Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GSVR.V ·

~ Guanajuato Silver Appoints Reynaldo Rivera VP Exploration ~

Management Changes

3

~ Guanajuato Silver Appoints Reynaldo Rivera VP Exploration ~

September 27, 2022 – Vancouver, British Columbia – Guanajuato Silver Company Ltd. (the “ Company” or

“GSilver”) (TSXV:GSVR)(OTCQX:GSVRF) is pleased to announce the appointment of Reynaldo Rivera Abundis to

the position of VP Exploration. Mr. Rivera is a seasoned geological engineer, who brings over 45 years of mineral

exploration success to his position at GSilver.

Commenting on this appointment, Ramon Davila, President of GSilver said, “I had the pleasure to work closely

with Reynaldo while at Luismin S.A. de C.V., and I have followed his accomplished career ever since; he is one of

Mexico’s most successful and imaginative geologists who will bring central leadership to Guanajuato Silver’s

multiple exploration teams currently working at Topia, San Ignacio, Valenciana and El Cubo.”

From 2005-2015 Mr. Rivera was the Director of Exploration for Goldcorp Inc. ( Mexico); in this role he was

responsible for notable exploration successes at several of Mexico’s most important precious metal mines:

• At the San Dimas Mine, one of Durango’s most significant precious metals deposits, Mr. Rivera made two

new discoveries in the western part of the district that are now in production by First Majestic Silver Corp.

(TSX:FM). San Dimas is located within the same mineral trend, and approximately 140km SE, of the

Company’s producing Topia mine.

• At Peñasquito - the world’s 2 nd largest silver mine - l ocated in the State of Zacatecas and owned by

Newmont (NYSE: NEM) - Mr. Rivera led exploration programs that dramatically increased reserves and

resources.

• At the Los Filos Mine in Guerrero State, Mr. Rivera directed exploration programs that led to increased

reserves and resources - and life of mine - at what is now one of the largest operating gold mines in

Mexico. Los Filos is currently owned by Equinox Gold (TSX: EQX).

Prior to his involvement with Goldcorp Inc. (Mexico), from 1990-2002, Mr. Rivera was the General Manager of

Exploration for Luismin S.A. de C.V., which was acquired by Wheaton River Minerals in 2002; Mr. Rivera then

served as Manager of Mine Geology for Wheaton River Minerals from 2003-2005 before that company was

acquired by Goldcorp in 2005.

In 2007, Mr. Rivera was awarded the National Geology Award by the Association of Metallurgical Mining Engineers

and Geologists of Mexico. Mr. Rivera is a graduate of the University of Arizona (Economic Geology), and the

University of San Luis Potosi (Geological Engineering); since 2004, he h as been a Qualified Person (QP) as a

member of the Australasian Institute of Mining and Metallurgy (AusIMM - Registration Number 220979).

In connection with this appointment, the Company has approved the granting of 100,000 stock options to Mr.

Rivera. The options, which shall vest over a two-year period, are exercisable up to five years from the grant date

and have a strike price of 33 cents.

L

ondon (Aquis Stock Exchange Growth Market) trading Update:

GSilver also wishes to announce its intention to apply for admission to trading on the Aquis Stock Exchange Growth

Market (Apex Segment) in London, England. It is expected trading will commence in Q4 2022. Admission to the

Aquis Stock Exchange will allow for greater liquidity of the Company’s shares in the UK and Europe and encourage

4

trading especially by British institutional and retail investors. VSA Capital Limited is acting as the Aquis Stock

Exchange Corporate Adviser and Broker to the Company.

About Guanajuato Silver

GSilver is a precious metals producer engaged in reactivating past producing silver and gold mines

near the city of Guanajuato, Mexico, which has an established 480-year mining history. With five

mines and three processing facilities, the Company is one of the fastest growing silver producers in

Mexico.

ON BEHALF OF THE BOARD OF DIRECTORS

"James Anderson"

Chairman and CEO

For further information regarding Guanajuato Silver Company Ltd., please contact:

JJ Jennex, Gerente de Comunicaciones, T: 604 723 1433

E: [email protected]

Gsilver.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward-Looking Statements

This news release contains certain forward-looking statements and information, which relate to future events or

future performance including, but not limited to, the current and projected mined output from the Company’s

existing El Cubo and El Pinguico mines and newly acquired San Ignacio, Valenciana and Topia mines, and GSilver’s

anticipated performance for the balance of 2022, the ability of the Company to continue to increase production,

tonnage and recoveries of mineralized material at El Cubo and El Pinguico in accordance with its objectives and

timetable and to mirror such performance at San Ignacio, Valenciana and Topia; the ability of the Company to

increase silver and gold grades, improve metallurgical recovery rates, increase revenues, and reduce production

costs (including AISC) consistent with the Company’s expectations and production model, the Company’s ability

to restart production from the San Ignacio and Valenciana mines and improve efficiency and output at the Topia

mine as currently planned and the timing thereof, the Company’s future development and production activities;

estimates of mineral resources and mineralized material at the Company’s mining projects and the accessibility,

attractiveness, mineral content and metallurgical characteristics thereof; the opportunities for future

exploration, development and production at the Company’s mines and th e proposed exploration, development

and production programs therefor and the timing and costs thereof; and the success related to any future

exploration, development and/or production programs.

Such f orward -looking statements and information reflect management's current beliefs and are based on

information currently available to and assumptions made by the Company; which assumptions, while considered

reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory

uncertainties and contingencies. These assumptions include: our mineral resource estimates at El Cubo and El

Pinguico and estimates of mineralized material at San Ignacio, Valenciana and Topia and the assumptions upon

which they are based, including geotechnical and metallurgical characteristics of rock conforming to sampled

results and metallurgical performance; available tonnage of mineralized material to be mined and processed;

resource grades and recoveries; assumptions and discount rates being appropriately applied to production

estimates; the ability of the Company to successfully integrate production from San Ignacio and Valenciana into

the Company’s existing mining and milling operations at El Cubo and the availability of excess processing and

4

tailings capacity at El Cubo to accommodate same; the Company’s ability to secure additional sources of

mineralized material for processing, prices for silver, gold and other metals remaining as estimated;

currency exchange rates remaining as estimated; availability of funds for the Company's projects and to satisfy

current liabilities and obligations including debt repayments; capital, decommissioning and reclamation

estimates; prices for energy inputs, labour, materials, supplies and services (including transportation) and

inflation rates remaining as estimated; no labour-related disruptions; no unplanned delays or interruptions in

scheduled construction and production; all necessary permits, licenses and regulatory approvals are received in

a timely manner; and the ability to comply with environmental, health and safety laws. The foregoing list

of assumptions is not exhaustive.

Readers are cautioned that such forward-looking statements and information are neither promises nor

guarantees, and are subject to risks and uncertainties that may cause future results, level of activity, production

levels, performance or achievements of GSilver to differ materially from those expected including, but not limited

to, market conditions, availability of financing, currency rate fluctuations, rising inflation and interest rates,

geopolitical conflicts including wars, actual results of exploration, development and production activities, actual

resource grades and recoveries of silver, gold and other metals, availability of third party mineralized material

for processing, unanticipated geological or structural formations and characteristics, environmental risks, future

prices of gold, silver and other metals, operating risks, accidents, labor issues, equipment or personnel delays,

delays in obtaining governmental or regulatory approvals and permits, inadequate insurance, and other risks in

the mining industry. There are no assurances that GSilver will be able to continue to increase production, tonnage

milled and recoveries rates, improve grades and reduce costs at El Cubo and/or Topia to process mineralized

materials to produce silver, gold and other concentrates in the amounts, grades, recoveries, costs and timetable

anticipated. In addition, GSilver’s d ecision to process mineralized material from El Cubo, El Pinguico and its newly

acquired San Ignacio, Valenciana and Topia mines is not based on a feasibility study of mineral reserves

demonstrating economic and technical viability and therefore is subject to increased uncertainty and risk of

failure, both economically and technically. Mineral r esources and mineralized material that are not Mineral

Reserves do not have demonstrated economic viability, are considered too speculative geologically to have the

economic considerations applied to them, and may be materially affected by environmental, permitting, legal,

title, socio-political, marketing, and other relevant issues. There are no assurances that the Company's projected

production of silver, gold and other metals will be realized. In addition, there are no assurances that the

Company will meet its production forecasts or generate the anticipated cash flows from operations to satisfy its

scheduled debt payments or other liabilities when due or meet financial covenants to which the Company is

subject or to fund its exploration programs and corporate initiatives as planned. There is also uncertainty about

the continued spread and severity of COVID-19, the ongoing war in Ukraine and rising inflation and interest rates

and the impact t hey will have on the Company's operations, supply chains, ability to access mining projects or

procure equipment, contractors and other personnel on a timely basis or at all and economic activity in general.

Accordingly, readers should not place undue reliance on forward-looking statements or information. All forward-

looking statements and information made in this news release are qualified by these cautionary statements and

those in our continuous disclosure filings available on SEDAR at www.sedar.com including the Company’s interim

financial statements and accompanying MD&A for the three month period ended June 30, 2022. These forward-

looking statements and information are made as of the date hereof and the Company does not assume any

obligation to update or revise them to reflect new events or circumstances save as required by law.