GreenLight Metals Intersects 22.24 meters of 3.02 g/t Gold and 2.03% Copper (5.27% Copper Equivalent) at the Bend VMS Deposit in Wisconsin High-Grade Intercept in hole B25-004 includes Visible Gold at 290m; Results Confirm Strengthening Mineralization Down-
GreenLight Metals Intersects 22.24 meters of
3.02 g/t Gold and 2.03% Copper (5.27% Copper
Equivalent) at the Bend VMS Deposit in
Wisconsin
High-Grade Intercept in hole B25-004 includes Visible Gold at
290m; Results Confirm Strengthening Mineralization Down-
Plunge
Medford, Wisconsin--(Newsfile Corp. - October 21, 2025) - GreenLight Metals Inc. (TSXV: GRL)
("
GreenLight
" or the "
Company
") is pleased to announce additional high-grade Copper and Gold
results from its Phase 1 drilling program at the Bend Project in Wisconsin, further to its September 22,
2025 news release reporting results from holes B25-001 through B25-003. The six-hole diamond drilling
program, totaling 2,037 meters, was completed from three sites along two sections entirely on the
Company's leased forty-acre tract of private minerals.
Highlights
Phase 1 Program Complete:
Six-hole drilling program successfully completed on schedule,
targeting eastern extensions of the known Bend deposit. Drilling confirms mineralization extends
eastward along a ~36-42° plunge and remains open at depth and along trend.
B25-004: Increase in both grade and thickness of mineralization ~45 meters down dip of
previously released hole B25-003 (12.85m of 3.74% CuEq)
34.25 meters (drilled thickness) averaging 2.22 g/t Au, 1.35% Cu, 15.62 g/t Ag and
193.22 g/t Tellurium (Te) (3.74% CuEq, not including Te) from 275.25m
Including 22.24 meters averaging 3.02 g/t Au, 2.03% Cu, 23.53 g/t Ag and 283.08
g/t Te within massive to semi-massive sulfide (5.27% CuEq) from 276.29m
Localized high grade gold intersection within the main sulfide body over 6.10
meters averaging 7.41 g/t Au from 287.9 meters. Visible gold was identified at 290m
B25-005: Extension of copper and gold mineralization eastward 57m down plunge of
B25-003, 47m along strike of B25-004
19.32 meters (drilled thickness) averaging 2.03 g/t Au, 0.78% Cu, 10.12 g/t Ag, 153.73
g/t Te (2.95% CuEq) from 285.83m
Including 8.79 meters averaging 1.93 g/t Au, 1.64% Cu, 20.31 g/t Ag, 273.48 g/t Te
(3.74% CuEq) within massive to semi-massive sulfide zone from 285.83m
Including 4.00 meters averaging 4.19 g/t Au, 0.1% Cu, 2.03 g/t Ag, 100.70 g/t Te
(4.52% CuEq) within footwall crystal tuff from 300m
B25-006 (assays pending):
Visual results include 17.11m of semi-massive to massive sulfide from 328.52m and 5.42m
of heavily mineralized footwall crystal tuff from 345.63m
Strategic Advantage: Program executed entirely on private mineral lands with existing
permits, demonstrating GreenLight's ability to advance exploration efficiently while
federal permit applications remain pending
Matt Filgate, President & CEO, commented: "The results from Holes 4 and 5 demonstrate increasing
grade and thickness as mineralization continues down-dip and strengthens within the deposit core. We
are highly encouraged by the presence of high-grade copper and gold-including visible gold at 290
meters-which underscores the project's growth potential. The results of the Phase 1 drill program have
confirmed substantial continuity of high-grade mineralization and established clear vectors for our
upcoming 5,000-6,000 meter winter drill campaign."
Table 1: Summary of Significant Intercepts - Holes B25-004 and B25-005
DDH
From (m)
To (m)
Interval (m)
Cu (%)
Au (g/t)
Ag (g/t)
Te (g/t)
Cu Eq (%)
B25-004
275.25
309.5
34.25
1.35
2.22
15.62
193.2
3.74
Including
276.29
298.53
22.24
2.03
3.02
23.53
283.1
5.27
Including
287.9
294
6.10
2.20
7.41
27.01
346.3
10.08
B25-005
285.83
305.15
19.32
0.78
2.03
10.12
153.7
2.95
Including
285.83
294.62
8.79
1.64
1.93
20.31
273.5
3.74
and
300.00
304.00
4.00
0.10
4.19
2.03
100.7
4.52
The composite grades of select intervals are calculated on a length-weighted basis and are reported as
drilled thicknesses. True thicknesses of the intervals are estimated to be 75-85% of the drilled thickness.
CuEq is reported to express the aggregate in-situ value of copper, gold and silver as a percentage
copper grade. CuEq incorporates assumed metallurgical recoveries and is not a proxy for, nor evidence
of, economic value. Tellurium (Te) is reported separately and is not included in CuEq.
CuEq (%) = ((Cu grade (%) / 100 * 0.9 (recovery) * 2204.6 * $4.50) + (Au grade (g/t) * 0.9 (recovery)
/
31.1035 * $3,600) + (Ag grade (g/t) * 0.9 (recovery) / 31.1035 * $40)) / (2204.6 * 0.01 * $4.50).
Assumptions: metal prices of $4.50/lb Cu, $3,600/oz Au, $40/oz Ag; recoveries of 90% for Cu, Au and
Ag based on the Company’s preliminary assessment of analogous VMS deposits. No allowances have
been made for smelting/refining charges, penalties or deleterious elements, or payability factors. No
metallurgical test work has been completed at Bend; actual recoveries and payabilities are unknown and
may differ materially.
Tellurium (Te) overlimit analyses for samples >500 g/t Te are currently pending for 7 samples in B25-004
and B25-005. The grade for these intercepts were calculated using 500 g/t Te for these samples.
Figure 1: 2025 Drill Program Plan Map
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7506/271207_48a823a3541e2b50_001full.jpg
Hole Details
Details for holes B25-001 through B25-003 were provided in the Company's September 22, 2025
news release.
B25-004:
Collared on the same site as B25-003 and designed to test down-plunge continuity
~45m below B25-003 vertically, the mineralized horizon was intersected at 276.29m yielding
22.24m of semi-massive to massive pyrite-chalcopyrite sulfide. The 34.25-meter total mineralized
interval represents a significant increase in both grade and thickness compared to B25-003
(12.85m), confirming that mineralization strengthens down-plunge. A localized high-grade gold
zone averaging 7.41 g/t Au over 6.10 meters was intersected within the massive sulfide body, with
visible gold identified at 290 meters. B25-004 also intersected 13.57m of pyrite in the footwall
quartz- eye crystal tuff from 298.53m to 312.10m.
B25-005:
Collared as a 47m step back south on the same section as B25-001/002 to test down-
plunge extent at 60m vertical depth below B25-002, the mineralized horizon was intersected at
285.83m with 8.79m of semi-massive to massive pyrite-chalcopyrite. This hole supported the
hypothesis of a 36° to 42° plunge to the east. B25-005 also intersected 16.6m of strong pyrite
mineralized footwall chloritized quartz-eye crystal tuff known for hosting gold mineralization from
294.62m to 311.22m.
B25-006:
Collared from the same site as B25-005 to test 60m down dip vertically, the mineralized
horizon was intersected at 328.52m coring 17.11m of semi-massive to massive sulfides. Similar
to overlying holes, a 5.42m thick pyritic-rich footwall zone within the quartz-eye crystal tuff was
intersected from 345.63m to 351.05m.
Next Steps
Pending assays:
Results for the final Phase 1 hole, B25-006, are expected in the coming weeks
and will be released once received and validated.
Phase 2
: Planning is currently underway for an expanded, winter drill program to follow up on the
recent drilling success at the Bend project. Permitting efforts on both the federal properties
(Prospecting Permit) as well as within the privately owned Soo Line Mineral Parcel are in progress
to initiate a 5,000 - 6,000 meter drill program to further expand the deposit.
GreenLight Engages Bunt Capital for Investor Relations Services
The Company also announces it has entered into a six-month agreement with Bunt Capital Corporation
("
Bunt Capital
"), based in Toronto, Ontario, to provide investor relations services to the Company. Bunt
is a full-service marketing and consulting services company focused on the junior metals and mining
sector. Bunt will communicate directly with existing shareholders, analysts and prospective investors.
Under the agreement, Bunt Capital will provide investor relations and capital-markets advisory services,
including institutional and family-office outreach and coordination of non-deal roadshows.
The Company will pay Bunt Capital C$15,000 per month plus applicable taxes, invoiced monthly in
arrears, from working capital, for a total of C$90,000 plus taxes over the six month term. Bunt may from
time to time acquire or dispose of securities of the Company through the market, privately or otherwise,
as circumstances or market conditions warrant. Bunt has also agreed to the Company's insider trading
policy and will observe the Company's trading blackouts. Bunt and its affiliates are at arm's length to the
Company and has no other relationship with the Company, except pursuant to the engagement
agreement. The engagement is subject to acceptance of the TSX Venture Exchange.
Table 2: Drill Collar Information
Hole ID
Easting (m)
Northing (m)
Elevation (masl)
Azimuth
Dip
Total Depth (m)
B25-001
688514.058
5018602.251
412.855
344.0
48.0
279.81
B25-002
688512.840
5018601.978
413.468
342.0
58.0
307.24
B25-003
688490.294
5018569.989
412.868
344.0
55.5
276.61
B25-004
688491.065
5018570.208
412.871
344.7
65.0
368.20
B25-005
688533.987
5018560.256
415.502
345.0
59.0
376.43
B25-006
688534.039
5018560.161
416.008
344.0
67.0
428.85
*Coordinates in NAD83 UTM Zone 15N
Figure 2: Long Section with DDH pierce points on plane of mineralization
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7506/271207_48a823a3541e2b50_004full.jpg
Figure 3: Cross Section A-A'
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7506/271207_48a823a3541e2b50_005full.jpg
Figure 4: Cross Section B-B'
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7506/271207_48a823a3541e2b50_006full.jpg
B25-004: 276.1m - 286.90m
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7506/271207_1-286.90.jpg