Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GRZ.V ·

News release

Corporate Updates

GO

SPOKAN

Gold Rese

provide an

project (o

Minera an

Assessme

early Nov

copper an

101 repor

the smalle

selection a

nearing co

Internatio

World Ba

to comme

managem

now estab

As part of

received t

Popular p

Occupy.

when issu

Mining A

metallic m

allow the

tailing dam

The Comp

pursuant t

Doug Bel

first perm

Further in

and www

OLD RES

NE, WASHI

erve Inc. (TSX

n update on a

wned 45% by

nd its technica

ent (“PEA”) in

vember. This s

nd silver produ

rt will detail th

er fast track 1

and prelimina

ompletion. S

nal Environm

ank’s Equator

ence in early i

ment wells, and

blished local m

f the developm

two important

ara Ecosocial

This permit a

ued will allow

Authority, Inst

mineral conce

mining of ag

m and the pro

pany is also p

to the Settlem

anger, Presid

mits is a big ste

nformation reg

.sedar.com.

ERVE PR

INGTON, O

X.V: GRZ) (O

activities in V

y the Compan

al consultants

n accordance

study will inc

uction, estima

he large 140,0

5,000 tonnes

ary design wo

iembra Miner

mental and So

Principles. P

in 2018 that w

d test areas w

management o

ment process,

t permits to a

lismo y Agua

allows Siembr

w early works

tituto Autónom

ession for the

gregate neede

oduction of co

pleased to ann

ment Agreeme

dent, stated, “T

ep forward in

garding the C

ROVIDES

October 13, 2

OTCQX: GD

enezuela with

ny and 55% b

s are currently

with Nationa

clude an up to

ated capital an

000 tonnes pe

per day sapro

ork are compl

ra has also be

cial Impact S

Proposals are c

will support th

where addition

offices in Car

, the Compan

dvance the m

as (“MINEA”

ra Minera to p

construction

mo Minas Bo

development

ed for roads, a

oncrete for ov

nounce that it

ent.

The progress

n the developm

Company can

OCTOBE

2017

DRZF) (“Gold

h respect to th

y the Bolivar

y working to c

al Instrument

o date resourc

nd operating

er day Siembr

olite project.

lete with preli

een working w

Statement whi

currently bein

he overall pro

nal resource p

racas and Pue

ny also reports

mining project

- Ministry of

proceed to fil

activities. To

olívar (“IAMI

of an aggreg

airstrip, initia

verall constru

has received

on the projec

ment of the pr

be located at

ER VENE

d Reserve” or

he Siembra M

rian Republic

complete a Pr

43-101, whic

ce estimate, a

costs, and ov

ra Minera pro

The saprolite

iminary engin

with its enviro

ich will be pre

ng evaluated

oject developm

potential is evi

erto Ordaz.

s that the Siem

ts. Recently, t

f the Environm

le its request f

o support the e

IB”) has appr

gate quarry fo

al rock base fo

ction of the p

the October p

ct continues an

roject in a tim

www.goldres

EZUELA U

the “Compan

Minera gold/co

of Venezuela

reliminary Ec

ch is expected

mine plan inc

verall project s

oject and will

e project tailin

neering of the

onmental con

epared in acc

for a drilling

ment activitie

ident. Siembr

mbra Minera

the Ministerio

ment) issued

for the Permit

early works, t

oved the issu

r the project.

or the constru

projects.

payment of U

nd the promp

mely fashion.”

serveinc.com

NR-

UPDATE

ny”) is please

opper/silver

a). Siembra

conomic

d to be finaliz

cluding gold,

schedule. The

now also inc

ngs dam site

e saprolite pla

nsultants on th

cordance with

program exp

es, water

ra Minera has

project has

o del Poder

the Permit to

t to Affect wh

the Bolivar S

uance of a non

This permit w

uction of the

US$29.5 milli

pt receipt of th

”

m, www.sec.go

17-14 

ed to

zed in

e 43-

clude

ant

he

h the

ected

s also

o

hich

tate

n-

will

ion

he

ov,

Gold Reserve Inc. Contact

A. Douglas Belanger, President

999 W. Riverside Avenue, Suite 401

Spokane, WA 9920I USA

Tel. (509) 623-1500

Fax (509) 623-1634

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS

This release contains “forward-looking statements” within the meaning of applicable U.S. federal

securities laws and “forward-looking information” within the meaning of applicable Canadian

provincial and territorial securities laws and state Gold Reserve’s and its management’s intentions,

hopes, beliefs, expectations or predictions for the future including without limitation statements with

respect to the development of the Siembra Minera project, including the preparation of a PEA for the

project . Forward-looking statements are necessarily based upon a number of estimates and

assumptions that, while considered reasonable by management at this time, are inherently subject to

significant business, economic and competitive uncertainties and contingencies.

We caution that such forward-looking statements involve known and unknown risks, uncertainties

and other risks that may cause the actual outcomes, financial results, performance, or achievements

of Gold Reserve to be materially different from our estimated outcomes, future results, performance,

or achievements expressed or implied by those forward-looking statements, including without

limitation the risk that a PEA for the Siembra Minera project will not be completed within the time

frames anticipated, the risk that the development of the Siembra Minera project may not proceed as

anticipated and the risk that the Company may not be able to repatriate funds received under the

Settlement Agreement. This list is not exhaustive of the factors that may affect any of Gold Reserve’s

forward-looking statements. Investors are cautioned not to put undue reliance on forward-looking

statements. All subsequent written and oral forward-looking statements attributable to Gold Reserve

or persons acting on its behalf are expressly qualified in their entirety by this notice. Gold Reserve

disclaims any intent or obligation to update publicly or otherwise revise any forward-looking

statements or the foregoing list of assumptions or factors, whether as a result of new information,

future events or otherwise, subject to its disclosure obligations under applicable rules promulgated

by the Securities and Exchange Commission and applicable Canadian provincial and territorial

securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.