0.6

0.0

0.6

23

286

304

18

0.3

0.1

0.9

52

DKP017

6786094

324685

1184

97

-61

336

50

252

202

0.3

0.1

0.5

31

Incl

96

110

14

0.4

0.1

0.3

12

And incl

144

152

8

0.4

0.2

1.2

55

And incl

180

196

16

0.4

0.1

0.5

55

DKP018

6785835

324429

1094

97

-60

145

16

134

118

0.2

0.0

0.4

24

Incl

20

46

26

0.3

0.0

0.8

19

DKP019

6785720

324718

1130

253

-61

279.5

106

144

38

0.3

0.1

0.5

16

Incl

114

122

8

0.5

0.2

0.7

25

202

279.5

77.5

0.3

0.1

0.5

27

DKP020

6785748

324586

1125

273

-60

144

6

144

138

0.3

0.1

0.9

23

Incl

6

30

24

0.4

0.1

1.1

6

And incl

36

84

48

0.4

0.1

0.9

20

And incl

102

138

36

0.4

0.1

0.8

31

DKP021

6785619

324325

1178

75

-60

402

118

128

10

0.3

0.0

0.4

18

234

314

80

0.3

0.1

0.4

21

Incl

284

300

16

0.4

0.1

0.6

13

324

370

46

0.3

0.1

0.6

14

DKP022

6785527

324414

1184

78

-60

288

44

202

158

0.2

0.0

0.4

18

Incl

44

66

22

0.4

0.1

0.5

11

232

288

56

0.2

0.0

0.5

18

Incl

250

258

8

0.5

0.0

1.6

21

And incl

282

288

6

0.3

0.1

1.0

24

DKP023

6785421

324320

1181

90

-60

402

74

100

26

0.3

0.1

0.4

21

172

196

24

0.3

0.0

0.8

38

254

366

112

0.3

0.1

0.6

26

DKP024

6785424

324417

1186

111

-59

402

54

360

306

0.3

0.0

0.7

28

Incl

86

200

114

0.4

0.0

0.7

23

Or Incl

96

148

52

0.5

0.1

0.8

16

And incl

328

334

6

0.4

0.1

1.2

22

DKP025

6785313

324415

1186

270

-74

276

34

162

128

0.2

0.0

0.5

26

Incl

126

136

10

0.3

0.0

0.3

62

DKP026

6785870

324312

1098

105

-60

147

0

147

147

0.2

0.0

0.6

13

Incl

0

16

16

0.4

0.1

0.6

23

DKP027

6785755

324906

1138

299

-60

402

4

290

286

0.3

0.1

0.4

31

Incl

44

198

154

0.4

0.1

0.5

32

Or Incl

64

76

12

0.5

0.1

0.3

15

DKP028

6785617

324758

1136

300

-60

432

6

126

120

0.4

0.1

0.7

12

Incl

10

20

10

0.5

0.1

1.2

5

And Incl

26

74

48

0.5

0.1

0.8

13

318

432

114

0.3

0.1

0.5

53

Incl

380

414

34

0.4

0.2

0.9

106

Or Incl

384

396

12

0.5

0.2

1.1

221

DKP029

6785615

324758

1136

265

-60

366

6

102

96

0.3

0.1

0.9

19

54

64

10

0.4

0.1

0.8

27

112

206

94

0.2

0.0

0.3

44

252

264

12

0.4

0.0

1.6

33

304

366

62

0.2

0.0

0.3

43

DKP030

6785770

324774

1132

275

-60

393

4

393

389

0.4

0.1

0.9

21

Incl

20

30

10

0.5

0.2

0.5

4

And incl

186

286

100

0.5

0.1

0.9

35

Or Incl

238

284

46

0.6

0.2

0.9

49

And incl

322

356

34

0.6

0.2

0.9

28

DKP031

6785789

324564

1128

279

-60

279

No significant intersection

SUMMARY OF CORPORATE ACTIVITIES

Strategic Partnering Process

Following completion of the Pre-feasibility Studies ("PFS") for Costa Fuego and Huasco Water, Hot Chili initiated

asset-level strategic partnering processes ("Partnering Process") to introduce one or more qualified partners with

the financial, technical and operational capability to assist in funding and delivering each project.

The Partnering Process is ongoing, and the Company confirms it is currently assessing several non-binding,

indicative, incomplete and conditional proposals. The Partnering Process may result in a range of possible

transactions for the projects. Investors are cautioned that there is no certainty the Partnering Process will result

in a transaction or binding agreement. The Company will keep the market updated in accordance with its

continuous disclosure obligations.

Hot Chili has appointed BMO Capital Markets as its financial adviser in connection with the Partnering Process.

Cash Position and Capital Structure Changes

As of

30 June 2025

, the Company had cash of

A$5.2 million

and no debt. In addition, a further

A$2.0M

of

inbound funds are expected over the coming quarter through government VAT reimbursements.

The operating expenditure for quarter ended

30 June 2025

included payments for exploration and evaluation of

A$3.3 million

.

Included in this amount was

A$1.6 million

related to the final invoices for the competition of the Costa Fuego and

Huasco Water Pre-feasibility Studies, initial activities related to the optimisation of the two-studies, and the

advancement of the EIA.

A total of

A$1.7 million

was spent on exploration activities across La Verde and southern landholdings included in

the Domeyko project, with phase-one drilling activities at La Verde having been completed on

10 April 2025

.

The investing expenditure for quarter ended

30 June 2025

included the recoup of joint venture expenditure from

CMP for

A$2.7 million

.

The Company is continuing discussions related to potential renegotiation of forthcoming Option payments in Q4

and is advancing the Partnering Process, as detailed above. In addition, the Company has various other funding

opportunities available should they be required, including royalties, streaming and equity funding.

The following summarises the Company's securities on issue:

153,375,654 ordinary fully paid shares

1,914,000 options at AUD

$1.50

expiring

24 July 2026

1,587,875 service rights

2,321,742 performance rights

Projects Registered for Priority Status by Chilean Ministry of Economy

On

30 April 2025

, Hot Chili announced that its Costa Fuego Copper-Gold Project and Huasco Water Project in

Chile

had been officially registered with the Chilean Ministry of Economy's Office for Sustainable Project

Management (GPS Division).

This registration grants the projects priority status as strategic investments, allowing them to benefit from

streamlined administrative processes. Both projects met the government's criteria for sustainability-focused

development and will now be subject to coordinated oversight aimed at expediting permitting and approvals. This

includes the management of Hot Chili's second maritime concession application for Huasco Water and the

upcoming EIA submissions for both projects.

Appointment of New Chair and Project Director

Hot Chili Limited announced on

7 May 2025

the appointment of Mr

Stuart Mathews

as Non-Executive Chair and

Mr

Alberto Cerda

as Project Director, adding considerable strength to its leadership team heading into a pivotal

stage of growth.

Mr Mathews brings over 32 years of international mining experience, including holding senior executive roles at

Gold Fields where he oversaw operations delivering over one million ounces of gold annually and led the

development of five mining projects from exploration to production.

Mr Cerda, a Chilean mining engineer with more than 40 years of experience, has held senior roles across major

global mining companies including BHP, Barrick, and Glencore. He has directed numerous large-scale projects in

Chile

and abroad, most recently leading the Norte Abierto JV for Newmont and Barrick.

The combined expertise of the two new appointments will be instrumental in guiding Hot Chili through the final

investment phase toward becoming a mid-tier copper-gold producer.

NI43-101 Technical Report Released for Costa Fuego Cu-Au Project PFS

Hot Chili filed an independent NI 43-101 technical report for its Costa Fuego Copper-Gold Project in

Chile

on

SEDAR+. The report, titled

"Costa Fuego Copper Project NI 43–101 Technical Report Preliminary Feasibility

Study"

and dated

9 May 2025

(effective

27 March 2025

), supported the Company's previously announced PFS

results. Prepared in accordance with Canadian disclosure standards, the report confirms there are no material

differences from the information released on

27 March 2025

. It is available on SEDAR+ and the Company's

website.

Additional ASX Disclosure Information

ASX Listing Rule 5.3.2:

There was no substantive mining production and development activities during the

quarter.

ASX Listing Rule 5.3.3 -

Schedule of Mineral Tenements as of

30 June 2025

.

The schedule of Mineral Tenements and changes in interests is appended at the end of this activities report.

ASX Listing Rule 5.3.4:

Reporting under a use of funds statement in a Prospectus does not apply to the

Company currently.

ASX Listing Rule 5.3.5:

Payments to related parties of the Company and their associates during the quarter per

Section 6.1 of the Appendix

5B

totalled

$170,000

. This is comprised of directors' salaries and superannuation of

$170,000

.

Health, Safety, Environment and Quality

Field operations during the period included geological reconnaissance activities, RC drilling, field mapping, and

sampling exercises across the major Cortadera and Productora landholdings, as well as the new project at La

Verde. Activities on new tenements are run from the Productora or Cortadera operations centres and their safety

statistics are included under the figures for all projects.

There were no Lost Time Injuries ("LTI") during the quarter.

Hot Chili's sustainability framework ensures an emphasis on business processes that target long-term economic,

environmental and social value. The Company is dedicated to continual monitoring and improvement of health,

safety and the environmental systems. There is no greater importance than ensuring the safety of our people and

their families.

Table 3. HSEQ Quarter 2 2025 Performance and Statistics

Deposit

Productora

Cortadera

All Projects

Timeframe

Q2

2025

Cum.²

2019

Q2

2025

Cum.²

2019

Q2

2025

Cum.²

2019

LTI events

0

0

0

6

0

8

NLTI events

0

4

0

6

0

11

Days lost

0

0

0

152

0

263

LTIFR index

0

0

0

20

0

18

ISR index

0

0

0

506

0

585

IFR Index

0

40

0

40

0

42

Thousands of man-hours

7.8

100

2.6

301

10.9

450

Incidents on materials and assets

0

1

0

0

0

1

Environmental incidents

0

0

0

0

0

0

Headcount¹

19

12

9

30

30

49

Notes: HSEQ is the acronym for Health, Safety, Environment and Quality. LTIFR per million-manhours. Safety performance is reported on a monthly basis to the National Mine Safety Authority on a standard

E-100 form; (1) Average monthly headcount (2) Cumulative statistics since April 2019.

Tenement Changes During the Quarter

During the Quarter, Sociedad Minera El Águila SpA ("SMEA") has claimed 8 mining exploration concessions

("

Sierra Solis

1", "

Sierra Solis

2", "

Sierra Solis

3", "

Sierra Solis

4", "

Sierra Solis

5", "

Sierra Solis

6", "

Sierra Solis

7" and "

Sierra Solis

8") which are in the process of being constituted.

The Company's existing tenements are detailed in the table below.

Table 4. Current Tenement Holdings in

Chile

as of

30 June 2025

Cortadera Project Tenements

Cortadera Project

N°

License ID

HCH % Held

HCH % Earning

Area (ha)

Agreement Details

1

ALCENIA 1/10

100% SMEA SpA

50

2

AMALIA 942 A 1/6

100% Frontera SpA

53

3

ATACAMITA 1/82

100% Frontera SpA

82

4

CORROTEO 1 1/260

100% Frontera SpA

260

5

CORROTEO 5 1/261

100% Frontera SpA

261

6

CORTADERA 1 1/200

100% Frontera SpA

200

7

CORTADERA 1/40

100% Frontera SpA

374

8

CORTADERA 2 1/200

100% Frontera SpA

200

9

CORTADERA 41

100% Frontera SpA

1

10

CORTADERA 42

100% Frontera SpA

1

11

LAS CANAS 1/15

100% Frontera SpA

146

12

LAS CANAS 16

100% Frontera SpA

1

13

LAS CANAS ESTE 2003 1/30

100% Frontera SpA

300

14

MAGDALENITA 1/20

100% Frontera SpA

100

15

PAULINA 10 B 1/16

100% Frontera SpA

136

16

PAULINA 11 B 1/30

100% Frontera SpA

249

17

PAULINA 12 B 1/30

100% Frontera SpA

294

18

PAULINA 13 B 1/30

100% Frontera SpA

264

19

PAULINA 14 B 1/30

100% Frontera SpA

265

20

PAULINA 15 B 1/30

100% Frontera SpA

200

21

PAULINA 22 A 1/30

100% Frontera SpA

300

22

PAULINA 24 1/24

100% Frontera SpA

183

23

PAULINA 25 A 1/19

100% Frontera SpA

156

24

PAULINA 26 A 1/30

100% Frontera SpA

294

25

PAULINA 27A 1/30

100% Frontera SpA

300

26

PURISIMA 1/8 (1/2 Y 5/6)

100% Frontera SpA

20

NSR 1.5%

27

CF 1

100% Frontera SpA

300

28

CF 2

100% Frontera SpA

300

29

CF 3

100% Frontera SpA

300

30

CF 4

100% Frontera SpA

300

31

CF 5

100% Frontera SpA

200

32

CF 6

100% Frontera SpA

200