Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GSPR.V ·

GSP Drills 2.42% Copper, 47 gpt Silver, & 0.57 gpt Gold over 12.8 m, including 5.2% Copper, 103 gpt Silver & 1.22 gpt Gold over 5.7m, at Alwin Mine Copper-Silver-Gold Project

Drill Results

1 of 6

GSP Drills 2.42% Copper, 47 gpt Silver, & 0.57 gpt Gold over 12.8 m, including 5.2%

Copper, 103 gpt Silver & 1.22 gpt Gold over 5.7m, at Alwin Mine Copper-Silver-Gold Project

News Release - Vancouver, British Columbia February 7, 2024: GSP Resource Corp. (TSX-V:

GSPR) (the “Company” or “GSP”) reports assay results of the recently completed surface diamond

drill program at the Alwin Mine project (the “Alwin Property” ). All drill holes intersected Copper-

Gold-Silver mineralization at shallow depths, with hole AM23 -01 reporting some of the highest

grades of copper and precious metals drilled at Alwin in the project’s history.

Drillhole AM23-01 intersected 2.42% Cu, 47.0 gpt Ag, and 0.57 gpt Au over 12.8m including a

5.7m interval averaging 5.21% Cu, 103.1 gpt Ag and 1.22 gpt Au.

The result of this drilling demonstrates the high-grade potential for the Alwin project and reinforces

the polymetallic upside with significant gold and silver values. GSP’s data compilation exercise

completed in 2023 suggests that many of the historic drillholes in the pre -2008 exploration of the

property did not include assays for gold and silver.

The drill program, completed in November 2023, was designed to target high-grade copper zones at

the Alwin Property located in the Highland Valley Copper Camp of British Columbia. A total of 5

HQ-size diamond drill holes were completed totaling 640 metres (see the Company’s news release

dated November 22, 2023). Drilling was completed from three sites over a 100-metre strike length

targeting the upper and lower levels of the historic Alwin Mine “4 Zone” (Figure 1).

2 of 6

Figure 1. Alwin Mine 2023 Drill Plan

GSP’s President & CEO, Simon Dyakowski, commented:

“Our team is excited to announce the assay results of the recently completed 2023 drill

program. The primary objective of the 2023 drill program was achieved by successfully testing the

Alwin 3D copper mineralization vein model. The 3D model was developed for the high- grade past

producing Alwin Copper -Silver-Gold Mine using historic underground and surface drilling assay

results. The focus of the 2023 drill program was to evaluate the upper and lower extents of the

unmined historic 4 Zone and identify possible parallel or zone extensions.

The 2023 drill program has provided confirmation of multiple parallel intervals of sulphide

mineralization adjacent to the historic 4 Zone. These results provide us with an exciting exploration

upside potential at the Alwin project which requires further infill and exploration drilling. In addition

to the zones identified through the 2023 drilling, potential new copper mineralization zones

previously identified from compiled historic drill holes to the northwest, south and at depth of the

historic mine area remain untested and we intend to target these with additional drilling in 2024.”

All five 2023 drill holes intersected sulphide mineralization, with multiple intervals encountered in

drill holes AM-23-01, -02 and -03 targeting the historic 4 Zone at depth. Drill holes AM-23-04 and

-05 targeted the historic 4 Zone near surface (Table 1, Figures 2 and 3).

Mineralization appears structurally controlled comprising chalcopyrite, minor bornite and pyrite, and

associated varying intensity of sericitic, potassic, and chloritic alteration.

3 of 6

Table 1. Alwin 2023 Diamond Drilling Significant Assay Results

DDH From

(m) To (m)

Drilled

Interval*

(m)

Cu % Ag g/t Au g/t CuEQ**

%

AM-23-01 138.0 150.8 12.8 2.42 47.0 0.57 2.64

including 141.6 147.3 5.7 5.21 103.1 1.22 5.69

including 141.9 143.8 1.9 7.84 198.3 2.75 8.85

and 153.4 154.6 1.1 3.48 13.0 0.04 3.52

AM-23-02 118.2 118.8 0.6 8.01 30.0 0.05 8.09

and 134.6 140.7 6.1 0.88 3.9 0.06 0.90

including 135.1 138.6 3.5 2.40 9.7 0.18 2.46

AM-23-03 108.6 109.4 0.8 1.06 7.7 0.03 1.08

and 160.4 166.1 5.7 3.77 16.5 0.05 3.82

and 166.9 167.3 0.4 3.85 11.0 0.06 3.89

AM-23-04 33.0 33.8 0.8 0.84 4.5 0.02 0.85

AM-23-05 28.0 38.6 10.6 1.15 4.0 0.04 1.17

including 33.8 37.0 3.2 3.50 10.3 0.07 3.54

*True width estimate is 60% of Drilled Interval presented here.

**CuEQ % = [Cu (%) x 1] + [Ag (g/t) x 0.002465] + [Au (g/t) x 0.1888]

(using $US8,800/tonne Cu, $US23/oz Ag. $US1,850/oz Au and historic

recoveries 95.1% Cu, 89.7% Ag, 85.4% Au)

Figure 2. Drill Section showing AM-23-01, and -02

4 of 6

Figure 3. Drill Section showing AM-23-03, -04 and -05

About the Alwin Mine Project: The Alwin Mine Copper -Silver-Gold property is approximately

575.72 hectares and is located on the semi -arid, interior plateau in south -central British Columbia.

The historic underground mine was developed over 500 m long by 200 m wide by 300 m deep.

Production took place between 1916 to 1981 from five major subvertical high- grade copper

mineralization zones totaling 233,100 tonnes that milled 3,786 tonnes of copper, 2,729 kilograms of

silver and 46.2 kilograms of gold. The average diluted head grade was 1.5% copper.

The Alwin Property is adjacent with the western boundary of Teck Corporation’s Highland Valley

Mine, the largest open -pit porphyry copper -molybdenum mine in western Canada. Alteration and

mineralization of the Highland Valley hydrothermal system extends w estward from the Highland

Valley mine onto the Alwin property (see GSP’s news release dated January 30, 2020).

5 of 6

Methodology and QA/QC

The analytical work reported on herein was performed by ALS Global (“ALS”), Vancouver, Canada.

ALS is an ISO -IEC 17025:2017 and ISO 9001:2015 accredited geoanalytical laboratory and is

independent of GSP Resource Corp. and the QP. Drill core samples were s ubject to crushing at a

minimum of 70% passing 2 mm, followed by pulverizing of a 250- gram split to 85% passing 75

microns. Base and precious metals were determined via four -acid digestion 33 element ICP -AES

geochemistry and overlimit values for copper (>1%) and silver (100 g/t) were analyzed via four-acid

digestion ICP-AES or AAS.

GSP Resource Corp. follows industry standard procedures for the work carried out on the Alwin

Mine Project, with a quality assurance/quality control (QA/QC) program. Blank, duplicate, and

standard samples were inserted into the sample sequence sent to the laboratory for analysis. GSP

Resource Corp. detected no significant QA/QC issues during review of the data. GSP Resource Corp.

is not aware of any drilling, sampling, recovery, or other factors that could materially affect the

accuracy or reliability of the data referred to herein.

Qualified Person: The scientific and technical information contained in this news release has been

reviewed and approved by Kristopher J. Raffle, P.Geo. (B.C.), principal and consultant of APEX

Geoscience Ltd. of Edmonton, AB, a consultant to the Company and a “qualified person” as defined

in National Instrument 43- 101 — Standards of Disclosure for Mineral Projects . Mr. Raffle has

verified the data disclosed, which includes a review of the sampling, analytical and test data

underlying the information and opinions contained herein. Mineralization hosted on nearby

properties is not necessarily indicative of mineralization that may be hosted on the Alwin property.

About GSP Resource Corp.: GSP Resource Corp. is a mineral exploration & development company

focused on projects located in Southwestern British Columbia. The Company has an option to

acquire a 100% interest and title to the Alwin Mine Copper -Gold-Silver Property in the Kamloops

Mining Division, as well as an option to acquire 100% interest and title to the Olivine Mountain

Property in the Similkameen Mining Division, of which it has granted an option to earn a 60% interest

to a third party.

Contact Information - For more information, please contact:

Simon Dyakowski, Chief Executive Officer & Director

Tel: (604) 619-7469

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

This news release contains “forward‐looking information or statements” within the meaning of applicable securities laws,

which may include, without limitation, potential further drilling at the Alwin Property and potential drill targets, future

exploration work on the Company’s projects, other statements relating to the technical, financial and business prospects

of the Company, its projects and other matters . All statements in this news release, other than statements of historical

facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although

6 of 6

the Company believes the expectations expressed in such forward -looking statements are based on reasonable

assumptions, such statements are not guarantees of future performance and actual results may differ materially from those

in the forward -looking statements. Such statements and information are based on numerous assumptions regarding

present and future business strategies and the environment in which the Company will operate in the future, including

the price of metals, the ability to achieve its goals, that general business and economic conditions will not change in a

material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-

looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties and

assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the

inherent uncertainty of exploration and cost estimates and the potential for une xpected costs and expenses, and those

filed under the Company’s profile on SEDAR+ at www.sedarplus.ca. Factors that could cause actual results to differ

materially from those in forward looking statements include, but are not limited to, continued availability of capital and

financing and general economic, market or business conditions, adverse weather and climate conditions, failure to

maintain or obtain all necessary government permits, approvals and authorizations, failure to maintain or obtain

community acceptance (including First Nations), decrease in the price of copper, gold, silver and other metals, increase

in costs, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake

to update forward‐looking statements or forward‐looking information, except as required by law.