Saturday, September 19, 2026
MiningNewsTerminal
Saturday, September 19, 2026 Admin

GSKR.V ·

First Nordic Announces Start of Top-of- Bedrock Drilling Program on Harpsund and Brokojan Targets in Sweden TORONTO ,

Exploration Programs

First Nordic Announces Start of Top-of-

Bedrock Drilling Program on Harpsund and

Brokojan Targets in Sweden

TORONTO

,

Feb. 3, 2025

/CNW/ -

First Nordic Metals Corp.

(the

"Company"

or

"FNM"

) (TSXV:

FNM) (OTCQB: FNMCF) (FRA: HEG0) is pleased to announce the commencement of a top-of-

bedrock (i.e. base-of-till ("BoT")) drilling program on the Harpsund and Brokojan targets located in

its 100%-owned Paubäcken project ("Paubacken" or the "Project") area of the Gold Line belt,

northern

Sweden

.

Taj Singh

, CEO remarks:

The multi-kilometric Brokojan target was identified last year from the

Paubӓcken project gold pathfinder till sampling program. When Brokojan was combined with the

previously identified and adjacent Harpsund anomaly, a 5.5 km long target area (strike) emerged.

To put this in context, the Company's Barsele project resource footprint length is approximately 3.5

km. Also noteworthy is that the Company's ~4 km Aida target, at the Paubӓcken project and slated

to start diamond drilling in a few weeks, is only few km south of the Harpsund-Brokojan target

area. Our top-of-bedrock ("BoT") drilling at Harpsund and Brokojan will provide us key

geochemical information (gold and pathfinder assays of bedrock) for these targets, setting them up

for diamond drilling later this year. BoT drilling has been a critical step for mineral deposit

discovery and delineation in the Nordics and has a strong correlation with diamond drilling

results."

2025 Harpsund / Brokojan Target Top-of-Bedrock Drilling Program

The program is designed to investigate bedrock sources of the on-trend Brokojan and Harpsund

anomalies ("targets") that occur along the second order Harpsund structural corridor. The targets

consist of two semi-contiguous anomalies over a +5 kilometre by up to 1 kilometer ("km") wide gold,

arsenic, copper and zinc (Au, As, Cu and Zn) glacial till anomaly oriented in the prominent ice flow

direction. The program will include up to 180 BoT drill holes and is designed to systematically test

the bedrock along the 5 km zone interpreted to be the most probable source of the till anomaly

based on interpretation of geophysical data and ice flow direction (see Figure 1). Analysis of historic

airborne magnetic geophysical data identified a second order structural corridor that is coincident to

the gold and pathfinder anomaly that will be targeted in the drilling campaign.

BoT drilling is an efficient exploration technique in glaciated terrains that provides high-quality

geological data and allows direct analysis of underlying bedrock lithologies which have the potential

to host mineral deposits. This technique reduces costs compared with conventional reverse

circulation (RC) or diamond drilling, has a small environmental footprint, and increases the probability

of identifying potential mineral deposits. It is a critical step in the exploration workflow when

exploring under shallow glacial cover, bridging surface surveys and deeper, more targeted drilling

programs.

Figure 1: Harpsund and Brokojan targets top-of-bedrock drilling plan and glacial till anomalies. (CNW

Group/First Nordic Metals Corp.)

About the Harpsund and Brokojan Targets

The Harpsund and Brokojan targets are located in the Paubäcken Project area of the Gold Line belt

in northern

Sweden

. Both target areas are located on a northwest trending second order splay

structure off the main regional Gold Line belt structure. The Brokojan target is located at the

intersection of first and second order structures, and the Harpsund target within a large flexure

and/or fold hinge along the structure. The geology consists of a sequence of inverted basin

sediments and mafic volcanic rocks intruded by small syn-kinematic granitic intrusions within a broad,

anastomosing high strain structural corridor. These lithological sequences are highly prospective for

orogenic gold deposits.

About the Paubäcken Project

The Paubäcken project consists of three licenses totalling 17,097 ha that cover the central part of an

emerging district in north central

Sweden

known as the "Gold Line belt". The Gold Line belt is host to

several significant gold deposits, including the Company's nearby Barsele project, as well as the

Svartliden mine and Fäboliden development project, both operated by Dragon Mining Ltd. The

Svartliden mine was in production from 2005 to 2015 and a total of 3.18 million tonnes of material

grading 4.1 g/t Au was processed during its operation (

http://www.dragonmining.com/svartliden

).

Paubäcken is strategically positioned between Barsele and Fäboliden, is a few hundred meters

northeast of the Svartliden mine, and features a regional shear zone with multiple untested gold

anomalies.

About the Gold Line Belt Geology

The geology of the Gold Line belt consists of an inverted volcano-sedimentary sequence intruded by

small pre- to syn-kinematic granitic intrusions within a broad, anastomosing high strain structural

corridor. Lithologies are regionally metamorphosed to upper greenschist and amphibolite grade

facies, and gold mineralization is associated with intense sericite, carbonate, biotite, and calc-silicate

alteration assemblages and sulphide minerals pyrite, arsenopyrite, and pyrrhotite. The regional Gold

Line structural corridor runs up the axis of the belt with many jogs, splays, and zones of structural

complexity that are potential locations for dilation and deposition of gold bearing fluids. These

lithological sequences are deemed to be highly prospective for orogenic gold deposits.

About First Nordic Metals

First Nordic Metals Corp. (FNM) is a Canadian-based gold exploration company, consolidating

assets in

Sweden

and

Finland

, with a vision to create

Europe's

next gold camp. The Company's

flagship asset is the Barsele Gold Project in northern

Sweden

, a joint venture project with senior

gold producer Agnico Eagle Mines Limited. Immediately surrounding the Barsele project, FNM is

100%-owner of a district-scale license position comprised of three additional projects (Paubäcken,

Storjuktan, Klippen), which, combined with the Barsele Project, total 104,000 hectares on the Gold

Line belt. Additionally, in northern

Finland

, FNM is the 100%-owner of a district-scale position

covering the entire underexplored Oijärvi Greenstone belt, including the Kylmäkangas deposit, the

largest known gold occurrence on this belt.

ON BEHALF OF THE BOARD OF DIRECTORS

Taj Singh

, M.Eng, P.Eng, CPA

CEO & Director

Qualified Person

Benjamin Gelber

, P. Geo., Chief Technical Director of FNM, is the Qualified Person as defined in NI

43-101 and takes responsibility for the technical disclosure contained within this news release.

Follow First Nordic Metals:

Twitter: @fnmetals | Youtube: @firstnordicmetalscorp | LinkedIn: @firstnordicmetals

Facebook: @FirstNordicMetals | Instagram: @firstnordicmetals

Forward-Cautionary Note Regarding Forward-Looking Statements:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

This News Release contains forward-looking statements, including but not limited to comments

regarding the timing and content of upcoming work programs, geological interpretations, receipt of

property titles, potential mineral recovery processes, etc. Forward-looking statements address

future events and conditions and therefore involve inherent risks and uncertainties. Actual results

may differ materially from those currently anticipated in such statements and FNM undertakes no

obligation to update such statements, except as required by law.

SOURCE

First Nordic Metals Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/February2025/03/c2421.html

%SEDAR: 00037711E

For further information:

For further information contact: Alicia Ford, Director, Corporate

Development, Phone: 403-604-9646, Email: [email protected]

CO: First Nordic Metals Corp.

CNW 04:00e 03-FEB-25