Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GT.V ·

GT Resources Intersects 2.0% Nickel over 33.5 meters at the Canalask Nickel-Copper Project

Drill Results

GT Resources Intersects 2.0% Nickel over 33.5

meters at the Canalask Nickel-Copper Project

Toronto, Ontario--(Newsfile Corp. - November 4, 2024) - GT Resources Inc. (TSXV: GT) (OTCQB:

CGTRF) (FSE: 7N1) (the

"Company"

or "

GT Resources

") is pleased to announce additional diamond

drill assay results from the 2024 exploration campaign at the Canalask Nickel-Copper Project, Yukon,

Canada.

1.95% nickel

, 0.05% copper, 0.03% cobalt 0.19 g/t gold, and 0.44 g/t palladium was intersected

over 33.5 meters

(Hole CSK24-05) in the Footwall Zone.

including

4.15% Ni

, 0.04% Cu, 0.07% Co, 0.24 g/t Au, and 0.85 g/t Pd

over 5.5 meters

.

including

12.90% Ni

, 0.12% Cu, 0.23% Co, and 0.81 g/t Au over 0.2 meters.

The intercept began close to surface, at 24.6 meters down hole.

"Drill hole CSK-24-05 returned another broad interval of predominantly nickel mineralization and

impressive grades. In addition to the significant wide zone of high-grade nickel mineralization, previously

unrecognized precious metals including palladium and gold were encountered. 2024's drilling program

suggests the Footwall Zone comprises a combination of physically and hydrothermally remobilized nickel

sulphide. The presence of footwall hosted nickel sulphide also suggests that a larger accumulation of

nickel sulphide ought to occur within the immediately adjacent Kluane Ultramafic Feeder Dyke.

"The favourable gabbro zonet at the base of the ultramafic dyke was not tested in 2024, however the

Company plans to test the gabbro zone / basal contact during the 2025 drill program.

Gabbro hosted

mineralization within this zone, returned 0.8% Ni and 0.2% Cu over 3 meters in historic hole VQ-7 and is

the primary massive-sulphide target at Canalask," stated Derrick Weyrauch, President and CEO.

Figure 1.

Location Map of Canalask project, 2024 drill program (yellow dots), background is total field

magnetics. Newly staked claims are outlined in blue on inset image in the top right-hand corner.

1. see Historical Resource Estimate disclaimer below

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6502/228694_d45d1200145a9820_001full.jpg

Figure 2.

Drill hole location map superimposed on an Isometric view looking southwest of the modelled

ultramafic dyke (purple), modelled Electromagnetic ("EM") Maxwell plate (yellow) and position of historic

drill holes including VQ-7 which intersected mineralized gabbro. Inset map in the upper left is a stylized

cross section showing the depth achieved by 2024 drill holes within the feeder dyke and illustrates the

exploration target consisting of disseminated and massive magmatic sulphides located within and

adjacent to gabbroic rocks at the base of the ultramafic dyke.

1. see Historical Resource Estimate disclaimer below

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6502/228694_d45d1200145a9820_002full.jpg

Figure 3.

Drill hole cross section of the Footwall Zone looking west.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6502/228694_d45d1200145a9820_003full.jpg

Figure 4.

Massive sulphide vein at 55.1-55.2 meters down hole in CSK24-05, containing a matrix of

pyrrhotite (darker grey) and pentlandite (brighter white spots), this sample returned

12.9% Ni

over 0.2

meters.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6502/228694_d45d1200145a9820_004full.jpg

This summer's program represented the Company's first drilling campaign on the Canalask project. In

addition to drilling the Company conducted down-hole surveys and is currently reviewing the Borehole

Electromagnetic ("BHEM") data.

A total of 5 holes were drilled totaling 1,010 meters. Two (2) holes targeted the historic high-grade

Footwall style mineralization (Figure 1, 2, 3 & 4) while three (3) holes were planned to pierce the

Electromagnetic ("EM") conductor (see news release

January 16, 2024

) and the favourable gabbro at

the base of the Ultramafic Feeder Dyke.

While drilling proceeded smoothly on the Footwall Zone holes, challenging overburden and blocky faulted

ground was encountered within the ultramafic Feeder Dyke. As such only one of the three holes tested

the shallow EM conductor, which now appears to be the result of thin pyrrhotite coated fractures in brittle

fault zones. None of the three holes targeting the massive sulphide potential of the gabbro unit at the

base of the Feeder Dyke achieved planned depth.

Within this gabbro unit at the base of the Feeder

Dyke, historic hole VQ-07 returned 0.8% Ni and 0.2% Cu over 3 meters (Figure 2).

The Footwall Style mineralization consisted of massive veins, pods and disseminations of pyrrhotite-

pentlandite hosted within intermediate volcanic rocks (Figure 4). This style of mineralization bears

hallmarks of both physical and hydrothermal remobilization of nickel-sulphide and segregation of nickel-

rich and copper-rich sulphide zones. The presence of such significant footwall mineralization suggests

an undiscovered source of nickel-copper sulphide could exist within the ultramafic Feeder Dyke. Future

exploration will try and trace a physical connection between the Footwall Style mineralization and the

prospective basal gabbro unit, future drilling will target the ultramafic dyke footwall contact near the

historic high-grade Footwall Zone.

Table 1:

Assay Results: Canalask Project 2024 drill results.

Hole

Target

From

(m)

To

(m)

Width

(m)

Ni

%

Cu

%

Co

%

TPM g/t

(Pd+Pt+Au)

Pd

g/t

Pt

g/t

Au

g/t

CSK24-01

Feeder Dyke

Stopped short of target, assays pending

CSK24-02

Footwall

17.6

37.5

19.9

2.12

0.03

0.03

0.56

0.37

0.00

0.19

Inc.

19.4

26.7

7.4

3.42

0.04

0.04

0.90

0.53

0.00

0.37

Inc.

24.5

25.8

1.3

4.45

0.05

0.06

1.82

1.44

0.00

0.37

Footwall

56.0

71.0

15.0

0.28

0.17

0.01

0.04

0.00

0.00

0.03

Inc

61.5

69.0

7.6

0.41

0.21

0.02

0.06

0.00

0.00

0.05

Footwall

101.0

103.5

2.5

0.41

0.24

0.04

0.03

0.00

0.00

0.03

Inc.

102.0

102.5

0.5

1.34

0.37

0.09

0.10

0.00

0.00

0.10

Gold-Copper

137.5

138.6

1.1

0.01

1.24

0.01

0.42

0.00

0.00

0.42

CSK24-03

Feeder Dyke

Stopped short of target, assays pending

CSK24-04

Feeder Dyke

Stopped short of target, assays pending

CSK24-05

Footwall

24.6

58.1

33.5

1.95

0.05

0.03

0.63

0.44

0.00

0.19

Inc.

28.1

39.1

11.0

2.67

0.12

0.04

0.73

0.42

0.00

0.30

Inc.

33.0

37.1

4.1

4.08

0.04

0.05

0.99

0.65

0.00

0.35

And

51.0

56.5

5.5

4.15

0.04

0.07

1.09

0.85

0.00

0.24

Inc.

55.1

55.3

0.2

12.90

0.12

0.23

0.82

0.01

0.00

0.81

Footwall

77.0

87.0

10.0

0.24

0.00

0.01

0.03

0.00

0.00

0.02

87m to End of Hole assays pending

Hole

Target

From

(m)

To

(m)

Width

(m)

Ni

%

Cu

%

Co

%

TPM g/t

(Pd+Pt+Au)

Pd

g/t

Pt

g/t

Au

g/t

(1)

Reported widths are "drilled widths" not true widths and may not be indicative of the true grade, width and style of mineralization on the property.

(2) Values from hole CSK24-02 are previously released, see

news release September 24, 2024

Table 2:

Drill Hole Locations for this News Release

Hole

Azimuth

Dip

Length

NAD83 z7 East

NAD83 z7 North

Elevation

CSK-24-01

45

-65

127

525012.5

6868606

800

CSK-24-02

350

-50

200

524332.6

6869344

755

CSK-24-03

25

-75

104

525012.5

6868606

800

CSK-24-04

25

-75

408.5

525252.5

6868661

791

CSK-24-05

346

-69.6

170

524332.6

6869344

756

Exploration Target

The "White River Intrusive Complex" ("WRIC") is a favourable setting for magmatic nickel-copper

sulphide mineralization and is considered a "feeder system" with a high volume of magma flow. Due to

the abundance of magmatic Ni-Cu-PGE showings at the base of the WRIC and the discovery of the

nickel-rich Canalask footwall deposit, the project hosts strong potential for both "magmatic feeder-type"

basal deposits and "epigenetic footwall-type" footwall deposits. The geological setting draws

comparison to the world-class Norilsk Ni-Cu-PGE camp.

Disclaimer - Historical Resource Estimate - Canalask

Readers are cautioned that the Company has not attempted to verify historic mineral resource estimates

and therefore readers should not place any reliance on any historical estimate. A qualified person has

not done sufficient work to classify a historical estimate as a current mineral resource, additionally, a

qualified person has not yet determined what work needs to be done to upgrade or verify a historical

estimate as a current mineral resources or mineral reserves. The Company is not treating any historical

estimates as current mineral resources.

A Historical Resource Estimate on the Main Zone (also referred to as the Footwall Zone) of the

Canalask Project is quoted at 400,000 tonnes at 1.35% nickel (copper was not reported) by Discovery

Mines Ltd. in 1968 (Yukon Assessment Report 094599). The parameters, methodology and categorise

used are not known, and thus the reliability of the estimate cannot be determined, however, it is still

considered relevant as underground development and diamond drilling in the 1950 & 1960s supported

the estimate and provides a guide for future exploration.

QA/QC

The drilling program was carried out under the supervision of Neil Pettigrew, M.Sc., P.Geo., Vice

President of Exploration, and a Director of the Company.

Drill core samples were split using a rock saw by Company staff, with half retained in the core box and

stored in a secured locked facility in Whitehorse.

Samples were transported in secure bags directly by Company staff from the logging facility at the onsite

exploration camp, to the ALS Geochemistry ("ALS") lab in Whitehorse, Yukon. All samples are crushed

to 2 millimeters with a 250-gram split pulverized to 105 microns. Analysis for PGEs is performed using a

30 grams fire assay with an ICP-MS finish and for Ni, Cu, and Co using 0.25 grams by 4 acid digestion

with ICP-AES finish. Ni, Cu and Co samples over 1.0 wt% were re-analysed by ore grade methods using

4 acid digestion with ICP-AES finish.

Certified standards, blanks and crushed duplicates are placed in the sample stream at a rate of one

QA/QC sample per 10 core samples. Results are analyzed for acceptance within the defined limits of the

standard used before being released to the public.

Qualified Person

The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc.,

P.Geo., Vice President of Exploration and a director of the Company and the Qualified Person as

defined by National Instrument 43-101.

About GT Resources Inc.

GT Resources Inc. (TSXV: GT) is a mineral exploration company with a strategy to develop copper and

nickel mining projects in Europe and North America. Our projects are located in Finland and Canada

and are comprised of district scale opportunities that have attracted strategic investment from a major

mining company.

Follow GT Resources on

LinkedIn

,

Twitter

, and at

www.gtresourcesinc.com

.

ON BEHALF OF THE BOARD

"Derrick Weyrauch"

President & CEO, Director

For further information contact:

Derrick Weyrauch, President & CEO

Email:

[email protected]

Neither the TSX Venture Exchange nor its Market Regulator (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

This press release is not an offer or a solicitation of an offer of securities for sale in the United States

of America. The common shares of GT Resources Inc. have not been and will not be registered under

the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States

absent registration or an applicable exemption from registration.

Information set forth in this press release may contain forward-looking statements. Forward-looking

statements are statements that relate to future, not past events. In this context, forward-looking

statements often address a company's expected future business and financial performance, and often

contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements

that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar

expressions. By their nature, forward-looking statements involve known and unknown risks,

uncertainties and other factors which may cause our actual results, performance or achievements, or

other future events, to be materially different from any future results, performance or achievements

expressed or implied by such forward-looking statements. Such factors include, among others, risks

associated with project development; the need for additional financing; operational risks associated

with mining and mineral processing; fluctuations in mineral and commodity prices; title matters;

environmental liability claims and insurance; reliance on key personnel; the absence of dividends;

competition; dilution; the volatility of our common share price and volume; and the impact of

governmental entities. Forward-looking statements are made based on management's beliefs,

estimates and opinions on the date that statements are made and the Company undertakes no

obligation to update forward-looking statements if these beliefs, estimates and opinions or other

circumstances should change. Investors are cautioned against attributing undue certainty to forward-

looking statements.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/228694