Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GRSL.V ·

GR Silver Mining Underground Drilling at San Marcial Continues to Deliver Wide and High- grade Silver Intercepts, Confirming Potential for Resource Expansion

Exploration Programs

GR Silver Mining Underground Drilling at San

Marcial Continues to Deliver Wide and High-

grade Silver Intercepts, Confirming Potential

for Resource Expansion

VANCOUVER, BC

,

April 6, 2022

/CNW/ -

GR Silver Mining Ltd. ("GR Silver Mining"

or the

"Company")

(TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to confirm the

extension of wide high-grade silver (Ag) mineralization from underground drilling in the San Marcial

Area, at the Plomosas Project,

Sinaloa, Mexico

. These assay results are from three underground

drill holes completed in 2021 and reinforce the widening of the mineral body at depth and along

strike, supporting potential resource expansion. The successful eight-hole underground drill program

confirmed a significant expansion of high-grade Ag mineralization approximately

300 m

down dip

below the lower limit of the pit-constrained San Marcial NI 43-101 (2019) mineral resource. High-

grade drill hole SMI21-07 indicates extension of the Ag mineralization by almost

100 m

down dip

below previously released drill hole SMI21-04 (Figures 1 and 2) (see

News Release dated

January 31, 2022

).

Highlights:

Ag and Au results from San Marcial

include:

SMI21-07:

0.4 m

at 1,413 g/t Ag within

7.4 m

at 201 g/t Ag, and

4.8 m at 223 g/t Ag within

17.0 m

at 124 g/t Ag

SMI21-06:

19.3 m

at 40 g/t Ag

SMI21-05:

1.1 m

at 5.32 g/t Au

The 2021 underground drilling program has confirmed

wide and high-grade Ag

mineralization below the

San Marcial NI 43-101 mineral resource, providing justification

for another resource expansion drilling program in 2022.

The results confirm the predominance of silver, with subordinate base metals, within the

San Marcial breccia-hosted mineralized zone.

Results from the final hole in the eight-hole,

2,436 m

, 2021 underground drill program

are pending.

The 2022 San Marcial surface and underground resource expansion drill program is

underway with three drill rigs on site. The program is targeting additional extensions to

the SE of the current NI 43-101 mineral resource, as well as down plunge from wide,

high-grade silver mineralization intersected in drill holes SMI21-04 and SMI21-07 (Figure

1).

GR Silver Mining Chairman and CEO,

Eric Zaunscherb

commented

"The combination of

contemporary and extensive historical data has allowed GR Silver's geologists to formulate a

modern exploration model focused on high-grade silver and gold mineralization. These results

continue to encourage us to explore San Marcial at depth and to the SE. With the recently

completed financing, the Company is fully financed to extend its sophisticated approach, including

as much as

10,000m

of drilling, seeking to extend San Marcial and further surgical infill drilling at

the former Plomosas Mine Area. We are extremely proud of the exploration platform that has been

assembled to advance the overall Plomosas Project, especially our talented Mexican geological

team, as well as the strong community relationships that have been nurtured."

Figure 1: Longitudinal section displaying “Ag Grade x Thickness” contours of the San Marcial NI 43-

101 resource model and new extensions to the mineralized body, down dip and along strike (CNW

Group/GR Silver Mining Ltd.)

The following table (Table 1) summarizes the most important results of the three drill holes

presented in this News Release. There is one hole pending results from the 2021 underground

drilling program.

Table 1: San Marcial Drill Results

Drill Hole

From

(m)

To (m)

Apparent

width

(m)

True

width (m)

Ag g/t

Au g/t

Pb %

Zn %

SMI21-05

137.4

141.7

4.3

2.5

5

0.83

0.3

0.1

includes

139.0

139.8

0.8

0.5

11

2.51

0.5

na

199.2

203.1

3.9

2.2

2

1.52

na

0.1

includes

202.0

203.1

1.1

0.6

3

5.32

na

0.1

SMI21-06

213.7

233.0

19.3

17.5

40

0.07

0.1

0.4

SMI21-07

239.6

247.0

7.4

3.7

201

0.02

0.2

0.3

includes

239.6

240.0

0.4

0.2

1,413

0.11

0.9

1.3

270.0

287.0

17.0

8.5

124

0.01

0.1

0.1

includes

277.0

281.8

4.8

2.4

223

0.01

0.1

0.1

includes

277.0

278.0

1.0

0.5

553

0.03

0.2

0.4

na" = no significant result. Numbers may be rounded. Results are uncut and undiluted. True sample widths are approximate

due to complexity of structural orientations.

Figure 2: San Marcial NI 43-101 Resource Model - Down Dip Extension Drill Programs 2021 & 2022

(CNW Group/GR Silver Mining Ltd.)

Table 2: San Marcial Underground Drill Hole Details

Drill Hole

East (m)

North (m)

RL (m)

Dip (

˚

)

Azimuth (

˚

)

Depth (m)

Results Status

SMI21-01

451033

2546021

818

-48

218

330

Received

SMI21-02

451033

2546021

818

-43

183

345

Received

SMI21-03

451033

2546021

818

-90

0

300

Received

SMI21-04

451033

2546021

818

-70

148

234

Received

SMI21-05

451033

2546021

818

-70

325

330

Received

SMI21-06

451033

2546021

818

-50

285

255

Received

SMI21-07

451033

2546021

818

-75

90

333

Received

SMI21-08

451033

2546021

818

-80

360

309

Pending

Note: all holes drilled from the same underground drill platform

2022 Drilling Program

A two phase

4,500 m

drilling program is planned for 2022 at San Marcial. Phase 1 (

2,000 m

) is now

in progress and incorporates surface diamond drilling as well as a continuation of the underground

drilling from the existing tunnel. Phase 2 of the planned drilling program will test potential step outs

outside of the main mineralized area to search for extensions.

The Company currently has three drill rigs on site at San Marcial: one is fully dedicated to the

underground drill program, and the other two rigs are drilling shallow holes along strike, stepping out

from the Resource Area limits and also testing potential extensions down dip from the lower limits of

the Resource Area.

The 2022 San Marcial drill program will support future resource expansion and an updated NI 43-

101 mineral resource estimate.

Surface exploration is in progress following up the major controls of the breccia-hosted

mineralization, defined by recent successful drilling, and geophysical and geochemical surveys. The

focus is along 1.5 km of favorable geological setting similar to the

500 m

strike length of structures

hosting the San Marcial silver mineralization. Subject to results of this exploration program, the

Company will review the need for additional rigs to advance drilling of new targets identified to the

SE of the Resource Area.

Geological Setting

Drill holes SMI21-05 and SMI21-06 intersected the central to NW extension of the breccia in an area

with known E-W and N-S trending faults that are displacing the breccia, resulting in a reduced or

segmented breccia thickness. SMI21-05 intersected Au anomalies related to quartz-sulphide veining

in the upper zone above the San Marcial Breccia position, whilst SMI21-06 cut a wide

19 m

zone of

Ag mineralization in veining and stockwork zones in the footwall of the San Marcial Breccia, hosted

within the volcano-sedimentary unit.

Drill hole SMI21-07 is the deepest hole to date, drilled in the central area of the San Marcial Breccia

which is located at the contact between dacitic "block and ash", of the upper volcanic sequence, with

the lower volcano-sedimentary unit. Silver assays returned up to 1,413 g/t Ag (over

0.4 m

) (Table

1). The typical breccia is composed of silicified wallrock fragments within a fine-grained hematite

matrix, cemented by disseminated, but visible, galena and sphalerite. Where SMI21-07 intersects

the upper section of the San Marcial Breccia, the presence of quartz, galena and Ag-bearing

acanthite sulphides is associated with high-grade Ag values (237 to

247 m

interval) within the

breccia (Table 1). High-grade examples of the deep mineralization can be observed at the following

link (see

Core Photos

)

Previous metallurgical test work by the Company has indicated positive metallurgical recoveries of

silver from the San Marcial breccia-style mineralization. The results demonstrated that the high-

grade silver mineralization at San Marcial is amenable to standard cyanidation processing with

recoveries of up to 92% silver (see

News Release dated

February 28, 2019

).

The mineral assemblage observed is typical of low sulphidation epithermal deposits with breccia ore

type deposition, with late cross-cutting veining and stockworks related to reactivation of regional,

extensional NW-oriented graben stress.

Corporate Update -

Allotment of Options

The Company also announces that, pursuant to its 10% rolling stock option plan and in compliance

with the policies of the TSX Venture Exchange, it has granted incentive stock options to certain

officers, consultants and employees of the Company's Mexican subsidiaries, to purchase up to an

aggregate of 920,000 common shares of the Company. These options are exercisable for a period

of five years at a price of

$0.25

per share. Of these options, 100,000 options granted to an officer

will vest as to 1/3 on the date of grant, and a further 1/3 on each of the 1st and 2nd anniversaries of

the date of grant.

Qualified Person

The scientific and technical data contained in this News Release related to the exploration program

were reviewed and/or prepared under the supervision of

Marcio Fonseca

, P. Geo. He has approved

the disclosure herein.

About GR Silver Mining Ltd

.

GR Silver Mining is a Canadian-based,

Mexico

-focused junior mineral exploration company engaged

in cost-effective silver-gold resource expansion on its 100%-owned assets, located on the eastern

edge of the Rosario Mining District, in the southeast of Sinaloa State,

Mexico

. GR Silver Mining

controls 100% of two past producer precious metal underground and open pit mines, within the

expanded Plomosas Project, which includes the integrated San Marcial Area and

La Trinidad

acquisition. In conjunction with a portfolio of early to advanced stage exploration targets, the

Company holds 734 km

2

of concessions containing several structural corridors totaling over 75 km in

strike length.

GR Silver Mining Ltd.

Eric Zaunscherb

Chairman & CEO

Cautionary Statement Regarding Forward-Looking Information

This press release contains "forward-looking statements" within the meaning of applicable

Canadian securities legislation and information that are based on the beliefs of management and

reflect the Company's current expectations. When used in this press release, the words "estimate",

"project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the

negative of these words or such variations thereon or comparable terminology are intended to

identify forward-looking statements and information. Such statements and information reflect

the current view of the Company. Risks and uncertainties may cause actual results to differ

materially from those contemplated in those forward-looking statements and information. By their

nature, forward-looking statements involve known and unknown risks, uncertainties and other

factors which may cause our actual results, performance or achievements, or other future events,

to be materially different from any future results, performance or achievements expressed or

implied by such forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy

or accuracy of this press release.

SOURCE

GR Silver Mining Ltd.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/April2022/06/c7256.html

%SEDAR: 00040149E

For further information:

Brenda Dayton, VP Corporate Communications, Telephone:

+1.604.558.6248, Email: [email protected]

CO: GR Silver Mining Ltd.

CNW 06:15e 06-APR-22