Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GRDM.V ·

Outlines Platinum Palladium Targets at East Bull Lake Property

Exploration Programs

Grid Metals Corp.

Outlines Platinum Palladium Targets at East Bull Lake Property

December 16, 2019 Toronto Ontario ( Grid Metals Corp TSXV:GRDM ) (“ Grid” or the

“Company”) today outlined drill targets for the upcoming drill program at its East Bull Lake platinum

palladium program. The Company has outlined up to three targets for drilling in the upcoming

program scheduled for January 2020. Grid controls the majority of the East Bu ll Property which is a

platinum gro up metal bearing layered Proteroz oic intrusion located approximately 80 km west of

Sudbury Ontario.

East Bull Lake Drill Program

The Company anticipates testing up to three separate targets at the East Bull Lake Property – all of

which have returned significant palladium values from previous exploration programs either in drill

holes and/or in surface trenches or surface grab samples.

Parisien Lake Deformation Zone

Historical drilling at the recently acquired Parisien Lake Deformat ion Zone (PLDZ) intersected

palladium dominant mineralization in widely spaced holes over 600 metres of strike length. Recent

surface sampling by Grid in this area completed early in the fall confirmed surface values in grab

samples with a maximum value of 3.39 gpt Pd, 0.39 gpt Pt and 0.04 gpt Au hosted in a leucogabbro

with no visible sulphides . Platinum-palladium-gold (PGM) mineralization has been noted in drilling,

sampling and trenching over a strike length of more than one kilometer at PLDZ.

Grid plans to drill a number of holes on approximately 25 - 50 meter step outs from historical drill

hole PLZ 8 to test for the continuity of mineralization seen in that hole . The results from drill hole

PLZ 8 returned significant PGM values from surface to 138 meters depth as follows:

Note: 1000 ppb=1 gram/tonne ( gpt )

Drill Hole UTM E UTM N Azimuth

/ Dip

From

(m)

To

(m)

Interval

(m)

Pd

(ppb)

Pt

(ppb)

Au

(ppb)

Pd+Pt+Au

(ppb)

Cu

(ppm)

PDZ 8 410500 5141761 180/90 36.58 39.01 2.43 883 265 48 1196 973

And 61.57 73.15 11.58 1029 300 46 1375 580

Including 66.14 71.32 5.18 1945 476 87 2507 1109

And 85.04 87.78 2.74 1293 259 39 1590 697

Including 85.04 85.95 0.91 2811 634 81 3526 1250

And 111.86 119.79 7.93 113 22 433 567 537

And 134.72 154.53 19.81 430 125 33 588 668

Including 134.72 138.38 3.66 1142 296 55 1492 998

Central Zone

In 2002, Grid drilled six reconnaissance drill holes in the East Lobe of the intrusion located ~ 5 km

west of the Parisien Lake Deformation Zone. The six drill holes intercepted mineralization over a

strike length of approximately 1 kilometer ( holes were spaced approximately 200m apart ) Drilling

was highlighted by two intervals noted below:

• 28.0m grading 0.9 0 g/t PGM in ME 02-35. (0.63 gpt Pd, 0.23 gpt Pt and 0.0 4 gpt Au) A

subinterval in this hole returned 5.0m grading 1.86 gpt PGM (1.37 gpt Pd, 0.38 gpt Pt and

0.11 gpt Au). Mineralization started at 4.5m downhole.

• 20m @ 0.71 g/t PGM in drill hole ME02-34 spotted approximately 400m along strike from

ME02-35. (0.41 gpt Pd, 0.26 gpt Pt and 0.0 4 gpt Au_) Mineralization started at 27.0m

downhole Note: The intervals noted above are core width and not enough drilling has been

done to determine true width.

The Central Zone target was initially outlined by a property scale mapping and sampling program. It

represents a bulk tonnage zone for platinum group metals PGM mineralization. It is associated with

VTEM anomaly proximal to a property scale intrusive. Geophysical interpretation of the VTEM

survey will be incorporated into the upcoming drill program

Central Zone drilling will seek to establish the orientation and down dip poten tial of the zone . A

complete summary of analysis in the six holes drilled in the Central Zone are available on the Grid

Metals website under the East Bull Lake Property section.

South Zone

Located on strike to the southeast of the Central Zone, the South Zone represents a similar target to

the Central Zone but to date no drilling has been completed. Mineralization has been identified in

surface grab samples and trends east/west over a strike length of approximately 500 meters . It is

also associated with an airborne VTEM anomaly that has a strike extent of approximately 1,000

meters. Surface grab samples completed by Grid in 2001 along one of the cut grid lines returned

anomalous Pd, Pt and Au values over ~ 194m on a north south orientation. Within that envelope

ten consecutive samples taken along a grid line at 5 meter intervals returned an average of 1.35 g/t

PGM (0.72 gpt Pd, 0.57 gpt Pt and 0.07 gpt Au).

Company CEO Robin Dunbar noted “ East Bull is a large highly prospective property that needs a

systematic exploration approach to find economic zones of PGM mineralization. The extensive

academic research of East Bull has established its bona fides as an e xploration target. The large

exploration database compiled jumpstarts Grid to a position to be able test some initial prospective

drill targets which are associated with significant known PGM mineralization. ”

QA/QC

2019 sampling was of a systematic, reconnaissance nature, and generally large, approximately 1 kg grab

samples were collected from both mineralized and unmineralized outcrop exposures.

The 2001 trench and grab samples completed on the property were analyzed at XRAL Laborat ories in

Rouyn-Noranda Quebec using Fire Assay. Standards were inserted in the samples and a number of

duplicates were analyzed for quality control purposes.

Grab samples completed in 2019 were delivered to the ALS Canada preparation facility in Sudbury and

analysed at the Vancouver, British Columbia laboratory. Samples were analyzed for Cu, Ni, Pd, Pt, Au

and S using Inductively coupled plasma atomic emission spectroscopy (ICP-AES) analytical techniques.

Chain of custody was maintained throughout the entire procedure. Control samples including

Standards, Blanks, and Duplicates were incorporated as part of the QA/QC sampling procedures.

Historical drill results ME series were drilled by Grid Metals in 2002. Assays were completed using

conventional techniques at XRAL Laboratories in Rouyn Noranda.

Paul Davis P. Geo is overseeing the exploration at East Bull as a consultant to the Company and is a

Qualified Person under NI 43-101. He has reviewed and approved the scientific and technical

information in this release.

About Grid Metals Corp.

Grid Metals Corp. is an exploration and development Company that has a diversified portfolio of projects

in the nickel -copper-platinum group metal sectors. These commodities are vital to the emerging battery

metals, energy storage and automotive sectors. All of Grid's projects are located in secure North

American mining jurisdictions. The Company is focused on timely advancement of its property portfolio

through prudent exploration and development activities.

In addition to the East Bull Lake PGM Property Grid has ongoing development work at its Makwa Mayville

Nickel-Copper-PGM project located in Manitoba. The Company has ongoing work being completed

towards completion of an updated NI 43 -101 Preliminary Econ omic Assessment (PEA) of that project.

The existing PEA was completed in April 2014.

To find out more about Grid Metals, please visit www.gridmetalscorp.com.

On Behalf of the Board of Grid Metals Corp.

Robin Dunbar - President, CEO & Director

Telephone: 416-955-4773

David Black - Investor Relations

Email: [email protected]

Email: [email protected]

We seek safe harbour.

This news release contains forward -looking statements within the meaning of the United States Private

Securities Litigation Reform Act of 1995 and forward -looking information within the meaning of the

Securities Act (Ontario) (together, "fo rward-looking statements"). Such forward -looking statements may

include the Company's plans for its properties, the overall economic potential of its properties, the

availability of adequate financing and involve known and unknown risks, uncertainties and other factors

which may cause the actual results, performance or achievements expressed or implied by such forward -

looking statements to be materially different. Such factors include, among others, risks and uncertainties

relating to potential political risk, uncertainty of production and capital costs estimates and the potential

for unexpected costs and expenses, physical risks inherent in mining operations, metallurgical risk,

currency fluctuations, fluctuations in the price of nickel, cobalt, copper and other metals, completion of

economic evaluations, changes in project parameters as plans continue to be refined, the inability or

failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those

described in the Co mpany's Management Discussion and Analysis for the most recent financial period

and Material Change Reports filed with the Canadian Securities Administrators and available at

www.sedar.com.

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press

release.

This news release does not constitute an offer to sell or a solicitation of an offer to buy the securities

described herein in the United States. The securities described herein have not been and will not be

registered under the United States Securities Act of 1933, as amended, and may not be offered or

sold in the United States or to the account or benefit of a U.S. person absent an exemption from the

registration requirements of such Act.\