Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GRSL.V ·

GR Silver Mining Identifies Additional High- Grade Drill Results at Plomosas 1.7 m at 26.9 gpt Au 3.0 m at 11.9 gpt Au 51.4 m at 6.0 % Zn and 4.8% Pb 13.6 m at 15.5% Zn, 15.7%Pb, 1.9 gpt Au and 65 gpt Ag

Drill Results

GR Silver Mining Identifies Additional High-

Grade Drill Results at Plomosas

1.7 m

at 26.9 gpt Au

3.0 m

at 11.9 gpt Au

51.4 m

at 6.0 % Zn and 4.8% Pb

13.6 m

at 15.5% Zn, 15.7%Pb, 1.9 gpt Au and 65 gpt Ag

VANCOUVER

,

April 23, 2020

/CNW/ -

GR Silver Mining Ltd. (TSXV: GRSL,

FRANKFURT

: GPE,

OTCQB: GLYXF) ("GR Silver Mining" or the "Company")

– is pleased to announce that it has

identified more high-grade drill results at Plomosas Silver Project ("Plomosas Project") in

Sinaloa,

Mexico

. The latest results are located in the Plomosas Mine Area, one of six priority areas with a

combination of recent (2016 to 2018) and historical drilling data being released by the Company (

See Drone Image

). The most significant drill hole results for this release include the following:

1

.

7 m

at 26.9 gpt Au, 44 gpt Ag and

3.0 m

at 11.9 gpt Au, 22 gpt Ag -

representing high-

grade, precious metals-rich, low sulphidation epithermal veins hosted by E-W to NE-SW

trending fault zones (

See Photo 1

).

51.4 m

at 6.0% Zn, 4.8% Pb, 0.8 gpt Au and 26 gpt Ag including

13.6 m

at 15.5 %Zn, 15.7% Pb, 1.9 gpt Au and 65 gpt Ag

- representing the discovery of a wide polymetallic (Zn-Pb-Ag-Au) breccia on the same NW-

trending fault zone that was previously mined

200 m

above in the Plomosas mine. This confirms

upside potential for delineation of additional mineralized zones down-dip and along strike in

dilational sets hosted by the main regional Plomosas fault (

See Photo 2

).

The drill hole results serve as evidence for future resources at the Plomosas Mine Area - additional

high-grade silver and gold in parallel and oblique systems to the main polymetallic wide breccia,

hosted by the Plomosas fault (Figure 1).

Figure 1:

Cross Section - Drill Hole Collar Locations and Geology – Mineralized Structures

(Plomosas Mine Area), View North (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining President and CEO,

Marcio Fonseca

, commented

,

"

The first batch of drill hole

results from the Plomosas Mine Area provides support for the significant potential of this area for

discoveries of new mineralization and the delineation of additional resources in the future. The

results not only confirm the continuity of the polymetallic wide breccia system down-dip from the

historical underground mine, but also present discoveries of parallel Au-Ag mineralized veins and

breccias. These features are being incorporated into a 3D geological model for the first time. The

results indicate potential for bulk tonnage polymetallic mineralization (Zn-Pb with attractive Ag-Au

grades) in un-mined zones near existing underground development, as well as new opportunities

for future expansion. We continue to review and validate the extensive database of drill holes,

integrating all information in a 3D model aiming at a future resource estimation."

Table 1: Drill Hole Results - (Plomosas Mine Area)

Hole No.

From

(m)

To

(m)

Drilled

width

(m)

Est.

true

width

(m)

Ag g/t

Au g/t

Zn %

Pb%

PLI16-01

121.4

124.3

2.9

2.0

28

4.2

0.5

2.4

PLI16-02

79.3

83.1

3.8

3.2

40

0.2

0.3

0.2

PLI17-01

99.8

125.3

25.5

18

7

1.7

1.0

1.3

includes

109.1

112.1

3.0

2.1

22

11.9

0.1

0.2

PLI17-02

111.3

115.8

4.6

3.2

39

1.6

3.6

4.9

PLI17-03

72.0

75.5

3.5

3.4

4

1.4

0.5

1.2

PLI17-04

88.6

91.6

3.0

2.9

22

1.5

3.9

6.5

AU08-PLS-02

315.0

342.9

27.9

27.5

13

1.8

0.4

0.9

SD-10

239.0

290.3

51.4

50.6

26

0.8

4.8

6.0

includes

273.0

286.6

13.6

13.4

65

1.9

15.7

15.5

SD-45

229.8

231.5

1.7

1.5

44

26.9

1.2

0.1

232.8

246.9

14.1

12.2

12

4.7

0.5

0.1

SD-48

284.2

326.4

42.3

38.3

18

0.5

1.1

2.1

includes

324.5

326.4

1.9

1.7

165

3.3

2.5

2.8

SD-54

327.5

330.7

3.3

3.1

69

4.2

1.0

1.0

PD-119

40.5

56.7

16.2

8.1

55

3.3

0.8

3.1

PD-120

22.9

24.7

1.8

1.6

50

6.4

12.3

11.1

155

49.7

52.2

2.5

2.2

43

5.9

7.1

9.0

All numbers are rounded.

The existing drill holes for the Plomosas Mine Area were generated by drill campaigns completed by

Grupo Mexico between 1982-2000 and First Majestic Silver Corp. ("First Majestic") between 2016-

2018 and form an extensive database for GR Silver Mining. The primary objective of Grupo Mexico

was the discovery of Pb and Zn mineralization as potential feed for their historical flotation plant

operations nearby. First Majestic drilled the Plomosas Mine Area aiming to define new mineralized

zones down-dip and along strike from the surface and underground sites. Wherever assay intervals

are identified as missing within the drill hole database, the relevant drill holes will be re-examined,

sampled, and assayed using the remaining core to complete the sequence of results.

The current on-site and database review by GR Silver Mining has confirmed the existence of multiple

vein systems hosted in a set of regional fault zones (Figure 2). In these favorable zones, wide

mineralization is generally encountered on dilational sets where the regional faults show changes in

direction, both laterally and vertically.

At the Plomosas Mine Area, the drill holes from this News Release (Table 1) have intercepted

polymetallic (Zn-Pb-Ag-Au) breccias and/or shears trending N-S to NW-SE and dipping 35-50

degrees, doubling the known mineralized system down-dip within the regional Plomosas fault (Figure

1). These breccias are predominantly monomictic with angular fragments and a sulfide-rich matrix.

The gold and silver mineralization appears to be a later mineralizing phase relative to polymetallic

(Zn-Pb-Ag-Au) breccias and they are commonly located in E-W to NE-SW and N-S to NE-SW fault

systems, respectively. The gold and silver bearing structures are characterized as a set of low

sulphidation epithermal veins and stockworks on the hanging wall and footwall of the polymetallic

breccias, presenting expanded zones for future resource modelling.

Figure 2:

Drill Hole Collar Locations and Geology – Mineralized Structures (Plomosas Mine Area)

(CNW Group/GR Silver Mining Ltd.)

Table 2: Drill Hole Locations and Coordinates (Plomosas Mine Area)

Hole No.

East

North

RL

Azimuth

Dip

Depth (m)

155

451156

2551921

766.2

0

-90

123.5

AU08-PLS-02

450894

2551786

968.0

27

-60

370.9

PD-119

451043

2551921

752.7

270

-60

147.0

PD-120

451097

2551921

752.7

90

-90

61.1

PLI16-01

450914

2551888

705.0

0

-90

286.4

PLI16-02

450918

2551887

705.0

45

-90

318.6

PLI17-01

450915

2551892

705.0

360

-50

335.5

PLI17-02

450915

2551891

705.0

360

-61

321.9

PLI17-03

450916

2551891

705.0

33

-66

235.4

PLI17-04

450916

2551892

705.0

33

-40

170.2

SD-10

451025

2551843

991.8

57

-83

364.1

SD-45

451048

2551838

990.4

270

-83

376.2

SD-48

451105

2551855

1023.7

90

-83

326.4

SD-54

451107

2551881

1038.7

90

-77

330.7

All numbers are rounded.

Plomosas Mine Area

From 1986 to 2001, within the Plomosas Mine Area, Grupo Mexico operated a shallow 600 tpd

room and pillar underground mine operation to supply material to the crushing-milling- flotation plant

(decommissioned), producing both Pb concentrate and Zn concentrate. The underground mine

operated only between levels

1000 m

and

750 m

and along a strike length of approximately

350 m

.

Historical underground operations mined only the polymetallic breccia. Two underground access

tunnels were constructed to provide flexibility to extract ore from a total of

8,000 m

of underground

development. Today, following a period of care and maintenance, most of the underground

development and mine infrastructure are in good condition allowing immediate access to all

mineralized showings for additional sampling.

Historical reports indicate that the operations were interrupted due to low commodity prices in 2001.

The historical underground cut-off grade, as reported by Grupo Mexico at the time when operations

were interrupted, was based on

US$290

/oz Au,

US$5

/oz Ag and

US$0.50

/lb Zn and Pb. GR Silver

Mining is investigating and validating the extensive database, that includes both drill hole data and

also underground channel sample results, to fully integrate all the data in accordance with current

commodity prices and proper QA/QC protocols to define new mineralized zones.

Qualified Person

The scientific and technical data contained in this News Release related to the Plomosas Project

was reviewed and/or prepared under the supervision of

Marcio Fonseca

, P.Geo.

Quality Assurance Program and Quality Control Procedures ("QA/QC")

The recent drill holes completed by First Majestic followed QA/QC protocols reviewed and validated

by GR Silver Mining, including insertion of blank and standard samples in all sample lots sent to First

Majestic's Laboratorio Central facilities in La Parilla, Durango, for sample preparation and assaying.

Additional validation and check assays were performed at independent laboratory by at SGS de

México, S.A. de C.V facilities in

Durango, Mexico

. The analytical methods applied for these recent

holes for Ag and Au assays comprised of Fire Assay with Atomic Absorption finish for samples

above Au > 10ppm and Ag > 300ppm and Gravimetric Finish. Pb and Zn were analyzed using

Inductively Coupled Plasma Optical Emission Spectrometry.

GR Silver Mining has not received information related to the Grupo Mexico QA/QC and assay

protocols and at this stage is considering the information historic for news release purpose.

About GR Silver Mining Ltd

.

GR Silver Mining Ltd. (GRSL.V) is a

Mexico

-focused company engaged in cost-effective silver-gold

resource expansion on its key assets which lie on the eastern edge of the Rosario Mining District,

Sinaloa, Mexico

.

PLOMOSAS SILVER PROJECT

GR Silver Mining owns 100% of the Plomosas Silver Project located near the historic mining village

of

La Rastra

, within the Rosario Mining District. The Project is a past-producing asset where only

one mine, the Plomosas silver-gold-lead-zinc underground mine, operated from 1986 to 2001. The

Project has an 8,515-hectare property position and is strategically located within 5 km of the San

Marcial Silver Project in the southeast of Sinaloa State,

Mexico

. The Plomosas Project comprises six

areas with an average of 100 surface and underground drill holes in each area, geophysical and

geochemical data covering most of the concession, and the delineation of 16 exploration/drilling

targets.

The 100% owned assets include all facilities and infrastructure including: access roads, surface

rights agreement, water use permit,

8,000 m

of underground workings, water access, 60 km - 33

KV power line, offices, shops, 120-person camp, infirmary, warehouses and assay lab representing

approximately

US$30m

of previous capital investments. The previous owners invested approximately

US$18 million

in exploration.

The silver and gold mineralization on this Project display the alteration, textures, mineralogy and

deposit geometry characteristics of a low sulphidation epithermal silver-gold-base metal vein/breccia

mineralized system. Previous exploration was focused on Pb-Zn-Ag-Au polymetallic shallow

mineralization, hosted in NW-SE structures in the vicinity of the Plomosas mine. The E-W portion of

the mineralization and extensions for the main N-S Plomosas fault remains under-explored. The

Plomosas Silver Project has more than 500 recent and historical drill holes in six areas – Plomosas

Mine,

San Juan

,

La Colorada

,

Yecora

,

San Francisco

and El Saltito. These drill holes represent an

extensive database allowing the Company to advance towards resource estimation and potential

project development in the near future.

SAN MARCIAL PROJECT

San Marcial is a near-surface, high-grade silver-lead-zinc open pit-amenable project. GR Silver

Mining is currently expanding its NI 43-101 resource estimate at the San Marcial Project, which

contains 36 Moz AgEq (Indicated) + 11 Moz AgEq (Inferred), by defining new high-grade gold and

silver targets along the project's 6 km mineralized trend. GR Silver Mining is the first company to

conduct exploration at San Marcial in over 10 years. The NI 43-101 resource estimate (San Marcial

Project – Resource Estimation and Technical Report) was completed by WSP Canada Inc. on

March 26, 2019

.

Plomosas and San Marcial collectively represent a geological setting resembling the multimillion-

ounce San Dimas Mining District which has historically produced more than 620 Moz silver and 11

Moz gold over a period of more than 100 years.

OTHER PROJECTS

GR Silver Mining's other projects are situated in areas attractive for future discoveries and

development in the same vicinity of Plomosas and San Marcial in the Rosario Mining District.

Mr.

Marcio Fonseca

P. Geo, President & CEO

GR Silver Mining Ltd.

Facebook

LinkedIn

Twitter

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of

this press release.

Disclaimer for Forward-Looking Information

This press release contains forward-looking statements and information that are based on the

beliefs of management and reflect the Company's current expectations. When used in this press

release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict",

"may" or "should" and the negative of these words or such variations thereon or comparable

terminology are intended to identify forward-looking statements and information. Such statements

and information reflect the current view of the Company. Risks and uncertainties may cause actual

results to differ materially from those contemplated in those forward-looking statements and

information. By their nature, forward-looking statements involve known and unknown risks,

uncertainties and other factors which may cause our actual results, performance or

achievements,

or other future events, to be materially different from any future results, performance or

achievements expressed or implied by such forward-looking statements.

SOURCE

GR Silver Mining Ltd.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/April2020/23/c9902.html

%SEDAR: 00040149E

For further information:

+1 (604) 202 3155, Email: [email protected]

CO: GR Silver Mining Ltd.

CNW 07:30e 23-APR-20