Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GRSL.V ·

GR Silver Mining Reports Drilling Results in the San Juan Area: 2.5 m

Drill Results

GR Silver Mining Reports Drilling Results in

the San Juan Area:

2.5 m

@ 2,195 g/t Ag, 1.12 g/t Au (2,316 g/t AgEq

1

)

including

0.85 m

@ 5,600 g/t Ag, 1.

04 g/t Au (5,709 g/t AgEq)

3.4 m

@ 578 g/t Ag, 0.20 g/t Au, 0.5 % Pb, 1.3 % Zn (655 g/t AgEq)

VANCOUVER, BC

,

Feb. 17, 2021

/CNW/ -

GR Silver Mining Ltd.

(TSXV: GRSL) (FRANKFURT:

GPE) (OTCQB: GRSLF)

("GR Silver Mining" or the "Company")

– is pleased to report results

from the current drilling program in the

San Juan Area

, as well as new sampling results from historic

drilling, also at

San Juan

, within the 100%-owned Plomosas Silver Project ("Plomosas Project") in

Sinaloa, Mexico

.

Following on from new mineralized zones drilled at

San Juan

earlier in the program (see

News Release

November 23, 2020

), the latest drilling results continue to define high-grade Ag-Au

epithermal mineralization in the

San Juan Area

and expansion of the mineralized trend southwards

towards the nearby San Francisco Vein. They also demonstrate near-surface high-grade Ag vein

zones that will be integrated in the upcoming resource estimation (Figure 1).

___________________

1

AgEq is based on long term gold, silver, zinc, lead and copper prices of US$1600 per ounce gold, US$16.50 per ounce silver, US$0.85 per pound zinc, US$0.95 per pound lead

and US$2.00 per pound copper. The metallurgical recoveries are assumed as 90% Ag, 95% Au, 78% Pb, 70% Zn and 70% Cu.

GR Silver Mining President and CEO,

Marcio Fonseca

, commented,

"

The Company continues

to outline a much larger epithermal system in the

San Juan Area

of the Plomosas Project. The

recent drilling data at the San Francisco Vein delineates additional zones of epithermal veining and

hydrothermal breccias, extending existing structures

200 m

to the south. The integration of the

San

Juan Area

with the potential acquisition of concessions between the San Marcial and Plomosas

Projects delineates an initial 4 km long, 100%-controlled north-south mineralized corridor. This

corridor represents only one of the nine mineralized corridors under exploration by the Company

inside the Plomosas Silver Project. Our 2021 drilling program is focused on the resource

estimation for the

San Juan

and Plomosas Mine Areas, and it will also target potential high-grade

Ag-Au discoveries in the nine mineralized corridors that have been identified to date in the

Plomosas Project."

The high-grade Ag intersections in the

San Juan Area

, as confirmed by the drilling, define a

predominantly Ag-rich epithermal system (Table 1). Recent work by the Company indicates that the

San Juan Area

appears to be a highly prospective epithermal system, supported by field

reconnaissance, which has identified several shallow precious metals-rich old workings. The

San

Juan Area

contains a 2 km long north-south trending epithermal system parallel to the vein system in

the Plomosas Mine Area (Figure 1 and 2).

Results of drilling at the San Francisco Vein indicate a north-south trend with a series of outcrops

exhibiting multiple phases of veining, stockwork and brecciation. These outcrops are located

approximately

200 m

south of the San Juan Vein, indicating an opportunity for expansion of the

mineralized system along strike (Figure 1). The drilling results in this news release also suggest that

a large epithermal system continues towards the under acquisition concessions located between the

Plomosas and San Marcial Projects (see

News Release

February 1, 2021

).

Figure 1: Location Map - San Juan Area Drilling Locations

Figure 1: Location Map - San Juan Area Drilling Locations (CNW Group/GR Silver Mining Ltd.)

Figure 2: Plomosas Project - Location Map of 9 Mineralized Corridors

Figure 2: Plomosas Project - Location Map of 9 Mineralized Corridors (CNW Group/GR Silver

Mining Ltd.)

The following table shows the drill results that are expected to be included in the upcoming resource

estimation for the San Juan Area.

Table 1: Surface and Underground Drill Hole Assay Results - News Release

February 17,

2021

Hole No

Type

From

(m)

To (m)

Drilled

width

(m)

Ag g/t

Au g/t

Pb %

Zn %

Cu %

AgEq

g/t

SJS-16

SURF

236.4

238.9

2.5

2,195

1.12

na

na

0.3

2,316

includes

238.0

238.9

0.9

5,600

1.04

na

na

0.1

5,709

SJS17-01

SURF

132.5

141.3

8.8

87

0.31

0.8

1.9

na

201

SJS18-03

SURF

260.3

261.4

1.1

244

0.53

1.0

2.1

0.4

418

SFS20-01

SURF

0.0

22.0

22.0

70

0.15

0.3

0.3

na

108

SFS20-02

SURF

0.0

15.0

15.0

42

0.10

0.3

0.2

na

69

LR2D-06

SURF

157.3

160.7

3.4

578

0.20

0.5

1.3

na

655

includes

157.3

159.7

2.4

770

0.07

0.7

1.8

0.1

854

LCS18-15

SURF

316.8

325.5

8.7

0.3

0.03

na

0.4

na

LCS18-14-A

SURF

446.2

464.5

18.3

2.0

0.06

0.1

0.7

na

As final interpretation of the 3D orientation of mineralization is incomplete, true widths are unknown at this time and are reported as drilled widths. AgEq is based on long term gold,

silver, zinc and lead prices of US$1600 per ounce gold, US$16.50 per ounce silver, US$0.85 per pound zinc, US$0.95 per pound lead and US$2.00 per pound copper. The

metallurgical recoveries are assumed as 90% Ag, 95% Au, 78% Pb, 70% Zn and 70% Cu. All numbers are rounded. Results are uncut and undiluted. SURF: Surface Drill Hole; "na"

= no relevant assays

The following table summarizes the collar locations for drill holes reported in this News Release.

Table 2: Drill Hole Locations – News Release

February 17, 2021

Hole No.

East (m)

North (m)

RL (m)

Dip (˚)

Azimuth (˚)

Depth (m)

SJS-16

448352

2550753

1024

-90

0

298

SJS17-01

448218

2550666

952

-90

0

221

SJS18-03

448367

2550707

1031

-70

220

371

SFS20-01

448451

2550233

928

-50

272

49.5

SFS20-02

448451

2550233

928

-70

272

50

LR2D-06

448241

2550716

978

-57

226

179

LCS18-15

448130

2550904

946

-56

226

472

LCS18-14-A

448117

2550967

942

-72

236

529

All numbers are rounded.

Red

drill holes are drilled and/or assayed by GRSL; East (m) and North (m) are UTM coordinates in WGS84, zone 13

These very encouraging drill hole results not only confirm the presence of high-grade Ag-

predominant epithermal veins at the

San Juan Area

, but also open up the opportunity for additional

continuity of the mineralized trend to the south. The potential to increase the strike of the

mineralization from the existing 2 km to 4 km and achieve new discoveries is still conceptual in

nature. However, recent field mapping and sampling provides strong support for a 4 km long

structural corridor.

GR Silver Mining believes that Plomosas represents a district-scale project. The Company is

carrying out a

10,000 m

diamond core drilling program and plans to complete a resource estimation

in two areas (Plomosas and

San Juan

) in the second quarter of 2021. Work to date has already

resulted in success in expanding the known zones of mineralization within these two areas. The

Plomosas Mine Area displays evidence of a

600 m

long epithermal system, potentially extending up

to 1.2 km, where multiple veins and discoveries have so far defined a much larger high-grade Ag and

Au mineralized footprint. Through surface exploration and drilling, the

San Juan Area

, initially thought

to consist of only one

400 m

long epithermal vein, now appears as a 2 km long epithermal system,

with at least six epithermal veins.

The Plomosas Mine Area and

San Juan Area

, currently undergoing resource estimations, each have

a geological footprint similar to the nearby San Marcial Project, where the company has estimated a

NI 43-101 resource of 29 million ounces Ag (Indicated) and 10 million ounces Ag (Inferred). The NI

43-101 resource represents only the initial

500 m

long structural corridor, part of a 6 km trend under

exploration inside the San Marcial Project.

The integration of the Plomosas Project and the San Marcial Project, together with concessions

under acquisition located between them, provides the company full control of all major structural

corridors on the eastern edge of the Rosario Mining District (Figure 2). GR Silver Mining will continue

to explore new mineralized zones close to the surface in the remaining part of the exploration

concessions in 2021, supporting constant resource growth.

Qualified Person

The scientific and technical data contained in this News Release related to the Plomosas Project

was reviewed and/or prepared under the supervision of Marcio Fonseca, P.Geo. He has approved

the disclosure herein.

Quality Assurance Program and Quality Control Procedures ("QA/QC")

The Company has implemented QA/QC procedures which include insertion of blank, duplicate and

standard samples in all sample lots sent to SGS de México, S.A. de C.V laboratory facilities in

Durango, Mexico

, for sample preparation and assaying. For every sample with results above Ag

>100 ppm (over limits), these samples are submitted directly by SGS de

Mexico

to SGS Canada Inc

at

Burnaby, BC

. The analytical methods are 4-acid Digest and Inductively Coupled Plasma Optical

Emission Spectrometry with Lead Fusion Fire Assay with gravimetric finish for silver above over

limits. For gold assays the analytical methods are Lead Fusion and Atomic Absorption Spectrometry

Lead Fusion Fire Assay and gravimetric finish for gold above over limits.

The recent drill holes, completed by First Majestic from 2016 to 2018, followed QA/QC protocols

reviewed and

validated by GR Silver Mining, including insertion of blank and standard samples in all sample lots

sent to First Majestic's Laboratorio Central facilities in La Parilla, Durango, for sample preparation

and assaying. Additional validation and check assays were performed by an independent laboratory

at SGS de México, S.A. de C.V. facilities in Durango, Mexico. The analytical methods applied for

these recent holes for Ag and Au assays comprised of Fire Assay with Atomic Absorption finish

for samples above Au >10ppm and Ag >300ppm and Gravimetric Finish. Lead and Zn were analyzed

using Inductively Coupled Plasma Optical Emission Spectrometry. GR Silver Mining has not received

information related to the Grupo Mexico QA/QC and assay protocols and at this stage is considering

the information historic for news release purposes.

About GR Silver Mining Ltd

.

GR Silver Mining Ltd. is a

Mexico

-focused company engaged in cost-effective silver-gold resource

expansion on its key assets which lie on the eastern edge of the Rosario Mining District,

Sinaloa,

Mexico

.

PLOMOSAS SILVER PROJECT

GR Silver Mining owns 100% of the Plomosas Silver Project located near the historic mining village

of

La Rastra

, within the Rosario Mining District. The Project is a past-producing asset where only

one mine, the Plomosas silver-gold-lead-zinc underground mine, operated a 600 tpd crush milling

flotation circuit from 1986 to 2001, producing approximately 8 million ounces of silver, 73 million

pounds of lead and 28 million pounds of zinc.

The Project has an 8,515-hectare property position and is strategically located within 5 km of the

Company's San Marcial Silver Project in the southeast of Sinaloa State,

Mexico

.

The

March 2020

acquisition of the Plomosas Silver Project included 563 historical and recent drill

holes from both surface and underground locations. These drill holes represent an extensive

database allowing the Company to advance towards resource estimation and potential project

development in the near future.

The Company is carrying out a drilling program with surface holes focused on expanding known

mineralization along strike in two initial areas, the Plomosas Mine Area and the

San Juan Area

.

Underground drilling included in the program will target the extension of recent Au rich discoveries at

the lowest level (

775 m

RL, or ~250 m below surface) of the Plomosas Mine Area and six low

sulfidation epithermal veins at

San Juan Area

. Both areas will be the subject of NI 43-101 resource

estimations following completion of this drill program.

The 100%-owned assets include all facilities and infrastructure including: access roads, surface

rights agreement, water use permit,

8,000 m

of underground workings, water access, 60 km - 33

KV power line, offices, shops, 120-person camp, infirmary, warehouses and assay lab representing

approximately

US$30 million

of previous capital investments. The previous owners invested

approximately

US$18 million

in exploration, including extensive geophysics and geochemistry

programs.

The silver and gold mineralization on this Project display the alteration, textures, mineralogy and

deposit geometry characteristics of a low sulfidation epithermal silver-gold-base metal vein/breccia

mineralized system. Previous exploration was focused on Pb-Zn-Ag-Au polymetallic shallow

mineralization, hosted in NW-SE structures in the vicinity of the Plomosas mine. The E-W portion of

the mineralization and extensions for the main N-S Plomosas fault remain under-explored.

In addition to the resource potential at Plomosas, a review of the existing drill hole database,

geophysical surveys and geochemical data covering most of the concession, has defined 16 new

exploration targets from which 11 have high priority for future exploration programs.

SAN MARCIAL PROJECT

San Marcial is a near-surface, high-grade silver-lead-zinc open pit-amenable project, which contains

a 36 Moz AgEq (Indicated) and 11 Moz AgEq (Inferred) NI 43-101 resource estimate. The Company

has filed a National Instrument 43-101 ("NI 43-101") report entitled "

San Marcial Project Resource

Estimation and Technical Report,

Sinaloa, Mexico

" having an effective date of

March 18, 2019

and

an amended date of

June 10, 2020

(the "Report"). The Report was prepared by

Todd McCracken

and

Marcelo Filipov

of WSP Canada Inc. and is available on SEDAR. The company recently

completed over

320 m

of underground development in the San Marcial Resource Area, from which

underground drilling is planned to expand the high-grade portions of the resource down dip. The

Company recently discovered additional mineralization in the footwall, outside of the existing

resource, and will also be drilling this area. GR Silver Mining is the first company to conduct

exploration at San Marcial in over 10 years.

Recent exploration has identified silver and gold mineralization in areas previously defined as non-

mineralized, discovering evidence of pervasively altered rocks with intense silicification, veining and

associated wide, silver and gold mineralized zones on the footwall of the NI 43-101 resource.

Plomosas and San Marcial collectively represent a geological setting resembling the multimillion-

ounce San Dimas Mining District which has historically produced more than 600 Moz silver and 11

Moz gold over a period of more than 100 years.

OTHER PROJECTS

GR Silver Mining's other projects are situated in areas attractive for future discoveries and

development in the same vicinity of Plomosas and San Marcial in the Rosario Mining District. The

recently announced Share Purchase Agreement (see

News Release

February 1, 2021

), to acquire

Marlin Gold Ltd, consolidates the business strategy to control the most important silver and gold

assets in the multi-million ounce historic Rosario Mining District. The acquisition is expected to close

on

March 31, 2021

, when GR Silver Mining will control a portfolio of over 1000 Km2, two past

producing mines fully permitted for future developments and a total combined 75 km of structures

with field evidence of 24 Ag-Au veins in historic old workings.

Mr.

Marcio Fonseca

P. Geo, President & CEO

GR Silver Mining Ltd.

Facebook

LinkedIn

Twitter

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of

this press release.

Disclaimer for Forward-Looking Information

This press release contains forward-looking statements and information that are based on the

beliefs of management and reflect the Company's current expectations. When used in this press

release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict",

"may" or "should" and the negative of these words or such variations thereon or comparable

terminology are intended to identify forward-looking statements and information.

Such statements and information reflect the current view of the Company. Risks and uncertainties

may cause actual results to differ materially from those contemplated in those forward-looking

statements and information. By their nature, forward-looking statements involve known and

unknown risks, uncertainties and other factors which may cause our actual results, performance or

achievements, or other future events, to be materially different from any future results,

performance or achievements expressed or implied by such forward-looking statements.

SOURCE

GR Silver Mining Ltd.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/February2021/17/c1540.html

%SEDAR: 00040149E

For further information:

+1 (604) 202 3155, Email: [email protected]

CO: GR Silver Mining Ltd.

CNW 07:30e 17-FEB-21