Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GT.V ·

Palladium One Intersects Widest Intercept to Date Southwest of the Kaukua Open Pit Resource

Drill Results

Palladium One Intersects Widest Intercept to

Date Southwest of the Kaukua Open Pit

Resource Estimate, Finland, 1.6 g/t Pd_Eq over

121 Meters

Highlights

Widest ore grade intercept to date, intersected 250 meters southwest and down plunge of

the current Kaukua Open Pit Mineral Resource Estimate ("MRE").

2.1 g/t Palladium Equivalent (Pd_Eq) over 33.5 meters, within 1.6 g/t Pd_Eq over 121.1

meters

, in hole LK21-105,

with individual samples grading up to

16.0 g/t Pd_Eq

over 0.6 meters.

Three holes

(LK21-101, 102 and 105),

spread over 220-meters laterally, have all intersected

the down plunge, high-grade 'Core Zone' of the current pit constrained Kaukua Open Pit.

High-grade 'Core Zone' of the Kaukua Open Pit remains open to depth.

Toronto, Ontario--(Newsfile Corp. - January 11, 2022) - Initial down plunge drilling, has intersected the

widest ore-grade intercept to date, southwest of the 2019 open-pit constrained MRE of the Kaukua

Deposit. Hole LK21-105 intersected

2.1 g/t Pd_Eq over 33.5 meters, within 1.6 g/t Pd_Eq over

121.1 meters

, starting at a true depth of approximately 260 meters (Figure 2), said

Palladium One

Mining Inc.

(TSXV: PDM) (OTCQB: NKORF) (FSE: 7N11) ("Palladium One" or the "Company").

Derrick Weyrauch, President and CEO, commented: "We have extended the 'Core Zone' of the Kaukua

Deposit

250 beyond the current conceptual open-pit

and hole LK21-105 is among the

thickest

intercepts to date

within the Kaukua Deposit and

adds significant tonnage

to our existing resource

endowment. The high-grade 'Core Zone' of the Kaukua Deposit remains open to the southwest for more

expansion. An updated NI43-101 Mineral Resource Estimate is schedule for release in Q1 2022 and will

incorporate these valuable results"

These drilling results extend a broad, >200-meter wide 'core zone' of mineralization 250-meters

southwest of the existing conceptual open-pit, and it remains open for expansion (Figure 1 and 2, and 3).

Importantly, the previous geological interpretations suggested that the Kaukua Deposit was cut-off by a

northwest trending fault, occupying a distinct magnetic low and topographic lineament. Drilling has now

demonstrated that the magnetic low is the result of a later cross cutting dyke (now referred to as the high-

titanium gabbro dyke) and that the

Kaukua Deposit remains open to the south

. Significantly the high-

grade 'Core Zone' of the Kaukua Deposit has been extended 250 meters to the southwest and we have

encountered some of the thickest intercepts (>100m) to date within the deposit (see news release

November 23, 2021

).

Figure 1.

Historic and current drilling in the Kaukua area having a drill data cut-off date of September

30, 2021 (hole LK21-137), assays have been received for holes up to LK21-108, the remainder are

pending. Background is Induced Polarization ("IP") Chargeability.

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/6502/109611_d3d01541e4fbb877_001full.jpg

Figure 2.

Cross sections showing holes LK21-099, 103, 104, 105 and 106 and historic holes KAU09-

049 and KAU12-060, and their position with respect to the 2019 Kaukua Mineral Resource Estimate

Whittle Open Pit.

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/6502/109611_d3d01541e4fbb877_002full.jpg

Figure 3.

Cross section showing holes LK21-100, 108, historic holes KAU09--040, 042, 043, KAU12-

053 and their position with respect to the 2019 Kaukua Whittle Open-Pit constrained Mineral Resource

Estimate.

To view an enhanced version of Figure 3, please visit:

https://orders.newsfilecorp.com/files/6502/109611_d3d01541e4fbb877_003full.jpg

Table 1. LK Project, select Kaukua Drill Hole Results

Hole

From (m)

To (m)

Width (m)

Pd_Eq

g/t*

In-Situ

Pd_Eq g/t*

Estimated

Recovered

PGE

(Pt+Pd+Au)

Pd g/t

Pt g/t

Au g/t

Cu %

Ni

%

Co g/t

LK21-100

Upper

Zone

37.6

64.0

26.4

0.67

0.42

0.16

0.09

0.03

0.04

0.09

0.10

71

Inc.

37.6

42.0

4.4

1.03

0.67

0.38

0.21

0.09

0.07

0.14

0.13

74

Lower

Zone

246.2

359.5

113.4

1.46

0.93

0.87

0.61

0.21

0.04

0.09

0.14

89

Inc.

246.2

284.5

38.4

2.03

1.33

1.30

0.91

0.32

0.07

0.14

0.17

95

Inc.

249.5

259.0

9.6

3.27

2.21

2.25

1.54

0.54

0.17

0.27

0.21

111

Inc.

249.5

254.0

4.6

4.02

2.71

2.82

1.94

0.68

0.21

0.30

0.26

121

And

330.8

338.0

7.2

2.99

2.03

2.31

1.69

0.53

0.08

0.18

0.16

85

Inc.

330.8

335.0

4.2

3.98

2.71

3.20

2.35

0.75

0.10

0.21

0.19

98

Inc.

330.8

332.0

1.2

5.65

3.85

4.65

3.50

1.01

0.14

0.25

0.25

132

And

351.0

359.5

8.5

2.73

1.81

1.87

1.31

0.49

0.07

0.19

0.20

105

Inc.

358.0

359.5

1.5

5.88

3.97

4.45

2.95

1.42

0.08

0.48

0.33

111

LK21-101

Upper

Zone

83.0

100.8

17.8

0.76

0.45

0.15

0.08

0.03

0.04

0.08

0.13

103

Lower

Zone

272.6

347.1

74.5

1.46

0.94

0.72

0.49

0.17

0.06

0.13

0.16

92

Inc.

276.9

298.7

21.8

1.68

1.08

0.92

0.61

0.23

0.08

0.13

0.17

92

Inc.

290.6

298.7

8.1

2.49

1.67

1.52

1.00

0.36

0.16

0.24

0.20

93

And

325.4

345.0

19.6

2.22

1.47

1.19

0.81

0.28

0.10

0.24

0.21

106

Inc.

325.4

334.0

8.6

2.70

1.84

1.65

1.13

0.38

0.13

0.30

0.20

83

Inc.

333.0

334.0

1.0

4.15

2.77

1.51

1.03

0.29

0.19

0.70

0.48

177

LK21-102

Upper

Zone

62.8

82.5

19.7

0.68

0.42

0.16

0.09

0.03

0.04

0.09

0.10

76

Lower

Zone

248.2

361.8

113.6

1.57

1.02

0.92

0.63

0.23

0.06

0.12

0.14

92

Inc.

291.5

361.8

70.3

1.85

1.22

1.15

0.80

0.29

0.07

0.15

0.15

90

Inc.

291.5

305.2

13.7

3.16

2.12

2.21

1.58

0.55

0.09

0.24

0.21

107

Inc.

296.0

299.0

3.0

4.22

2.79

3.07

2.22

0.77

0.08

0.21

0.30

141

And

348.7

361.8

13.1

3.04

2.04

2.03

1.39

0.51

0.12

0.26

0.21

104

Inc.

357.7

359.7

2.0

7.98

5.52

5.82

3.97

1.48

0.37

0.78

0.41

138

Inc.

358.7

359.7

1.0

9.56

6.64

7.08

4.81

1.83

0.44

0.95

0.46

150

LK21-103

Upper

Zone

54.3

77.0

22.7

0.88

0.55

0.27

0.10

0.03

0.13

0.10

0.12

83

Inc.

55.9

62.0

6.2

1.23

0.84

0.57

0.13

0.05

0.38

0.15

0.12

72

Lower

Zone

248.0

343.5

95.5

0.75

0.45

0.29

0.20

0.07

0.02

0.05

0.11

78

Inc.

258.0

330.5

72.5

0.84

0.50

0.31

0.21

0.08

0.02

0.05

0.13

88

Inc.

258.0

275.0

17.0

1.19

0.72

0.49

0.35

0.12

0.03

0.07

0.17

108

Inc.

272.0

273.5

1.5

3.12

2.11

2.01

1.42

0.46

0.13

0.29

0.22

128

And

319.8

330.5

10.7

1.27

0.83

0.82

0.57

0.20

0.04

0.09

0.10

63

Inc.

326.0

329.0

3.0

2.18

1.44

1.39

0.97

0.33

0.08

0.16

0.18

82

LK21-104

Upper

Zone

15.3

43.0

27.8

0.81

0.51

0.18

0.10

0.03

0.06

0.12

0.12

83

Inc.

16.8

22.0

5.3

1.07

0.69

0.34

0.17

0.07

0.10

0.16

0.14

75

Lower

Zone

209.5

278.0

68.5

0.75

0.42

0.20

0.14

0.05

0.01

0.03

0.14

89

Inc.

211.2

221.2

10.0

1.28

0.79

0.60

0.42

0.16

0.03

0.08

0.16

105

LK21-105

Upper

Zone

120.4

131.1

10.8

0.86

0.53

0.20

0.11

0.03

0.06

0.11

0.13

92

Lower

Zone

304.3

425.3

121.1

1.57

1.01

0.85

0.59

0.21

0.05

0.13

0.16

94

Inc

321.0

323.7

2.7

3.13

2.15

2.12

1.53

0.49

0.10

0.31

0.18

116

And

344.0

346.9

2.9

4.34

2.92

2.69

1.85

0.66

0.18

0.43

0.33

160

Inc.

346.0

346.9

0.9

7.78

5.29

5.18

3.58

1.25

0.35

0.75

0.52

206

And

390.8

424.3

33.5

2.07

1.36

1.19

0.82

0.29

0.08

0.18

0.19

96

Inc.

407.7

418.9

11.3

2.56

1.65

1.37

0.97

0.32

0.09

0.21

0.27

116

Inc.

407.7

408.2

0.6

15.99

9.54

6.07

4.91

1.07

0.09

0.85

2.60

725

LK21-106

Upper

Zone

123.1

137.9

14.8

0.95

0.56

0.20

0.12

0.03

0.05

0.09

0.16

119

Inc.

129.0

130.5

1.5

1.50

0.94

0.43

0.26

0.06

0.12

0.17

0.22

138

Lower

Zone

271.3

301.5

30.2

0.84

0.51

0.34

0.22

0.09

0.03

0.05

0.12

88

Hole

From (m)

To (m)

Width (m)

Pd_Eq

g/t*

In-Situ

Pd_Eq g/t*

Estimated

Recovered

PGE

(Pt+Pd+Au)

Pd g/t

Pt g/t

Au g/t

Cu %

Ni

%

Co g/t

Inc.

271.3

277.0

5.7

1.34

0.82

0.59

0.40

0.16

0.03

0.10

0.17

119

LK21-107

Upper

Zone

86.3

107.0

20.7

0.70

0.42

0.14

0.08

0.03

0.04

0.09

0.11

82

Inc.

89.0

90.0

1.0

1.22

0.80

0.45

0.24

0.12

0.10

0.19

0.14

91

Lower

Zone

253.5

262.6

9.1

0.77

0.53

0.17

0.12

0.05

0.01

0.19

0.08

75

Inc.

261.7

262.6

0.9

3.16

2.71

0.03

0.00

0.00

0.03

1.84

0.08

120

LK21-108

Upper

Zone

55.7

87.0

31.3

0.59

0.36

0.12

0.06

0.02

0.03

0.08

0.09

74

Inc.

77.2

79.3

2.1

1.15

0.78

0.24

0.12

0.03

0.08

0.26

0.14

98

Lower

Zone

264.0

345.9

81.9

0.86

0.51

0.32

0.21

0.07

0.03

0.05

0.13

95

Inc.

265.5

277.2

11.7

1.21

0.73

0.56

0.41

0.13

0.03

0.05

0.16

106

And

336.0

345.9

9.9

2.03

1.34

1.24

0.84

0.29

0.11

0.16

0.17

103

Inc.

337.7

341.0

3.3

3.57

2.44

2.44

1.69

0.58

0.17

0.33

0.22

108

Hole

From (m)

To (m)

Width (m)

Pd_Eq

g/t*

In-Situ

Pd_Eq g/t*

Estimated

Recovered

PGE

(Pt+Pd+Au)

Pd g/t

Pt g/t

Au g/t

Cu %

Ni

%

Co g/t

* Pd_Eq calculated using in-situ values and prices from the 2021 NI43-101 Haukiaho Mineral

Resource Estimate; $1,600/oz Pd, $1,100/oz Pt, $1,650/oz Au, $3.50 Cu, and $7.50/lb Ni, and $20/lb

Co. Limited historical metallurgical work on the Kaukua Deposit indicates final recoveries in the range

of 73% Pd, 56% Pt, 78% Au, 91% Cu, 48% Ni and 48% Co and are used in the Estimated Recovered

Pd_Eq grade calculation.

**Italicised orange highlighted results are previously released results see news release

November 23,

2021

.

Palladium Equivalent

The Company is calculating Palladium equivalent using US$1,600 per ounce for palladium, US$1,100

per ounce for platinum, US$1,650 per ounce for gold, US$3.50 per pound for copper, US$7.50 per

pound for nickel, and $20 per pound cobalt consistent with the calculation used in the Company's

September 2021 NI 43-101 Haukiaho Resource Estimate.

Qualified Person

The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P.

Geo., Vice President of Exploration and a director of the Company and the Qualified Person as defined

by National Instrument 43-101

About Palladium One

Palladium One Mining Inc. (TSXV: PDM) is focused on discovering environmentally and socially

conscious

Metals for Green Transportation

. A Canadian mineral exploration and development

company, Palladium One is targeting district scale, platinum-group-element (PGE)-copper-nickel

deposits in leading mining jurisdictions. Its flagship project is the Läntinen Koillismaa (LK) Project in

north-central Finland, which is ranked by the Fraser Institute as one of the world's top countries for

mineral exploration and development. LK is a PGE-copper-nickel project that has existing Mineral

Resources. PDM's second project is the 2020 Discovery of the Year Award winning Tyko Project, a

high-grade sulphide, copper-nickel project located in Canada. Follow Palladium One on

LinkedIn

,

Twitter

, and at

www.palladiumoneinc.com

.

ON BEHALF OF THE BOARD

"Derrick Weyrauch"

President & CEO, Director

For further information contact:

Derrick Weyrauch, President & CEO

Email:

[email protected]

Neither the TSX Venture Exchange nor its Market Regulator (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

This press release is not an offer or a solicitation of an offer of securities for sale in the United States

of America. The common shares of Palladium One Mining Inc. have not been and will not be

registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the

United States absent registration or an applicable exemption from registration.

Information set forth in this press release may contain forward-looking statements. Forward-looking

statements are statements that relate to future, not past events. In this context, forward-looking

statements often address a company's expected future business and financial performance, and often

contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements

that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar

expressions. By their nature, forward-looking statements involve known and unknown risks,

uncertainties and other factors which may cause our actual results, performance or achievements, or

other future events, to be materially different from any future results, performance or achievements

expressed or implied by such forward-looking statements. Such factors include, among others, risks

associated with project development; the need for additional financing; operational risks associated

with mining and mineral processing; fluctuations in palladium and other commodity prices; title

matters; environmental liability claims and insurance; reliance on key personnel; the absence of

dividends; competition; dilution; the volatility of our common share price and volume; and tax

consequences to Canadian and U.S. Shareholders. Forward-looking statements are made based on

management's beliefs, estimates and opinions on the date that statements are made and the

Company undertakes no obligation to update forward-looking statements if these beliefs, estimates

and opinions or other circumstances should change. Investors are cautioned against attributing

undue certainty to forward-looking statements.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/109611