Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GRDM.V ·

Grid Outlines 4 km Copper ‘Corridor’ at the MM Copper/Nickel Project; Prepares to Commence Drilling

Exploration Programs

Grid Outlines 4 km Copper ‘Corridor’ at the MM Copper/Nickel Project;

Prepares to Commence Drilling

October 3 , 2024 TORONTO -- Grid Metals Corp. (TSXV:GRDM ; OTCQB:MSMGF) ( "Grid" or the

"Company") is pleased to provide results from its ongoing exploration program at its MM copper/nickel

project located in southeastern Manitoba. The program has recently been focused on the Eagle Gabbro

- host to the historical New Manitoba Cu -Ni sulfide deposit that was acquired by Grid last year. The

Company is preparing to commence its inaugural exploration drilling program at Eagle as well as a new

round of ground and airborne geophysical surveys over the entirety of its highly prospective Mayville

East - Eagle target area.

Highlights

• Surface copper/nickel mineralization confirmed in numerous outcrops over a ~4 km long target

trend associated with a gabbroic intrusive known as the 'Eagle gabbro.’ The Eagle gabbro is

located at the eastern end of the >20 km long Mayville-Eagle complex – host to the Company’s

32.0 Mt Mayville Cu -Ni (PGM) deposit1. Mineralization from twelve bedrock grab samples

collected during the current field campaign returned copper grades in the range 0.5-1.3% with

associated nickel, cobalt and precious metal values.

• Mineralization discovered to date is associated with a prominent magnetic anomaly.

• Drilling is expected to commence this Fall following receipt of exploration permits and the

program is fully-funded.

• A large airborne magnetic -EM survey is planned for the highly prospective eastern part of the

Mayville-Eagle complex, including the Eagle gabbro target area.

• A ground IP orientation survey is also planned to cover the best exposed, well -mineralized

segments of the Eagle gabbro.

• The initial area of drilling is planned for the New Manitoba deposit2 located at the southeast end

of the Eagle gabbro. This part of the property was acquired in 2023 and has seen very limited

exploration subsequent to drilling in the 1950s.

Dr. Dave Peck, P. Geo., Grid’s Vice President of Exploration, stated "Our consolidation of the major

copper/nickel deposits and occurrences within the Bird River greenstone belt, completed last year,

has provided the first opportunity for any Company to apply modern exploration methods and

concepts to the discovery of new massive and disseminated magmatic sulfide resources on all of the

prospective ground in this extremely well-endowed mineral belt. Our field review and compilation

work has shown the that Eagle gabbro, part of the ~20 km long Mayville -Eagle Complex located in

the northeast part of the belt, is a prime initial target area for delineating additional Mayville -style,

near surface, copper-dominant magmatic sulfide mineralization.”

Figure 1 : Map of Grid Metals Corp. Bird River Greenstone Belt Property holdings (MM Cu-Ni Project ) in SE

Manitoba located 150 northeast of Winnipeg. The north arm hosts the Mayville Cu-Ni Deposit1 (32 Mt with 0.40%

Cu and 0.16% Ni) and the ~4km long Eagle gabbro target that includes the New Manitoba deposit (red oval). The

south arm hosts the Makwa Ni-Cu Deposit 3 (14.2 Mt with 0.48%Ni and 0.11% Cu). Other deposits in the belt

include the Page and Ore Fault Deposits (optioned by Grid in 2023).

Figure 2: Chalcopyrite/pyrrhotite mineralization from the Eagle gabbro.

About the Eagle Gabbro

The Eagle gabbro is a >4 km long, northwest trending mafic intrusive body located at the eastern end of

the Mayville-Eagle Complex in the northernmost portion of the Bird River Greenstone Belt (see Figure

3). Magmatic sulfide mineralization observed in the Eagle gabbro is copper dominant with nickel, gold,

cobalt and PGM values. Mineralization predominantly occurs as disseminated sulfides with local

occurrences of net-textured and semi-massive sulfides.

The Eagle gabbro trend contains t he historical New Manitoba deposit which was optioned by Grid in

2023. A historical resource was defined at the New Manitoba area2 by drilling completed in the 1950’s

(Manitoba Mineral Inventory Card #217). Additional confirmation drilling was completed in 2009. One

of the 2009 drill holes (hole CL09 -06) intersected 24.5m averaging 0.77% Cu and 0.37% Ni from 55.5m

down hole in the interpreted northern extension to the New Manitoba deposit (see Manitoba Mines

Branch Assessment Report #74825). ( true width not determinable)

The New Manitoba area sits approximately 8 km to the southeast of Grid’s Mayville deposit, which

contains 32.0 million tonnes of pit-constrained indicated resources at 0.61% CuEq1. The Mayville deposit

remains open at depth and along strike as demonstrated by hole MAY23-03 that was completed in March

of last year and drilled below the current pit constrained resource. This hole intersected 147.6m (from

305.4m) with 0.41% Cu and 0.14% Ni including a 51.0m section averaging 0.63% Cu and 0.20% Ni (from

402.0m) and a higher-grade interval of 10.0m with 1.27% Cu and 0.45% Ni (from 409.0m). The estimated

true width of the intercept was approximately 90m. The sulfide textures, metal grades, metal rations

and host rock mineralogy are very similar to that seen in outcrops of the New Manitoba deposit.

Highlights from the ongoing field work at the Eagle gabbro include:

• Grab s amples taken from intermittent outcrop of the Eagle gabbro were focused on better

exposed areas including the New Manitoba deposit (~300m strike lengt h) and the Acme Zone

(~400m strike length) (see Figure 4).

• Mineralization from twelve bedrock grab samples collected early in the current field campaign

returned copper grades in the range 0.5 -1.3% along with associated nickel and precious metal

values. Additional assays are pending.

• The base metal grades and ratios observed in the 2024 field samples are strongly similar to those

reported from core samples from diamond drill holes completed in the New Manitoba area in

the 1950s, 1970s, and 2009.

• The metals suite (Cu+Ni+Co+Au+PGM) from the Eagle and Acme samples were found to be similar

to that found elsewhere in the 20km east–west Mayville Complex (the north arm of the Bird River

Greenstone Belt).

Table 1. Analytical results for selected grab sample collected during the early part of the 2024 field

campaign from the Eagle gabbro.

Magmatic Sulfide Mineralization

Sample# Area Easting Northing Source Cu (%) Ni (%) Co (%) Pd (g/t) Pt (g/t) Au (g/t) Description

C753229 New Manitoba 324445 5608702 Outcrop 1.32 0.21 0.02 0.10 0.06 0.12 Dissem slfd in gabbro

C753231 New Manitoba 324460 5608705 Outcrop 1.17 0.30 0.02 0.08 0.03 0.09 Dissem slfd in gabbro

1321645 Acme 323571 5610347 Outcrop 1.23 0.08 0.01 0.14 0.09 0.22 Dissem slfd in gabbro

171508 Acme 323620 5610192 Outcrop 0.98 0.19 0.01 0.15 0.05 0.18 Dissem slfd in gabbro

170862 Acme 323633 5610185 Outcrop 0.80 0.07 0.00 0.08 0.02 0.19 Dissem slfd in gabbro

1321887 Acme 323513 5610457 Trench 0.74 0.17 0.01 0.12 0.04 0.23 Dissem slfd in gabbro

171507 Acme 323626 5610192 Outcrop 0.71 0.15 0.01 0.12 0.04 0.11 Dissem slfd in gabbro

1321642 Acme 323650 5610336 Outcrop 0.69 0.07 0.01 0.10 0.04 0.14 Dissem slfd in gabbro

1321643 Acme 323650 5610336 Outcrop 0.65 0.08 0.01 0.11 0.05 0.15 Dissem slfd in gabbro

171538 Acme 323015 5610656 Outcrop 0.55 0.21 0.01 0.15 0.07 0.11 Dissem slfd in gabbro

Figure 3. Mayville-Eagle project area on colour shaded total magnetic intensity background image.

The most recent drilling results from the area are shown (Mayville deposit – Grid Metals, 2023); New

Manitoba - Clifton Star Resources, 2009).

147.6m @ 0.41%Cu, 0.14%Ni

24.5m @ 0.77%Cu, 0.4%Ni

32Mt 0.40%Cu, 0.16%Ni1

Figure 4. Outline of interpreted extent of the Eagle gabbro (black outline) – host to the New Manitoba

deposit and the Acme Zone, on colour shaded total magnetic intensity background image. Coloured

circles are copper grades from initial 2024 grab samples. New Manitoba area was drilled in the 1950’s

with follow up in the 1970’s and 2009 (see Footnote 2).

The MM Property and Bird River Greenstone Belt

• Grid’s MM copper/nickel project comprises 22,678 hectares of mineral rights in the Bird River

Greenstone Belt, approximately 150 northeast of Winnipeg.

• The Bird River Belt contains significant deposits of copper -nickel sulfide mineralization,

disseminated to massive stratiform chromite mineralization, low-sulfide PGM mineralization and

volcanic-hosted massive Cu-Zn sulfide mineralization. It has been shown to be analogous to the

McFaulds Lake (“Ring of Fire”) Greenstone Belt in northern Ontario (Source: Geological Survey

of Canada Open File Report 8722).

• The c urrent NI 43 -101 resources include Mayville (32.0 Mt with 0.40%Cu and 0.14% Ni) and

Makwa (14.2 Mt with 0.48% Ni and 0.11% Cu) . The exploration target/model features two

complementary goals, namely: (1) Define near surface resources of +75Mt to support a large -

scale concentrator fed by multiple open pits; and, (2) D iscover and delineate new high -grade

massive Cu-Ni-PGE deposits.

• In 2023, Grid acquired significant additional ground in the greenstone belt which included th e

historical New Manitoba deposit along with the Ore Fault and Page Deposits.

• The northern (Mayville arm) claims host copper dominant magmatic sulfide mineralization,

including the Mayville Deposit, along with significant chromite and PGM mineralization.

• The southern (Makwa arm) properties host nickel dominant magmatic sulfide mineralization

including the Makwa, Page and Ore Fault deposits.

• The mineralization at MM is predominantly magmatic sulfide and considerable metallurgical

testwork completed by the Company indicates that conventional flotation processing can

produce saleable copper and nickel concentrates.

• The Bird River Belt and the MM Property are located in the ancestral territory of the Sagkeeng

First Nation with whom Grid has an exploration agreement.

Footnotes

1 The Mayville deposit hosts a pit-constrained indicated mineral resource of 32.0 million tonnes with 0.40% Cu and 0.16% Ni.

See "NI 43-101 Technical Report on the Updated Mineral Resources Estimate of the Makwa-Mayville (MM) Project, Manitoba,

Canada" prepared by Micon International for Grid Metals Corp. (June 14, 2024).

2 The New Manitoba deposit is an outcropping disseminated magmatic sulfide deposit featuring a near surface, historical

resource estimate of 1.8Mt at 0.75% Cu and 0.33% Ni (Manitoba Mineral Inventory Card #217). The resource was estimated

from drilling completed in the 1950s and covers a strike length of ~300 metres and a vertical extent of ~150m. Note that the

Company has not been able to verify this historical estimate as relevant and the historical estimate should not be relied on.

3 The Makwa deposit hosts an indicated mineral resource of 14.2 million tonnes with 0.48% Ni including a higher -grade core

zone of 4.8 million tonnes with 0.89% Ni. See June 2024 Technical Report, referenced above.

Quality Assurance and Quality Control

Grid Metals applies best practice quality assurance and quality control ("QAQC") protocols on all of its

exploration programs. For the 2024 bedrock sampling program at the MM project and the 2023 drill

program at the Mayville property , surface grab or drill core samples were bagged and tagged and then

transported by secure carrier to the Actlabs (Thunder Bay) laboratory for sample preparation and

analysis for nickel, copper, cobalt and selected major and trace element abundances using a multi -acid

digestion method followed by ICP-OES analysis. Samples were also analyzed for Pd, Pt and Au using a

lead collection 30 g fire assay method followed by ICP-OES analysis. The Company is using two certified

reference materials ("CRMs") and one analytical blank for the MM exploration project to monitor

analytical accuracy and check for cross contamination between samples. The analytical results for the

two CRMs and the blank for MAK22-02 results reported here did not show any significant bias compared

to the certified values and the fell within the acceptable limits of variability.

Qualified Persons Statements

Dr. Dave Peck, P.Geo., is the Qualified Person for purposes of National Instrument 43 -101 and has

reviewed and approved the technical content of this release.

About Grid Metals Corp.

Grid Metals is focused on both lithium and copper/nickel projects in the Bird River area, approximately

150 km northeast of Winnipeg Manitoba. The MM Project consists of the Makwa and Mayville deposits

and covers a substantial portion of the Makwa and Mayville Complex which are part of the Bird River

Greenstone Belt. MM is a resource -stage project undergoing exploration and development work. The

Donner lithium project is a 75% owned property subject to a joint venture agreement. Grid has a lease

agreement on the True North mill where it rights to process feed from Donner. Grid also has an MOU

with Tantalum Mining Corporation of Canada Limited who operates the nearby producing Tanco Mine.

All of the Company’s southeastern Manitoba projects are located on the Traditional Lands of the

Sagkeeng First Nation with whom the Company maintains an Exploration Agreement.

On Behalf of the Board of Grid Metals Corp.

For more information about the Company, please see the Company website at

www.gridmetalscorp.com or contact:

Robin Dunbar - President, CEO & Director Telephone: 416-955-4773 Email: [email protected]

Brandon Smith – Chief Development Officer – [email protected]

David Black - Investor Relations Email: [email protected]

We seek safe harbour. This news release contains forward -looking statements within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the

Securities Act (Ontario) (togethe r, "forward-looking statements"). Such forward -looking statements include the