Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GRBM.CN ·

Green Bridge Metals Clarifies Certain Technical Disclosure

Technical Reports (NI 43-101) Regulatory & Compliance

Suite 800, 1199 West Hastings Street

Vancouver, British Columbia, V6E 3T5

www.greenbridgemetals.com

NEWS RELEASE

Green Bridge Metals Clarifies Certain Technical Disclosure

Vancouver, Canada – August 2, 2024 – Green Bridge Metals Corporation (CNSX: GRBM, OTCQB:

GBMCF, FWB: J48, WKN: A3EW4S ) ("Green Bridge" or the " Company") wishes to clarify certain

technical disclosure, as detailed below, following a technical disclosure review by the Mining Group in

the Corporate Finance Division of the British Columbia Securities Commission (the “BCSC”).

The Company has not completed adequate work to develop a resource estimate in compliance with

National Instrument 43-101 (“NI 43-101”) at the SCZ project. In addition, the Company wishes to clarify

that its Chrome Puddy project is in the exploration stage , and that, contrary to National Instrument 43-

101 – Standards of Disclosure for Mineral Projects (“NI 43 -101”), the mineral resource estimate

previously disclosed by the Company in respect of the project is not supported by a NI 43-101 compliant

technical report and should not be relied upon unless and until it is supported by a NI 43-101 compliant

technical report.

Furthermore, the Company clarifies the following disclosures in its investor presentation, news releases

and website:

a. disclosures relating to historical estimates in respect of its Chrome Puddy project do not contain

the supporting disclosures required by section 2.4 of NI 43 -101; accordingly, the Company

restates this information as follows:

“A historical mineral resource based on limited drilling south of Puddy Lake was

presented in 1966 by Commerce Nickel Mines Ltd. (CNML). CNML reported a

nickeliferous magnetite mineral resource estimate of 30 million tons grading 0.27%

Ni, 0.017% C o and 7.2% recoverable Fe to a depth of 400 ft (122 m) (Annual Report

1966). This historical mineral resource estimate was calculated prior to the

implementation of the standards for disclosure set forth in NI 43- 101 and current

CIM standards for mineral resource estimation. The historical drill and assay results

were reported in a manner that was consistent with the exploration practices at that

time. Diamond drill holes by CNML , that are the basis of the historical mineral

resource, are presented on maps that can be reasonably accurately located on the

basis of lakeshore and topo graphic features and the logs for such diamond drill

holes are available in public files, as are the 1965 assay certificates by Technical

Laboratory Services, which was a reputable assay lab. A longitudinal section

evaluation of relatively widely spaced drill intersections shows continuity of

mineralization and that the reported tonnage and grade estimates are reasonable.

However there have been no independent validations of the historical assay drill

core results and the assumptions, parameters a nd methods used to prepare the

historical estimate are not all known. Resource definitions, terminology, and

reporting standards have changed significantly since these series of reports. The

estimate is considered historical in nature and a QP has not done sufficient work to

independently validate the assay drill core results and evaluate these resources as

Suite 800, 1199 West Hastings Street

Vancouver, British Columbia, V6E 3T5

www.greenbridgemetals.com

current resources. Therefore, the Company is treating the estimate as historical in

nature.

b. disclosures regarding certain exploration information were not supported by data verifications

required by sections 3.2 and 3.3 of NI 43-101; accordingly, the Company restates this information

to include the following:

“All sample results are considered historic al and are from samples that were not

collected by the Company. The QP has not done sufficient work to validate the

assay drill core results, nor to verify sample collection methods, analyses, or QA/QC

information for these samples.”

c. concerning disclosures relating to the Crawford deposit nearby to the Chrome Puddy project, the

Company notes that such disclosures relate solely to the Crawford deposit, in which the

Company does not hold an interest, and that there can be no assurance that the Company will

obtain similar information or results from the Chrome Puddy project nor is the Company implying

that it will obtain similar results on the Chrome Puddy project;

i. concerning drilling target information, the Company notes that such information did

not contain the supporting disclosures required by Section 2.3(2) of NI 43 -101,

accordingly, the Company re-states this information as follows:

“Based on historically reported mineralized drill holes over a 1.9 km strike length

the Company has an exploration target estimated at 25 to 50 Mt at a grade of 0.25%

to 0.30% Ni which it will endeavour to validate and refine by upcoming surface

exploration and airborne geophysical surveys. However, the Company notes that

the potential quantity and grade of the exploration target is conceptual in nature,

and that there has been insufficient exploration to define a mineral resource and

that it is uncertain if further exploration will result in the target being delineated as a

mineral resource.”;

ii. concerning the “Sample Results” disclosed, the Company provides verifications

pursuant to Sections 3.2 and 3.3 of NI-43-101 as follows:

“All sample results are considered historical and were not collected by the Company.

The QP has not done sufficient work to independently validate the assay drill core

results, nor to verify the sample data.”

iii. With respect to t he Company’s disclosures contained in its presentations, website

and news releases relating to adjacent and regional projects, the Company clarifies

that such disclosures relate solely to adjacent and regional projects in which the

Company does not hold an interest, and that there can be no assurance that the

Company will obtain similar information or results from its own projects regardless of

proximity, nor is the Company implying that it will obtain similar results on its own

projects.

The Company has removed the above-mentioned investor presentations and technical disclosures from

its website, and notes that investors should not rely upon the information which the Company is retracting

by way of this news release.

Suite 800, 1199 West Hastings Street

Vancouver, British Columbia, V6E 3T5

www.greenbridgemetals.com

In addition, the Company notes disclosures contained in the Chrome Puddy Report are not compliant

with NI 43 -101 and should not be relied upon unless and until such disclosures are supported in

compliance with NI 43- 101 by an updated report. The Company intends to file a new technical report

relating to its Chrome Puddy project by August 8, 2024.

Michael Dufresne, M.Sc., P. Geol, P. Geo, is an independent qualified person as defined under NI 43-

101 who supervised the preparation of and approves the scientific and technical content of this news

release.

About Green Bridge Metals

Green Bridge Metals Corporation (formerly Mich Resources Ltd.) is a Canadian based exploration

company focused on acquiring ‘battery metal’ rich mineral assets and the development of the South

Contact Zone (the “Property”) along the basal contact of the Duluth Intrusion, north of Duluth, Minnesota.

ON BEHALF OF GREEN BRIDGE METALS

“David Suda”

President and Chief Executive Officer

For more information, please contact:

David Suda

President and Chief Executive Officer

Tel: 604.928-3101

[email protected]

Forward Looking Information

Certain statements and information herein, including all statements that are not historical facts, may

contain forward-looking statements and forward -looking information within the meaning of applicable

securities laws. Such forward-statements include, but are not limited to, statements with respect to future

exploration work on the properties of the Company and upcoming surface exploration and airborne

geophysical surveys and potential results therefrom. Although management of the Company believe

that the assumptions made and the expectations represented by such statements or information are

reasonable, there can be no assurance that forward-looking statements or information herein will prove

to be accurate. Forward-looking statements and information by their nature are based on assumptions

and involve known and unknown risks, uncertainties and other factors which may cause actual results,

performance or achievements, or industry results, to be materially different from any future results,

performance or achievements expressed or implied by such forward-looking statements or information.

The Company does not undertake to update any forward-looking information, except in accordance with

applicable securities laws.

Neither the Canadian Securities Exchange (the “ CSE”) nor its Regulation Services Provider (as that

term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this

release.