Operational Update for the Barsele Au-VMS Project Conversion Drill Hole SKI16010 Adds Continuity to Skiråsen Zone with 6.00 meters grading 33.46 g/t gold, plus 178.00 meters grading 1.68 g/t gold. Expansion drill hole CNT16017 yields 31.00 meters grading 2.65 g/t gold.
January 17, 2017
Operational Update for the Barsele Au-VMS Project
Conversion Drill Hole SKI16010 Adds Continuity to Skiråsen Zone
with 6.00 meters grading 33.46 g/t gold, plus 178.00 meters grading 1.68 g/t gold.
Expansion drill hole CNT16017 yields 31.00 meters grading 2.65 g/t gold.
Vancouver, BC – Barsele Minerals Corp. – (TSX-V: BME) (“Barsele”) is pleased to report an eighth
operational progress update for the current exploration program within the Barsele Au-VMS Project
area in Västerbottens Län, northern Sweden. The exploration program is being operated by joint
venture partner Agnico Eagle Mines Limited – (TSX, NYSE: AEM) (“Agnico Eagle”). Ownership in the
project is 55% Agnico Eagle and 45% Barsele.
During the month of November, diamond drilling with four machines were focused within and along the
trend of the Avan, Central and Skiråsen zones, where validation, conversion and expansion drilling has
taken place. The highlight conversion hole SKI16010 yielded 6.00 meters core length (estimated 4.0
meters true thickness) grading 33.46 g/t gold uncut (6.33 g/t gold cut) at a depth of 180 meters below
surface, plus 178.00 meters core length (estimated 125.00 meters true thickness) grading 1.68 g/t gold
uncut (1.51 g/t gold cut) at a midpoint depth of 320 meters below surface. In addition, expansion hole
CNT16017 yielded 31.00 meters core length (estimated 23.30 meters true thickness) grading 2.65 g/t
gold uncut (2.60 g/t gold cut) at a midpoint of 410 meters below surface. This last intercept expands the
known Central Zone by 175 meters towards the Avan Zone.
Twelve holes were completed during the month of November of which five were validation holes and
seven were conversion holes that verify continuity of mineralization. During November, 4,935 meters
was drilled, for a cumulative 2016 total of 30,432 meters in 79 holes. During November, there were
6,218 samples sent for analysis, with 8,014 assay results received. Basal till sampling results are yet to be
received.
Barsele’s President, Gary Cope states, “We continue to receive positive results in validation, conversion
and expansion drilling at Barsele and we remain confident in Agnico Eagle’s deposit development
methodology. The 178-meter hole in the Skiråsen Zone is very supportive of continuity in this sector of
the deposit.”
Highlight Results from the November 2016 Reporting Period
Hole Category From
(m)
To
(m)
Core
Length
(m)
True
Thickness
(m)
Au
(g/t)
Top-
Capped
at 20 g/t
Au (g/t)
AVA16012 Expansion 202.00 213.00 11.00 8.30 2.80 2.62
AVA16013 Expansion 174.00 186.00 12.00 9.00 2.38
AVA16014 Expansion 604.00 612.00 8.00 5.00 2.03
AVA16015 Validation 117.00 131.00 14.00 7.50 1.46
AVA16016 Validation 18.00 30.00 12.00 7.00 1.46
AVA16017 Validation 135.00 160.80 25.80 18.50 1.33
AVA16018 Validation 200.00 207.00 7.00 5.00 1.63
CNT16014 Validation 20.00 40.00 20.00 15.00 4.93 2.35
67.00 107.00 40.00 30.00 3.94 3.13
142.10 169.00 26.90 20.20 1.02
217.00 240.00 23.00 17.30 1.15
CNT16015 Validation 29.00 47.00 18.00 12.00 1.70
58.00 67.00 9.00 6.00 2.13
83.00 99.00 16.00 10.50 1.35
124.00 148.00 24.00 21.00 1.32
169.00 174.00 5.00 3.80 2.94
191.00 238.00 47.00 31.00 1.55
257.00 291.00 34.00 21.00 2.76
CNT16017 Expansion 61.70 71.00 9.30 7.00 0.95
388.00 395.70 7.70 5.80 1.92
432.00 463.00 31.00 23.30 2.65 2.60
483.00 492.00 9.00 6.80 0.90
CNT16019 Validation 10.00 21.00 11.00 8.30 4.26
65.00 77.00 12.00 9.00 1.48
88.00 100.00 12.00 9.00 1.27
113.00 144.00 31.00 23.30 1.75
154.00 158.00 4.00 3.00 3.22
CNT16020 Validation 11.00 29.00 18.00 13.50 1.83
98.00 107.00 9.00 6.80 1.11
CNT16021 Validation 3.50 16.00 12.50 9.40 0.56
73.00 83.00 10.00 7.50 0.89
CNT16022 Validation 21.00 76.00 55.00 43.00 1.22
95.00 102.00 7.00 5.50 1.97
CNT16024 Expansion 495.00 508.00 13.00 6.50 1.75
526.00 541.00 15.00 7.50 1.10
CNT16025 Expansion 375.00 390.00 15.00 5.00 1.41
493.00 517.00 24.00 8.50 3.61 1.65
543.00 578.00 35.00 16.00 0.94
CNT16026 Conversion 394.00 434.00 40.00 22.00 1.41
480.00 504.00 24.00 13.00 0.89
631.00 639.00 8.00 4.50 2.41
SKI16008 Conversion 361.00 471.00 110.00 69.00 1.82 1.66
Incl. 361.00 403.00 42.00 26.00 2.32 1.89
Incl. 415.00 458.00 43.00 27.00 2.16
SKI16009 Conversion 303.00 317.00 14.00 8.50 0.94
419.00 436.00 17.00 10.50 1.22
SKI16010 Conversion 243.00 249.00 6.00 4.00 33.46 6.33
285.00 290.00 5.00 3.50 13.29 6.05
350.00 528.00 178.00 125.00 1.68 1.51
Incl. 420.00 428.00 8.00 5.50 9.55 5.65
Incl. 513.00 528.00 15.0 11.00 4.80
625.00 627.00 2.00 1.50 8.00
SKI16011 Conversion 59.00 66.00 7.00 5.00 1.76
109.00 119.00 10.00 7.50 3.68 2.99
192.00 211.00 19.00 14.30 6.42 1.34
347.00 352.00 5.00 3.80 3.04
423.00 425.00 2.00 1.50 8.58
SKI16012 Conversion 248.00 263.00 15.00 7.50 2.69
386.00 413.00 27.00 14.00 3.11 3.01
494.00 525.00 31.00 16.00 0.99
534.00 560.00 26.00 14.00 5.01 2.49
652.00 659.00 7.00 3.80 3.56
Drilling continued until December 21, 2016, at which time there was a break until planned resumption in
the new year.
As project operator, Agnico Eagle has developed a community relations program to engage the various
stakeholders in the project area. Basic environmental assessment and surface water characterization,
species studies and hydrogeology studies are ongoing. Barsele expects that Agnico Eagle will release a
new mineral resource estimate for the Avan, Central, Skiråsen and Norra deposits in mid-February 2017.
About the Barsele Gold Project
The Barsele Project is located on the western end of the Proterozoic “Skellefte Trend”, a prolific
volcanogenic massive sulphide deposits belt, where it intersects with the “Gold Line” in Northern
Sweden. Both polymetallic deposits and intrusive hosted orogenic gold deposits are present in this
region and on the property. Current and past producers in the region include Boliden, Kristineberg,
Bjorkdal, Svartliden and Storliden.
On September 25, 2015, mineral resource estimates by Barsele were released for the Barsele Project in
four zones, the Central, Avan and Skiråsen Gold Zones and the Norra VMS Zone. The resource estimate
for the Central-Avan-Skiråsen Zones states an Indicated Resource of 14.1 million tonnes grading 1.21 g/t
gold for 547,000 contained ounces, plus an Inferred Resource of 20.2 million tonnes grading 0.97 g/t
gold for 627,000 contained ounces. The polymetallic Norra Zone contains an Indicated Resource of
110,000 tonnes grading 3.13 g/t gold, 30.3 g/t silver, 0.53 % copper and 0.72 % zinc, plus an Inferred
Resource of 310,000 tonnes grading 1.62 g/t gold, 12.7 g/t silver, 0.26 % copper and 0.42 % zinc. All
zones were estimated at a gold cut-off grade of 0.6 g/t.
Art Freeze, P.Geo. is the Qualified Person as defined in NI 43-101 and takes responsibility for the
technical disclosure contained within this news release.
About Barsele Minerals Corp.
Barsele is a Canadian-based junior exploration company comprised of highly qualified mining
professionals. Barsele’s main property is the Barsele Gold Project in Västerbottens Län, Sweden, a joint
venture with Agnico Eagle Mines Limited.
ON BEHALF OF THE BOARD OF DIRECTORS
Gary Cope
President
For further information, please contact Barsele Minerals Corp. at (604) 687-8566 x227,
email [email protected] or visit our website at www.barseleminerals.com
This News Release may contain forward-looking statements including but not limited to comments regarding the
timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential
mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore
involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in
such statements and Barsele undertakes no obligation to update such statements, except as required by law.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this release