GRID METALS OUTLINES DRILLS WIDE INTERCEPTS OF NICKEL AT BANNOCKBURN NICKEL PROPERTY Commences Mineralogical Study on Project
GRID METALS OUTLINES DRILLS WIDE INTERCEPTS OF NICKEL AT BANNOCKBURN NICKEL PROPERTY
Commences Mineralogical Study on Project
Toronto, Ontario, March 11, 2022 – Grid Metals Corp. (the "Company") (TSXV:GRDM)(OTCQB:MSMGF)
today released the final results from the Bannockburn Nickel Property near Matachewan, Ontario and
~100 km south of the mining city of Timmins. Drilling from the 2021 program was focused on the bulk
tonnage nickel sulfide potential of the B Zone at the property.
HIGHLIGHTS – BANNOCKBURN PROPERTY 2021 DRILL PROGRAM
• Results from the final three of the eight holes completed in 2021 are reported together with
complete program assays.
• Overall the 2021 drilling outlined a mineralized zone with similar nickel grades and thickness to
Canada Nickel’s Crawford Deposit located north of Timmins, Ontario.
• The best result was 341.7 metres averaging 0.28% Ni in hole GBN21-03.
• The Company has engaged SGS Canada Inc. to complete a quantitative mineralogical study to
establish the abundance of potentially recoverable sulfide nickel from the B Zone.
• The new mineralogical work will complement a historical metallurgical test study completed by
SGS that showed a low-grade composite sample with 0.33% total nickel and ~70% sulfide nickel
could produce a 35% Ni concentrate.
• The 2021 drill program tested the B Zone over a strike length of 700 meters and to a maximum
vertical depth of 300 meters.
• The zone remains open in all directions.
Below: Selected analytical highlights for the Bannockburn 2021 drill program including previously
unreported results for drill holes GBN21-03, GBN21-05 and GBN21-07, B Zone target. There is
insufficient geological information available to estimate the true thickness of the reported intervals.
Hole
Number
From
(m)
To
(m)
Length
(m)
Ni
(%)
GBN21-01 71.50 232.39 160.89 0.24
inc. 103.00 125.56 22.56 0.30
with 118.00 125.56 7.56 0.38
GBN21-02 40.50 337.00 296.50 0.28
inc. 98.00 210.00 112.00 0.32
with 147.00 195.00 48.00 0.34
GBN21-03 39.30 381.00 341.70 0.28
inc. 256.50 321.00 64.50 0.30
GBN21-04 115.50 309.00 193.50 0.31
inc. 133.50 162.00 28.50 0.40
and 225.00 247.50 22.50 0.41
GBN21-05 49.70 219.00 169.30 0.20
inc. 79.50 105.00 25.50 0.27
GBN21-06 60.00 247.50 189.00 0.27
inc. 133.50 174.00 40.50 0.30
and 210.00 235.50 25.50 0.31
GBN21-07 36.00 405.00 369.00 0.24
inc. 160.50 273.00 112.50 0.27
with 231.00 273.00 42.00 0.29
GBN21-08 72.00 303.00 231.00 0.24
inc. 132.00 258.00 126.00 0.28
Bannockburn Property: Final Results for the 2021 B Zone Drilling Program
Drilling at Bannockburn targeted the B Zone, a >1 km long, steeply-dipping trend of bulk tonnage,
secondary nickel sulfide mineralization that exhibits similar nickel grades and thicknesses to Canada
Nickel’s (TSXV:CNC) Crawford nickel sulfide deposit. Hole specifications are provided in the Appendix
and locations are shown on the accompanying map. Total nickel analyses from the last three holes to
be reported are provided along with previously released highlights from the other holes completed
during the 2021 drilling campaign. Sulfur analyses (not shown here) were determined for approximately
50% of the samples submitted for nickel analysis. Sulfur contents typically varied between 0.05 and
0.15% for the intervals having the highest nickel grades. Holes GBN21-03 (341.7 metres of 0.28% Ni)
and GBN21-07 (369.0 metres of 0.24% Ni) both returned very wide intervals having typical B Zone nickel
grades. Hole GBN21-05 was drilled further to the west of the other 2021 holes and returned lower
average grades and widths – which the Company believes reflects the breaching of the western limit of
the B Zone mineralization. As with the previously announced drill holes, higher-grade subintervals were
noted in the new drill results with a maximum individual sample grade of 0.76% Ni and 0.22% S over a
1.5 metre core length in hole GBN21-07.
The 2021 drill program confirmed that there are large areas with enhanced nickel contents in the B Zone
trend with average nickel grades generally falling in the range 0.24 to 0.32% Ni over widths of >100 to
369 metres. These results are similar to those reported by Canada Nickel for their Crawford Deposit
nickel resources. The B Zone remains open to the east, north and south and at depth. It is also partly
open to the west.
Nickel data reported here are considered to represent total nickel and will include some percentage of
unrecoverable silicate-bound nickel. The Company has therefore engaged SGS Canada Inc. to complete
a quantitative mineralogical study on representative core samples from selected 2021 B Zone drill holes
to establish the abundance of potentially recoverable nickel sulfide present. This is the next critical step
toward confirming the potential for a bulk mineable open pit nickel sulfide resource at Bannockburn
having similar mineralogical and metallurgical characteristics to the Crawford deposit.
For context, a 2005 mineralogical and metallurgical study completed by SGS used a B Zone composite
sample averaging 0.33% total nickel and 0.10% sulfur. The study showed that the only nickel sulfide
mineral present in this composite was heazlewoodite containing an average of over 70% nickel, with
heazlewoodite accounting for over 70% of the total nickel present in the feed sample. The study
further demonstrated that a premium-grade concentrate containing up to 35% nickel could be
produced from this type of feed material using simple froth flotation concentration methods.
“The drill program at Bannockburn combined with new mineralogical test work will provide crucial
information as to the prospectivity of the B Zone to host a bulk tonnage nickel deposit capable of
producing a high grade nickel concentrate through standard flotation. From our historical work and the
2021 drilling and our forward looking mineralogical study we will have a solid information base to guide
next steps at the project” said Dave Peck, Vice President of Exploration and Business Development for
Grid Metals.
ABOVE. Location of 2021 Bannockburn property exploration drill holes including holes GBN21-03,
GBN21-05 and GBN21-07 - reported on for the first time in this release. The 2021 drilling targeted the B
Zone bulk nickel sulfide exploration target located in the northern ultramafic complex.
Massive Sulfide Zones
It is important to note that Bannockburn also hosts several zones of nickel-rich massive sulfides
including the C Zone where Grid has drilled 53 holes and where the zone remains open at depth. An
internal evaluation of the tonnage potential of all of the massive sulfide zones and of the remaining,
untested massive sulfide targets is underway and should be an important component of future project
development.
Quality Assurance and Quality Control
Grid Metals applies best practice quality assurance and quality control ("QAQC") protocols on all of its
exploration programs. For the Bannockburn drilling program, core was logged and sampled at the
Company’s temporary logging facility located near Matachewan, Ontario. From there the core was
trucked to the Company’s logging facility in Massey, Ontario where it was logged and sampled.
Standard 1.5 metre sample lengths were used. NQ size core was collected from all the drill holes.
Sampling involved cutting the core into approximately equal halves using a diamond saw. For the
Bannockburn project, samples were bagged and tagged and then transported by secure carrier to the
SGS (Burnaby) laboratory for sample preparation and analysis for total nickel, copper, cobalt and
selected major and trace element abundances using a sodium peroxide fusion total digestion
method. Approximately 50% of the samples reported in this news release were also analyzed for total
sulfur using a Leco infrared combustion method. The Company used two certified reference materials
("CRMs") and one analytical blank to monitor analytical accuracy and check for cross contamination
between samples. The analytical results for the two CRMs and the blank for the sample batches
reported here did not show any significant bias compared to the certified values and the results fell
within the acceptable limits of variability.
Dave Peck, P.Geo., has reviewed the contents of this press release and is the qualified person for
purposes of National Instrument 43-101.
GRANT UNDER INCENTIVE PROGRAM
The Company Board of Directors has approved the grant of a total of 2.85 million awards under the
Company’s Equity Incentive Plan (the “ Plan”) to employees, officers and directors of the Company. A
total of 1.55 million stock options were granted at $0.25 with a maximum term of five years. If not
exercised the options will expire on March 10, 2027 subject to earlier expiration in accordance with the
Plan. Included in the 2.85 million of awards were 1.3 million RSUs and DSUs which were granted to
officers and directors of the Company. All awards granted are subject to the Plan and applicable
policies of the TSX Venture Exchange.
About Grid Metals Corp.
Grid Metals Corp. has a portfolio of exploration and development stage properties focused on battery
metals which are located in the Provinces of Manitoba and Ontario, Canada Grid’s nickel-copper-PGM
portfolio includes: (1) the advanced exploration-stage Makwa-Mayville project in Manitoba, which has a
NI 43-101 compliant nickel copper PGM cobalt resource included in the 2014 PEA report authored by
RPA and Associates; (2) the exploration stage East Bull Lake Palladium project near Sudbury Ontario,
where the Company has had good success in its recent drilling activities; and, (3) the Bannockburn
Nickel project south of Timmins, Ontario, which is discussed in this release. Grid is also exploring the
Donner Lake Lithium Property in Manitoba and is currently drilling there.
To find out more about Grid Metals Corp., please visit www.gridmetalscorp.com.
On Behalf of the Board of Grid Metals Corp.
Robin Dunbar - President, CEO & Director
Telephone: 647 201 6844 Email: [email protected]
David Black - Investor Relations Email: [email protected] 416 955-4773
Appendix. Specifications for drill holes from the 2021 Bannockburn B Zone drilling program. Collar
coordinates are based on a NAD83 UTM Zone 17N projection.
Hole
Number
Easting
(m)
Northing
(m)
Elevation
(m)
Azimuth
(degrees)
Dip
(degrees)
Length
(m)
GBN21-01 506785 5313730 376 245 -65 250.23
GBN21-02 506785 5313730 376 245 -65 351.25
GBN21-03 506775 5313858 363 245 -65 408.00
GBN21-04 506704 5313991 363 245 -65 349.36
GBN21-05 506586 5313921 362 245 -60 224.00
GBN21-06 506634 5313746 362 65 -65 450.00
GBN21-07 506980 5313536 369 235 -65 402.00
GBN21-08 507077 5313506 364 205 -45 350.00