GR Silver Mining Reports Near Surface Silver and Gold Mineralization in Drill Results from the Plomosas Mine Area, Plomosas Silver Project 716 gpt AgEq 1 over 6.8 m (191 gpt Ag, 1.9 gpt Au, 7.1% Pb and 3.4% Zn) 1,687 gpt AgEq over
GR Silver Mining Reports Near Surface Silver
and Gold Mineralization in Drill Results from
the Plomosas Mine Area, Plomosas Silver
Project
716 gpt AgEq
1
over
6.8 m
(191 gpt Ag, 1.9 gpt Au, 7.1% Pb and 3.4% Zn)
1,687 gpt AgEq over
0.4m
(1,559 gpt Ag, 0.5 gpt Au, 1.4% Pb and 1.1% Zn)
12.6m
at 1.7 gpt Au, 17 gpt Ag and 0.7% Zn
VANCOUVER, BC
,
Aug. 11, 2020
/CNW/ -
GR Silver Mining Ltd.
(TSXV: GRSL) (FRANKFURT:
GPE) (OTCQB: GRSLF)
("GR
Silver Mining" or the "Company")
– is pleased to report drill
results from the Plomosas Mine Area at its 100%-owned Plomosas Silver Project ("Plomosas
Project") in
Sinaloa, Mexico
.
These drill results reveal the presence of wide zones of gold mineralization in addition to attractive
near surface polymetallic (Ag-Pb-Zn) mineralization. The two styles of mineralization represent
unmined areas located
50 m
NW from a previously released section of drill hole results at the
Plomosas Mine Area (Figure 1). The results define a mineralized strike length of up to
700 m
, with
field evidence and underground mapping indicating further continuity along strike and down dip. This
news release features results from 14 diamond core holes drilled by previous companies but not
previously released. The 3D geological model of results to date in the Plomosas Mine Area
continues to support the Ag-rich polymetallic breccia being hosted within a shallow dipping fault and
the silver-gold mineralized low sulphidation epithermal veins being hosted by multiple high angle
faults.
The mineralized veins and hydrothermal breccias reported in this news release (Table 1), favour the
potential delineation of shallow polymetallic resources, up to 150 vertical metres below surface. This
zone has been earmarked for testing by the Company's upcoming shallow diamond core drilling
program to fully explore the extent of down-dip and along-strike continuity.
____________________
1
AgEq is based on long term gold, silver, zinc and lead prices of US$1600 per ounce gold, US$16.50 per ounce silver, US$0.85 per pound zinc and US$0.95 per pound lead. The
metallurgical recoveries are assumed as 90% Ag, 95% Au, 78% Pb and 70% Zn.
GR Silver Mining President and CEO,
Marcio Fonseca
, commented,
"These results confirm
continuity of the Plomosas Mine Area mineralized system, extending at least
700 m
along strike to
the NW. Additionally, our recent surface exploration work has provided evidence that the
mineralized footprint extends beyond the existing drilled areas. The definition of silver-gold rich
mineralized zones close to the surface represents potential for the delineation of shallow resources
at the Plomosas Mine Area".
Figure 1: Drone Image of the Plomosas Mine Area (looking to the NW) - Drill Hole Location Map
(CNW Group/GR Silver Mining Ltd.)
GR Silver Mining is currently advancing its surface drilling program on the two areas marked on
Figure 1, aiming to define new mineralized zones close to the surface. Modelling of mineralized
zones in 3D is also underway, integrating all drill hole data, surface and underground mapping and
underground channel sampling. The excellent geotechnical conditions of the historical Plomosas
underground mine workings allows full access to important areas where the Company has been able
to identify multiple low sulphidation epithermal veins. These veins will be the target of an
underground drilling program, expected to commence in the coming months.
Table 1 summarizes the most significant drill assay results for this set of 14 drill holes released for
the Plomosas Mine Area.
Table 1: Summary Surface Drill Hole Results - News Release
August 11
2020 (Plomosas Mine
Area)
Hole No.
From
(m)
To
(m)
Drilled
width
(m)
Est.
true
width
(m)
Ag g/t
Au g/t
Pb %
Zn %
AgEq
g/t
PLSS18-02
357.8
359.8
2.0
2.0
350
0.2
0.3
0.2
383
includes
358.9
359.3
0.4
0.4
1,559
0.5
1.4
1.1
1,687
360.5
366.8
6.3
6.3
na
1.4
na
na
PLSS18-04
377.6
387.9
10.3
10.2
52
0.2
0.1
0.5
95
PLI17-27
57.0
77.9
20.9
20.4
12
0.9
0.3
1.0
143
PLI17-35
74.8
94.7
19.9
19.2
na
0.5
0.2
0.6
PLI17-44
110.6
114.1
3.5
3.2
na
0.1
0.5
1.2
118.0
129.0
11.0
10.1
na
na
0.1
0.5
216
205.0
207.8
2.8
1.8
28
1.1
1.9
3.1
284
219
7.5
14.3
6.8
4.4
191
1.9
7.1
3.4
716
226
140.0
148.9
8.9
8.8
na
1.1
na
na
227
145.5
146.4
0.9
0.7
na
5.0
1.0
0.8
228
46.0
46.3
0.3
0.3
42
1.7
0.8
1.9
295
161.0
161.5
0.5
0.4
na
0.1
0.8
2.0
163.0
163.5
0.5
0.4
na
na
0.3
7.2
172.0
172.6
0.6
0.5
na
na
0.8
1.1
176.5
176.9
0.4
0.4
na
na
2.1
3.0
216.0
216.4
0.4
0.4
na
na
na
5.0
229
194.5
194.9
0.4
0.4
na
2.2
2.5
0.1
199.5
199.9
0.4
0.4
na
na
1.1
na
235
17.3
21.6
4.3
3.1
31
na
0.3
2.4
108
72.0
73.0
1.0
0.8
134
2.3
0.1
2.4
437
244
140.9
147.6
6.7
3.4
135
0.5
0.5
1.1
232
includes
140.9
143.3
2.4
1.2
184
na
0.4
0.9
224
148.4
154.4
6.1
3.0
4
0.8
na
na
244
160.9
167.9
7.0
3.5
16
1.1
na
na
167.9
169.2
1.3
0.7
6
1.2
0.1
6.1
367
182.2
194.7
12.6
6.3
17
1.7
na
0.7
209
252
147.3
156.3
9.0
5.2
15
0.5
na
na
*AgEq is based on long term gold, silver, zinc and lead prices of US$1600 per ounce gold, US$16.50 per ounce silver, US$0.85 per pound zinc and US$0.95 per pound lead. The
metallurgical recoveries are assumed as 90% Ag, 95% Au, 78% Pb and 70% Zn. "na" = no relevant assays. All numbers are rounded. Results are uncut and undiluted. UG:
Underground Drill Hole, SURF: Surface Drill Hole
The 14 drill holes in this news release were generated by a core drilling campaign completed by
First Majestic Silver Corp. ("First Majestic") in 2017 and 2018 (PLI17-27, PLI17-35 and PLI17-44;
PLSS18-02 and PLSS18-04), and historical drill holes completed by Grupo Mexico. Neither of the
drill sets were previously released. They are part of an extensive surface and underground diamond
core drilling database, which GR Silver Mining continues to consolidate and validate.
Table 2 lists the drill hole intervals previously not sampled ("NS") for this group of released holes.
The Company continues investigating previous unsampled intervals for evidence of mineralization in
the core that warrants additional sampling and assaying.
Additionally, Table 3 provides collar coordinates for the drill holes presented in this news release.
Table 2: Plomosas Mine Area - Drill Hole Intervals Not Sampled (Intervals greater than
20m
)
Hole No.
From-To (m)
Sampling
PLSS18-02
0-354.15
NS
PLSS18-04
0-373.05
NS
PLI17-27
0-49.05
NS
PLI17-27
84.7-121.6
NS
PLI17-35
0-70.45
NS
PLI17-44
0-92.3
NS
All numbers are rounded. NS - Core not assayed by First Majestic
Table 3: Drill Hole Locations – News Release
August 11, 2020
(Plomosas Mine Area Area)
Hole No.
East (m)
North (m)
RL (m)
Az.
Dip
Depth (m)
PLSS18-02
451201
2552308
1134
111
-57
400
PLSS18-04
451201
2552308
1134
93
-77
418
PLI17-27
451180
2552225
798
90
-45
122
PLI17-35
451179
2552229
798
62
-40
132
PLI17-44
451175
2552228
798
360
-45
193
216
451485
2552288
979
308
-60
224
219
451586
2552252
941
308
-60
263
226
451535
2552298
993
52
-60
234
227
451539
2552263
976
308
-60
203
228
451539
2552263
976
0
-77
234
229
451483
2552300
988
0
-90
208
235
451494
2552246
957
308
-60
208
244
451443
2552242
980
308
-50
200
252
451439
2552242
983
308
-59
158
All numbers are rounded.
The Company believes that the Plomosas Mine Area is part of a much larger low sulphidation
epithermal system as indicated by field evidence along 1.0 km of strike length, where only
400 m
of
that strike has previously been drilled. This represents an opportunity for the current surface drilling
program to continue discovering new mineralized zones close to the surface.
Qualified Person
The scientific and technical data contained in this News Release related to the Plomosas Project
was reviewed and/or prepared under the supervision of Marcio Fonseca, P.Geo. He has approved
the disclosure herein.
Quality Assurance Program and Quality Control Procedures ("QA/QC")
The recent drill holes completed by First Majestic from 2016 to 2018, followed QA/QC protocols
reviewed and validated by GR Silver Mining, including insertion of blank and standard samples in all
sample lots sent to First Majestic's Laboratorio Central facilities in La Parilla, Durango, for sample
preparation and assaying. Additional validation and check assays were performed by an
independent laboratory at SGS de México, S.A. de C.V. facilities in
Durango, Mexico
. The analytical
methods applied for these recent holes for Ag and Au assays comprised of Fire Assay with Atomic
Absorption finish for samples above Au >10ppm and Ag >300ppm and Gravimetric Finish. Pb and Zn
were analyzed using Inductively Coupled Plasma Optical Emission Spectrometry. GR Silver Mining
has not received information related to the Grupo Mexico QA/QC and assay protocols and at this
stage is considering the information historic for news release purposes.
About GR Silver Mining Ltd
.
GR Silver Mining Ltd. is a
Mexico
-focused company engaged in cost-effective silver-gold resource
expansion on its key assets which lie on the eastern edge of the Rosario Mining District,
Sinaloa,
Mexico
.
PLOMOSAS SILVER PROJECT
GR Silver Mining owns 100% of the Plomosas Silver Project located near the historic mining village
of
La Rastra
, within the Rosario Mining District. The Project is a past-producing asset where only
one mine, the Plomosas silver-gold-lead-zinc underground mine, operated from 1986 to 2001. The
Project has an 8,515-hectare property position and is strategically located within 5 km of the San
Marcial Silver Project in the southeast of Sinaloa State,
Mexico
. The Plomosas Project comprises six
areas with an average of 100 surface and underground drill holes in each area, geophysical and
geochemical data covering most of the concession, 16 new exploration targets from which 11 have
high priority for future exploration programs.
The 100%-owned assets include all facilities and infrastructure including: access roads, surface
rights agreement, water use permit,
8,000 m
of underground workings, water access, 60 km - 33
KV power line, offices, shops, 120-person camp, infirmary, warehouses and assay lab representing
approximately
US$30m
of previous capital investments. The previous owners invested approximately
US$18 million
in exploration.
The silver and gold mineralization on this Project display the alteration, textures, mineralogy and
deposit geometry characteristics of a low sulphidation epithermal silver-gold-base metal vein/breccia
mineralized system. Previous exploration was focused on Pb-Zn-Ag-Au polymetallic shallow
mineralization, hosted in NW-SE structures in the vicinity of the Plomosas mine. The E-W portion of
the mineralization and extensions for the main N-S Plomosas fault remains under-explored. The
Plomosas Silver Project has more than 500 recent and historical drill holes in six areas – Plomosas
Mine,
San Juan
,
La Colorada
,
Yecora
,
San Francisco
and El Saltito. These drill holes represent an
extensive database allowing the Company to advance towards resource estimation and potential
project development in the near future.
SAN MARCIAL PROJECT
San Marcial is a near-surface, high-grade silver-lead-zinc open pit-amenable project. GR Silver
Mining is currently drilling at the San Marcial Project, which contains 36 Moz AgEq (Indicated) and
11 Moz AgEq (Inferred), exploring recently defined new high-grade gold and silver targets along the
project's 6 km mineralized trend. GR Silver Mining is the first company to conduct exploration at San
Marcial in over 10 years. The NI 43-101 resource estimate (San Marcial Project – Resource
Estimation and Technical Report) was completed by WSP Canada Inc. on
March 18, 2019
and
amended on
June 10, 2020
.
Plomosas and San Marcial collectively represent a geological setting resembling the multimillion-
ounce San Dimas Mining District which has historically produced more than 600 Moz silver and 11
Moz gold over a period of more than 100 years.
OTHER PROJECTS
GR Silver Mining's other projects are situated in areas attractive for future discoveries and
development in the same vicinity of Plomosas and San Marcial in the Rosario Mining District.
Mr.
Marcio Fonseca
P. Geo, President & CEO
GR Silver Mining Ltd.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of
this press release.
Disclaimer for Forward-Looking Information
This press release contains forward-looking statements and information that are based on the
beliefs of management and reflect the Company's current expectations. When used in this press
release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict",
"may" or "should" and the negative of these words or such variations thereon or comparable
terminology are intended to identify forward-looking statements and information. Such statements
and information reflect the current view of the Company. Risks and uncertainties may cause actual
results to differ materially from those contemplated in those forward-looking statements and
information. By their nature, forward-looking statements involve known and unknown risks,
uncertainties and other factors which may cause our actual results, performance or achievements,
or other future events, to be materially different from any future results, performance or
achievements expressed or implied by such forward-looking statements.
SOURCE
GR Silver Mining Ltd.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/August2020/11/c9305.html
%SEDAR: 00040149E
For further information:
+1 (604) 202 3155, Email: [email protected]
CO: GR Silver Mining Ltd.
CNW 07:30e 11-AUG-20