Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GRDM.V ·

Grid Metals Intersects High-Grade Cesium at the Falcon West Cesium Project including 14.0% Cs2O over 3.01m

Drill Results

Grid Metals Intersects High-Grade Cesium at the Falcon West Cesium

Project including 14.0% Cs2O over 3.01m

November 20, 2025 TORONTO -- Grid Metals Corp. (TSXV: GRDM; OTCQB: MSMGF) ("Grid" or

the "Company") is pleased to announce the first five assays from its 2025 cesium-focused drill

program at the 100% -owned Falcon West Cesium property (the "Property") . The Property is

located approximately 110 km east of Winnipeg , Manitoba. The drill target at Falcon West is

pollucite-hosted cesium mineralization within the Lucy South lithium -cesium-tantalum (“LCT”)

pegmatite. Lucy South is a highly fractionated, shallow, and flat-lying pegmatite which is located

approximately 500 metres off the Trans-Canada highway. Initial 2025 drilling has intersected the

Lucy South pegmatite including a strongly fractionated core zone carrying high grades of cesium,

lithium and rubidium.

Highlights from the first five drill holes include:

• 1.73 metres with 14.0% Cs 2O, 1.71% Li 2O and 0.36% Rb 2O (LU25-01; from 27.1 metres)

including 0.42 metres with 27.4% Cs2O

• 3.01 metres with 14.0% Cs2O and 0.50% Rb2O (LU25-03; from 31.5 metres) including 0.61

metres with 24.2% Cs2O and 0.50 metres with 24.7% Cs2O

• 2.90 metres with 9.6 % Cs2O and 1.85% Li2O (LU25-04; from 25.8 metres) including 0.85

metres with 19.6% Cs2O

The Company is in the process of completing approximately 70 drill holes, focused on delineating

the initial near-surface strike and extent of the Lucy South pegmatite and the distribution of

cesium within it. The current drill program is the first concerted effort to define the potential for

a cesium resource at the Property . The Company is pleased to note that the cesium

mineralization in the first five drill holes appears to be primarily associated with the mineral

pollucite, the preferred mineral for cesium chemical processing.

Dr. Dave Peck, P. Geo., Grid’s Vice President of Exploration, stated "Our Falcon West cesium drill

program is off to a great start with hole LUC25-03 returning the highest cesium grade-thickness

intercept ever recorded at the Property and one of the highest grade-thickness cesium intercepts

reported in recent years, globally. Cesium grades north of 20% in drill core are exceptionally rare,

marking the Lucy South pegmatite and the Falcon West property as a notable geological target.”

Robin Dunbar, CEO of Grid Metals, commented, “Cesium is one of the rarest and most sought -

after critical metals with a growing number of strategic applications. In the last several months ,

it has been designated a critical metal by both the U.S. and Canadian governments. The cesium

market is facing a global shortfall of feedstock to supply a growing number of applications

including defense applications and next-generation solar panels. We are off to a positive start in

our efforts to demonstrate that Falcon West has the potential to develop into a global ly

significant cesium project to support a North American focused cesium supply chain.”

Drill Results Discussion

The current area of exploration interest is the near-surface portion of the Lucy South pegmatite

where several recent exploration campaigns identified high cesium values. The initial area of

interest is a n approximate 150x40 m area where the Lucy South pegmatite is within ~35 m of

surface. In th is initial phase , a substantial portion of the target area will be drill ed at closely

spaced centres.

To date, drilling has identified a distinct zonation pattern of mineralization within the Lucy South

pegmatite. Zonation consists of a wall zone on the margins of the pegmatite with variably

developed internal subzones enriched in cesium (pollucite +/- biotite), lithium (spodumene +/ -

lepidolite), rubidium ( feldspar +/ - biotite) and tantalum (presumed to be associated with

columbo-tantalite). The discrete nature of the pegmatite and the distinctive mineral assemblage

provides a well-defined exploration target for the ongoing and future drill programs.

Figure 1: Map of Lucy South target area with interpreted pierce points into the top of the flat -

lying Lucy South LCT pegmatite projected to surface for holes LU25-01 to LU25-05 and previous

holes completed in this area.

Figure 2: Drill-defined locations of the Lucy South and Artdon LCT pegmatites overlain on a total

field magnetic image based on the Company’ s fall 2024 fixed -wing magnetic and radiometric

survey. The d otted white line identifies the current regional exploration target that follows an

extensive magnetic low anomaly that hosts both the Artdon and Lucy South pegmatites. The

latter two areas may be part of a single LCT pegmatite – but are separated by several hundred

metres where no drilling has yet occurred.

Next Steps

As discussed, t he Company is planning to complete approximately 70 drill holes by the end of

2025 with all holes targeting Lucy South within approximately 35 m of surface. Based on the

success of the current program, a follow-up program would likely commence in January 2026.

Table 1: Analytical Results for Drill Holes LU25 -01 to LU25 -05, Lucy South cesium target. See

Appendix for hole locations. Note the true thickness for each interval reported is estimated to

represent between 90% and 100% of the reported interval lengths.

Hole ID

From

(m)

To

(m)

Length

(m)

Cs2O

(%)

Li2O

(%)

Rb2O

(%)

Ta2O5

(ppm) Comments

LU25-01 22.80 29.55 6.75 3.70 2.25 0.26 93.4 Li-Cs-Rb Enriched Section

inc. 24.30 28.83 4.53 5.45 3.04 0.16 95.0 Spodumene-rich Section

with 27.10 28.83 1.73 14.0 1.71 0.36 94.6 Pollucite-rich Section

LU25-02 27.07 32.50 5.43 0.16 1.81 0.34 213 Li-Cs-Rb Enriched Section

inc. 27.94 30.53 2.59 0.18 2.89 0.08 345 Spodumene-rich Section

LU25-03 28.64 42.58 13.94 3.10 0.72 0.27 116 Li-Cs-Rb Enriched Section

inc. 29.67 30.43 0.76 0.06 3.28 0.25 50.8 Spodumene-rich Section

and 31.49 34.50 3.01 14.0 0.21 0.50 24.9 Pollucite-rich Section

and 37.95 40.08 2.13 0.19 2.19 0.03 425 Spodumene-rich Section

LU25-04 25.10 28.70 3.60 7.73 1.57 0.25 172 Li-Cs-Rb Enriched Section

inc. 25.80 28.70 2.90 9.57 1.85 0.24 204 Pollucite-rich Section

LU25-05 26.07 35.00 8.93 0.26 0.41 0.97 143 Li-Cs-Rb Enriched Section

inc. 26.07 29.87 3.80 0.26 0.08 1.89 3.92 Rb Enriched Section

and 33.80 34.30 0.50 2.05 0.86 0.84 7.54 Pollucite-rich Section

Quality Assurance and Quality Control

The Company’s ongoing exploration program at the Falcon West lithium property is being

supervised by Dave Peck, P.Geo. Grid Metals applies best practice quality assurance and quality

control ("QAQC") protocols on all of it’s exploration programs. For the current program all core

was logged and sampled at the Company’s core facility located on its Makwa nickel property.

Generally, 1.0 metre sample lengths were used. Samples were bagged and tagged and then

transported by secure carrier to the Activation Laboratories facility in Ancaster, Ontario for

sample preparation and analysis for lithium, cesium, rubidium, tantalum and selected major and

trace element abundances using a sodium peroxide fusion total digestion method followed by

ICP-OES and ICP-MS analysis. The Company is using two rare metal certified reference materials

("CRMs") and an analytical blank for the program to monitor analytical accuracy and check for

cross contamination between samples. The blank and CRM results for the reported interval s

were determined to fall within the accepted range of deviation from the certified values.

Dr. Dave Peck, P.Geo., the Company’s Vice President, Exploration, has reviewed and approved

the technical information contained in this release.

About Grid Metals Corp.

Grid Metals is focused on exploration and development in southeastern Manitoba with four key

projects in the Bird River area.

1) The Makwa Property (Ni -Cu-PGM-Co), which is subject to an Option and Joint Venture

Agreement with Teck Resources Limited (“Teck”) . Teck can earn up to a 70% interest in

Makwa by incurring a total of CAD$17.3 million, comprising project expenditures

(CAD$15.7 million) and cash payments or equity participation (CAD$1.6 million) with Grid.

Makwa is located on the south arm of the Bird River Greenstone Belt.

2) The Mayville Property (Cu-Ni) is located on the north arm of the Bird River Greenstone

Belt. The property is owned subject to a minority interest.

3) The Falcon West Property (Li -Cs) is located 110 km east of Winnipeg along the Trans -

Canada highway and contains highly anomalous cesium values including 3.0 m at 14.0%

Cs2O and 2.2 m at 15.0% Cs2O.

4) The Donner Property (Li-Cs) is adjacent to the Mayville Property, and Grid owns 75% of

the project.

All of the Company’s southeastern Manitoba projects are located on the ancestral lands of the

Sagkeeng First Nation with whom the Company maintains an Exploration Agreement.

On Behalf of the Board of Grid Metals Corp.

For more information about the Company, please visit our website at www.gridmetalscorp.com

or contact:

Robin Dunbar – President, CEO & Director – [email protected]

Brandon Smith – Chief Development Officer – [email protected]

David Black – Investor Relations – [email protected]

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

We seek safe harbour. This news release contains forward-looking statements within the meaning of the

United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the

meaning of the Securities Act (Ontario) (togethe r, "forward-looking statements"). Such forward -looking

statements include the Company’s intended use of proceeds and receipt of regulatory approvals , th e

overall economic potential of its properties, the availability of adequate financing and involve known and

unknown risks, uncertainties and other factors which may cause the actual results, performance or

achievements expressed or implied by such forward -looking statements to be materially different. Such

factors include, among others, risks and uncertainties relating to potential political risk, uncertainty of

production and capital costs estimates and the potential for unexpected costs and expenses, physical risks

inherent in mining operations, metallurgical risk, currency fluctuations, fluctuations in the price of nickel,

cobalt, copper and other metals, completion of economic evaluations, changes in project parameters as

plans continue to be refined, the inability or failure to obtain adequate financing on a timely basis, and

other risks and uncertainties, including those described in the Company's Management Discussion and

Analysis for the most recent financial period and Material Change Reports filed with the Canadian

Securities Administrators and available at www.sedarplus.ca.

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press

release.

Appendix: Drill hole specifications. Collar coordinates are based on the NAD 83 datum and the UTM Zone

15N projection.

Drill

Hole

Easting

(m)

Northing

(m)

Elevation

(m)

Length

(m)

Azimuth

(°)

Dip

(°)

LU25-01 321671 5502642 329.2 42.0 0 -90

LU25-02 321671 5502642 329.2 42.0 350 -74

LU25-03 321671 5502642 329.2 51.0 40 -66

LU25-04 321676 5502659 328.5 42.0 0 -90

LU25-05 321676 5502659 328.5 42.0 10 -66