Files Technical Report for Updated Mineral Resource Estimate

July 15, 2022, Vancouver, BC - Gold Springs Resource Corp. (TSX: GRC, OTCQB: GRCAF) (the

“Company” or “GRC”) announces that further to its press release of June 13, 2022, and in

accordance with National Instrument 43-101, the Company has filed a “Mineral Resource

Estimate NI 43-101 Technical Report - Gold Springs Project Utah-Nevada, USA" (the “Technical

Report”) with an effective date of June 13, 2022 and an issue date of July 11, 2022.

The Technical Report was prepared by Terre Lane, MMSA, SME; Hamid Samari, PhD (GRE),

MMSA; and J. Todd Harvey, PhD (GRE), SME, all of Global Resource Engineering, Ltd and

is available on the Company’s profile on SEDAR and on the Company’s website.

The mineral resource estimate for the Gold Springs Project, as set out in the Technical

Report, is reproduced below and no longer includes gold equivalent figures. The estimate

is not materially different from the mineral resource estimate disclosed in the Company’s

news release of June 13, 2022.

Updated Mineral Resource Estimate – Gold Springs Project *

Category

$1,800 Pit Constrained - 0.25 g/t gold cutoff

Tonnes

(1000s)

Au Ag

Grade

(g/t)

Troy oz

(1000s)

Grade

(g/t)

Troy oz

(1000s)

Measured 26,168 0.52 437 9.26 7,789

Indicated 23,466 0.51 388 6.10 4,600

Measured & indicated 49,634 0.52 825 7.76 12,390

Inferred 8,220 0.46 122 5.17 1,367

* With an effective date of 13 June 2022 and based on the drilling results as of 31.12.2021

The inferred resource is in addition to the measured and indicated resource. Numbers have been rounded,

which may lead to some numbers not adding up exactly. Mineral resources that are not mineral reserves

do not have demonstrated economic viability. The resource estimate reflects gross metal content that is

not adjusted for metallurgical recoveries.

Page 2

The updated resource estimate broken down by deposit (pit) is as follows:

Category

Deposit

$1,800 Pit Constrained - 0.25 g/t gold cutoff

Tonnes

(1000s)

Gold Silver

g/t Troy oz

(1000s)

g/t Troy oz

(1000s)

Measured

North Jumbo & Tremor 15,752 0.47 240 10.88 5,510

South Jumbo 6,457 0.55 115 5.99 1,244

Grey Eagle 2,852 0.65 59.4 7.23 663

Charlie Ross 0 0 0

White Point 0 0 0

Thor 1,107 0.65 23.1 10.48 373

Total 26,168 0.52 437 9.26 7,789

Indicated

North Jumbo 5,509 0.39 69.4 6.82 1,209

South Jumbo 5,657 0.55 100 4.67 849

Grey Eagle 4,433 0.59 84.3 7.03 1,002

Charlie Ross 4,943 0.56 88.3 6.23 990

White Point 1,274 0.39 16.1 3.81 156

Thor 1,650 0.56 29.9 7.43 394

Total 23,446 0.51 388 6.10 4,600

Measured

&

Indicated

North Jumbo 21,261 0.45 309 9.83 6,718

South Jumbo 12,115 0.55 215 5.37 2,092

Grey Eagle 7,285 0.61 144 7.11 1,666

Charlie Ross 4,943 0.56 88.3 6.23 990

White Point 1,274 0.39 16.1 3.81 156

Thor 2,757 0.60 52.9 8.65 767

Total 49,634 0.52 825 7.76 12,390

Inferred

North Jumbo 1,725 0.38 20.9 4.51 250

South Jumbo 2,929 0.38 35.5 2.99 282

Grey Eagle 783 0.39 9.8 5.90 148

Charlie Ross 1,122 0.60 21.7 8.68 313

White Point 113 0.31 1.1 2.69 9.8

Thor 1,549 0.66 33.1 7.30 364

Total 8,220 0.46 122 5.17 1,367

The inferred resource is in addition to the measured and indicated resource. Mineral resources that

are not mineral reserves do not have demonstrated economic viability. Numbers have been rounded,

which may lead to some numbers not adding up exactly. The resource estimate reflects gross metal

content that is not adjusted for metallurgical recoveries.

Qualified Person

The Qualified Person on the Gold Springs Project is Randall Moore, Executive Vice

President of Exploration for Gold Springs Resource Corp., and he has reviewed and

approved the content of this press release.

Page 3

About Gold Springs Resource Corp.

Gold Springs Resource Corp. (TSX: GRC and OTCQB: GRCAF) is focused on the

exploration and expansion of the gold and silver resources of its Gold Springs project

located on the border of Nevada and Utah, USA. The project is situated in the prolific Great

Basin of Western USA, one of the best mining jurisdictions in the world.

Gold Springs Resource Corp. Contact:

Antonio Canton, President and CEO

[email protected]

Forward-Looking Statements

Certain statements contained herein constitute “forward-looking information” under applicable

Canadian securities laws (“forward-looking statements”). Forward-looking statements look into the

future and provide an opinion as to the effect of certain events and trends on the business. Forward-

looking statements may include words such as “creating”, “believe”, “would”, “continue”, “will”,

“promising”, “should”, and similar expressions. These forward-looking statements include, but are

not limited to, the statements relating to the release of another resource estimate and PEA by the

end of 2022, the goal of completing the mine permitting process within two years, the significant

potential to expand resources at the Gold Springs Project, and the potential to mine the resources by

shallow open pit and a technically simple heap -leach operation, and are based on current

expectations and entail various risks and uncertainties. Actual results may materially differ from

expectations if known and unknown risks or uncertainties affect our business or if our estimates or

assumptions prove inaccurate. Factors that could cause results or events to differ materially from

current expectations expressed or implied by the forward -looking statements, include, but are

not limited to, risks of the mineral exploration industry which may affect the advancement of the

Gold Springs project, including possible variations in mineral resources, grade, recovery rates, metal

prices, capital and operating costs, and the application of taxes; availability of sufficient financing to

fund planned or further required work in a timely manner and on acceptable terms; availability of

equipment and qualified personnel, failure of equipment or processes to o perate as anticipated,

changes in project parameters, including water requirements for operations, as plans continue to be

refined; regulatory, environmental and other risks of the mining industry more fully described in the

Company’s Annual Information Form and continuous disclosure documents, which are available on

SEDAR at www.sedar.com. The assumptions made in developing the forward-looking statements

include: the accuracy of current resource estimates and the interpretation of drill, metallurgical

testing and other exploration results; the continuing support for mining by local governments in

Nevada and Utah; the availability of equipment and qualified personnel to advance the Gold Springs

project; execution of the Company’s existing plans and further exploration and development

programs for Gold Springs, which may change due to changes in the views of the Company or if new

information arises which makes it prudent to change such plans or programs. Readers are cautioned

not to place undue reliance on the forward-looking statements contained in this press release. Except

as required by law, the Company assumes no obligation to update or revise any f orward-looking

statement, whether as a result of new information, future events or any other reason. Unless

otherwise indicated, forward-looking statements in this press release describe the Company’s

expectations as of the date hereof.