Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GRC.TO ·

Gold Springs Resource News from Drilling Activities at White Point

Exploration Programs

Page 1

Gold Springs Resource

News from Drilling Activities at White Point

Vancouver, October 1, 2021

Gold Springs Resource Corp. (TSX: GRC, OTCQB: GRCAF) (the “ Company” or “GRC”) is

pleased to announce that it has now completed 9 holes on the White Point target as part

of the 27,300 meters, 2021 RC drilling program at its flagship Gold Springs project located

in USA, on the border of Nevada and Utah, one of the best mining jurisdictions in the

world.

Randall Moore, Vice President of Exploration stated “We are encouraged by what we see

from this first pass drill program at White Point , especially with the length of the vein

intervals ranging up to 126.5 meters in the drill holes. As the results generated from surface

sampling at White Point show a strong gold correlation with the veins , we are now looking

forward to the assay results in October.”

White Point Target

White Point is located in Nevada, 400 meters west of the Grey Eagle resource along the

same strong northwest trending ZTEM high resistivity measuring 800 meters wide and

2,000 meters long . The Grey Eagle resource occupies the southern portion and White

Point the northwest extension of this ZTEM anomaly.

White Point is characterized by an outcrop ping, gold bearing, sheeted vein zone

consisting of individual veins ranging from a few centimeters to over 5 meters in

thickness. This vein zone is over 200 meters wide and can be followed along strike for

400 meters with possible extensions under the younger post -mineral rocks. Several

historical mines exploited both the individual veins and sheeted vein zones and GRC

sampling has generated grades of up to 8.4 g/t gold from these historical workings and

13.9 g/t gold from individual veins.

The 9 holes were drilled to test the subsurface in the areas of vein exposures and some

of the projections under the younger cover. Of the 9 holes, 8 encountered significant vein

intervals with composited lengths ranging from 24.4 meters to 126.5 meters, averaging

67.4 meters. These same quartz-calcite veins are exposed on surface along with silicified

breccias, and extensive stockwork veining. The drill coverage test ed an area 250x250

meters which will be expanded once the assa ys are received in October and the

interpretation of the control of the gold mineralization is completed.

For more information , please visit: https://goldspringsresource.com/projects/target-

with-drilling/the-white-point-target/

Page 2

Gold Springs 2021 drill holes and resource locations

Qualified Person

The Qualified Person on the Gold Springs Project is Randall Moore, Executive Vice

President of Exploration for Gold Springs Resource Corp. He has reviewed and approved

the scientific and technical content of this press release.

About Gold Springs Resource Corp.

Gold Springs Resource Corp. (TSX: GRC and OTCQB: GRCAF) is focused on the

exploration and expansion of the gold and silver resources of its PEA-stage Gold Springs

project located in USA at the border of Nevada and Utah, one of the best mining

jurisdictions in the world.

Gold Springs Resource Corp. Contact:

Antonio Canton, President and CEO

[email protected]

Page 3

Forward Looking Statements

Certain statements contained herein constitute “forward -looking information” under

applicable Canadian securities laws (“forward -looking statements”). Forward -looking

statements look into the future and provide an opinion as to the effect of certain events and

trends on the business. Forward-looking statements may include words such as “creating”,

“believe”, “would”, “continue”, “will”, “promising”, “should”, and similar expressions. These

forward-looking statements are based on current expectations and entail various risks and

uncertainties. Actual results may materially differ from expectations if known and unknown

risks or uncertainties affect our business or if our estimates or assumptions prove

inaccurate. Factors that could cause results or events to d iffer materially from current

expectations expressed or implied by the forward -looking statements, include, but are not

limited to, risks of the mineral exploration industry which may affect the advancement of

the Gold Springs project, including possible variations in mineral resources, grade, recovery

rates, metal prices, capital and operating costs, and the application of taxes; availability of

sufficient financing to fund planned or further required work in a timely manner and on

acceptable terms; availability of equipment and qualified personnel, failure of equipment or

processes to operate as anticipated, changes in project parameters, including water

requirements for operations, as plans continue to be refined; regulatory, environmental and

other risks of the mining industry more fully described in the Company’s Annual Information

Form and continuous disclosure documents, which are available on SEDAR

at www.sedar.com. The assumptions made in developing the forward-looking statements

include: the accuracy of current resource estimates and the interpretation of drill,

metallurgical testing and other exploration results; the continuing support for mining by

local governments in Nevada and Utah; the availability of equipment and qualified personnel

to advance the Gold Springs project; execution of the Company’s existing plans and further

exploration and development programs for Gold Springs, which may change due to changes

in the views of the Company or if new information arises which makes it prudent to change

such plans or programs. Readers are cautioned not to place undue reliance on the forward-

looking statements contained in this press release. Except as required by law, the Company

assumes no obligation to update or revise any forward -looking statement, whether as a

result of new information, future events or any other reason. Unless otherwise indicated,

forward-looking statements in this press release describe the Company’s expectations as

of the date hereof.