Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GSKR.V ·

A Belcarra Group Company Barsele Announces Plans for Resumption of Diamond Drilling Activities in 2023 Coring to be initiated late May or early June

Exploration Programs

A Belcarra Group Company

Barsele Announces Plans for Resumption of Diamond Drilling

Activities in 2023

Coring to be initiated late May or early June

• Diamond drilling is budgeted for 3,000 metres (approximately 15 holes) and will test

for Intrusive-hosted “Orogenic Gold” and Volcanogenic Massive Sulphides.

• Drilling will commence near the Risberget Zone and will test Orogenic Gold targets in

the vicinity of previously intersected gold mineralization, along the southeasterly

extension of the 3.6-kilometre Avan–Central–Skiråsen gold trend.

• The Avan Zone, where high gold grades have been locally encountered, is the second

principal target where drill testing will take place.

• Additionally, drill testing for Volcanogenic Massive Sulphide mineralization will take

place along the southeastward extension from the Norra VMS Deposit.

May 3 , 2023 : Vancouver, BC, Barsele Minerals Corp. ( TSX.V: BME) (the “ Company” or “ Barsele”) is pleased to

provide an update regarding ongoing exploration activities within the Barsele Gold -VMS Project area in

Västerbottens Län, Northern Sweden (the “ Barsele Project”). The exploration program is being operated by joint

venture partner Agnico Eagle Mines Limited – (TSX, NYSE: AEM) (“Agnico Eagle”). Ownership in the Barsele Project

is 55% Agnico Eagle and 45% Barsele. Agnico Eagle can earn an additional 15% in the Barsele Project through the

completion of a pre -feasibility study. There is no cash outlay requirement by Barsele until a pre -feasibility study is

completed.

Between January 1 and April 30, 2023, data analysis, along with field- specific exploration activities continued at a

number of exploration sites throughout the property. Work has included geophysical surveys, base of till sampling

and analysis, plus analysis of previously collected MEFFA (multi-element fine fraction analysis) samples. The MEFFA

sample interpretation utilizes automated pXRF scanning, together with laser ablation and ICP -MS, to define

precious/base metal anomalous areas. All this work has been carried out in preparation for this year’s diamond

drilling campaign.

Structural, stratigraphic and lithological observations continue to evolve, with the objective to define both precious

and base metals trends and targets. Studies related to gold occurrences associated with certain elements, minerals

and alteration phases have been on-going to support targeting.

Diamond drilling since 2015, within the 34,533- hectare property totals 162,691 metres of overburden penetration

and core c ollection from a total of 436 drill holes. One drill rig has been retained to carry out the 2023 diamond

drilling campaign.

To view the drilling target location map, please refer to: https://barseleminerals.com/project/photos/

Barsele’s President, Gary Cope states; “The ongoing detailed surface mapping, sampling and geophysical surveys

have outlined a number of exciting targets for both gold and massive sulphide mineralization. I am optimistic there

will be assay results that will satisfy our shareholders.”

Barsele Announces Plans for Resumption of Diamond Drilling Activities in 2023

May 3, 2023

Page 2

About the Barsele Gold Project

The Barsele Project is located on the western end of the Proterozoic “Skellefte Trend”, a pro lific volcanogenic

massive sulphide deposits belt, that intersects with the “Gold Line” in Northern Sweden. Both polymetallic “VMS”

deposits and intrusive hosted “Orogenic gold” deposits are present in this region and on this property. Current and

past producers in the region include Boliden, Kristineberg, Bjorkdal, Svartliden and Storliden.

On February 21, 2019 (the effective date), Barsele released an independently verified Mineral Resource Estimate

that was completed by Quebec -based InnovExplo Inc., for the purposes of the Company. This NI 43 -101 Technical

Report and Mineral Resource Estimate (Amended) for the Barsele Property was modified and resubmitted effective

December 16, 2020. The Amended Technical Report contains no material differences to the original technical report

filed on April 2, 2019.

The study concluded that drilling to the end of 2018 along the Avan –Central–Skiråsen gold zones at a 0.50 g/t gold

cut-off for a pit constrained extraction mining method, a 1.50 g/t gold cut -off for a bulk und erground extraction

mining method, and a 1.80 g/t cut -off for a selective underground extraction mining method, has in combination,

outlined an Inferred Mineral Resource of 25,495,000 tonnes grading 2.54 g/t gold (2,086,000 ounces of contained

gold) and an Indicated Mineral Resource of 5,578,000 tonnes grading 1.81 g/t gold (324,000 ounces of contained

gold).

The main gold-bearing system remains open in all directions. The structurally linked gold mineralized “lodes” occur

mainly within a granodiorite host and to a lesser extent, volcanic and sedimentary rocks. Multiple parallel to sub -

parallel “lodes” that vary in width from 10 metres to 100 metres, combine for a maximum known thickness (including

low grade -waste islands) of 425 metres. The Avan –Central–Skiråsen zones have a strike length approaching 3.6

kilometres and that same northwest trending structural corridor contains localized bodies with gold mineralization

over an additional 4.4 kilometres. The drill tested depth of the mineralized system approaches 1.0 kilometre and

remains open. Gold is generally associated with arsenopyrite and low base metal content and also occurs as native

metal.

Art Freeze, P.Geo. is the Qualified Person as defined in NI 43-101 and takes responsibility for the technical disclosure

contained within this news release.

About Barsele Minerals Corp.

Barsele is a Canadian -based junior exploration company managed by the Belcarra Group, comprised of highly

qualified mining professionals. Barsele’s main property is the Barsele Gold Project in Västerbottens Län, Sweden, a

joint venture with Agnico Eagle.

A NI 43-101 Technical Report on the Barsele Project with an effective date of February 21, 2019, was filed on SEDAR

on April 2, 2019. This NI 43-101 Technical Report and Mineral Resource Estimate (Amended) for the Barsele Property

was modified and filed on SEDAR on December 16, 2020.

ON BEHALF OF THE BOARD OF DIRECTORS

Gary Cope

President

For further information, please contact Barsele Minerals Corp. at 604-687-8566, email [email protected]

or visit our website at www.barseleminerals.com.

This News Release contains forward-looking statements, including but not limited to comments regarding the timing

and content of upcoming work programs, geological interpretations, recei pt of property titles, potential mineral

recovery processes, etc. Forward -looking statements address future events and conditions and therefore involve

inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such

statements and Barsele undertakes no obligation to update such statements, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.