Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GQC.V ·

GoldQuest Reports Potential Depth Extension at Romero Gold-Copper Project, Dominican Republic

Corporate Updates

GoldQuest Reports Potential Depth Extension

at Romero Gold-Copper Project, Dominican

Republic

Vancouver, British Columbia--(Newsfile Corp. - April 22, 2026) -

GoldQuest Mining Corp. (TSXV: GQC)

(OTCQX: GDQMF)

("GoldQuest" or the "Company") is pleased to report preliminary visual results from

the ongoing exploration drilling program at the Romero deposit in the Dominican Republic.

Recent drill holes LTP-182 and LTP-183 have intersected zones of favorable alteration and

mineralization consistent with the Romero deposit style, located outside the current mineral resource

block model. These results support the potential extension of mineralization both at depth and along

trend of the known mineralization.

Highlights:

Potential Continuity Beyond Current Resource Limits:

Intersected mineralization beyond the

current resource model boundaries.

Consistent Mineralization Style

: High-grade mineralization indicators observed are consistent

with the main Romero deposit.

Open System

: The Romero mineralized system remains open at depth and laterally along strike.

Drill Results Summary:

Hole LTP-182

: 75-metres step back from hole LTP-137, intersected zones of favourable alteration

and mineralization from 220 m to 270 m, and again from 413.75 m to its current depth of 449.73 m

(Figures 1, 2 and 3)

Hole LTP-183

: 140 m step back from hole LTP-118. Located to the north-northeast of the main

mineralized zone, this hole intersected favourable mineralization from 510 m to its current depth of

555.1 m (Figures 4 and

5).

Although both drill holes LTP-182 and LTP-183 are currently still in mineralization, the current drill rigs

have reached their depth capacity. As such, drilling on both holes has been temporarily suspended. The

Company is currently mobilizing a more capable replacement drill rig. The new rig is being installed at

hole LTP-183 to advance it to its target depth, after which it will be moved to complete hole LTP-182. It is

anticipated that drilling will resume by late April.

Geological Interpretation:

The intercepts are visually associated with pyrite-chalcopyrite-sphalerite mineralization, accompanied by

moderate to high silica alteration. This mineral assemblage is consistent with the main Romero mineral

deposit, supporting the interpretation that these intercepts represent a continuation of the same

mineralizing system. Core from both holes is currently being logged, split, and prepared for shipment to

the laboratory for assaying. Assays are expected to be received by early June.

Figure 1: Drill Progress at Romero

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1663/293708_8d7c7190a446fa07_001full.jpg

Figure 2: LTP-182 cross section showing PFS Block Model and Mine Design. Intervals highlighted in

thick red corresponds to observed chalcopyrite from 220 m to 270 m, and from 413.75 m to the its

current depth of 449.73 m.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1663/293708_8d7c7190a446fa07_002full.jpg

Figure 3: Core from hole LTP-182.

A

: 268.3 m depth. Dacite Tuff with moderate silicification,

chalcopyrite and pyrite, traces of sphalerite.

B

: 272.3 m depth. Dacite Tuff with moderate silicification,

chalcopyrite, pyrite, traces of sphalerite

. C

: 446 m depth. Dacite Tuff with moderate to strong

silicification, chalcopyrite, pyrite and​ traces of sphalerite.

D

: 446.3 m depth. Hydrothermal Breccia,

moderate silicification, chalcopyrite, pyrite and​ traces of sphalerite. ​

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1663/293708_8d7c7190a446fa07_003full.jpg

Figure 4: LTP-183 cross section showing PFS Block Model and Mine Design. Interval highlighted in

thick red corresponds to observed chalcopyrite from 510 m to its current depth of 555.1 m.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1663/293708_8d7c7190a446fa07_004full.jpg

Figure 5: Core from hole LTP-183.

A

: 514.3 m depth. Dacitic crystal -lithic tuff silicification in injection,

Chalcopyrite in patches, pyrite disseminated and in veins.

B

: 535.3 m depth. Dacitic crystal -lithic tuff

silicification in injection, pyrite disseminated and in veins.

C

: 548.8 m depth. Dacitic crystal-lithic tuff with

moderate to strong silicification overprinting strong argillic alteration. Patchy chalcopyrite and

disseminated pyrite.

D

: 553.3 m depth. Fine tuff with strong argillic alteration and silica injections. Semi-

massive chalcopyrite and disseminated pyrite.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1663/293708_8d7c7190a446fa07_005full.jpg

The current drilling campaign at Romero is focused on:

Extending known mineralization beyond the existing resource envelope.

Improving the geological understanding of mineralization controls.

Evaluating the potential to increase the overall resource base.

Further drilling is planned to test the continuity, geometry, and grade distribution of these newly identified

zones.

Luis Santana, CEO of GoldQuest Mining Corp., commented:

"We are encouraged by the visual

intercepts observed in drill holes LTP-182 and LTP-183. The mineralization appears visually consistent

with the established Romero geological model and supports the continued evaluation of mineralization

continuity at depth and along strike. While laboratory assay results are pending, these observations

contribute to our ongoing understanding of the geological system."

Qualified Person

The scientific and technical information in this press release has been reviewed and approved by

Leandro Sastre, P. Geo., VP of Exploration of GoldQuest and a Qualified Person for the technical

information in this press release under NI 43-101-

Standards of Disclosure for Mineral Properties

.

About GoldQuest

GoldQuest Mining Corp. is a Canadian exploration and development company with strong participation

from Dominican investors, focused on advancing its gold and copper assets in the Dominican Republic.

The Company has a Board of Directors and management team with prior experience developing and

operating a mine in the country.

Additional information can be viewed at the Company's website

www.goldquestcorp.com

.

On Behalf of the Board of Directors of GoldQuest Mining Corp.,

"Luis Santana"

Director & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news

release.

Forward-looking statements:

Statements contained in this news release that are not historical facts are forward-looking information

that involves known and unknown risks and uncertainties. Forward-looking statements in this news

release include, but are not limited to, statements with respect to past drill programs, the results of such

drill programs and the interpretation of the results of the drill programs, further drilling, the timing of

drilling and assay results, mineral resources at Romero and Romero South, the merits of the Company's

mineral properties, future drill programs and studies, the Company's plans and exploration programs for

its mineral properties, including the timing of such plans and programs. In certain cases, forward-looking

statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is

expected", "potential", "likelihood", "appears", "budget", "scheduled", "estimates", "forecasts", "at

least", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and

phrases or state that certain actions, events or results "may", "could", "would", "should", "might" or "will

be taken", "occur" or "be achieved".

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may

cause the actual results, performance or achievements of the Company to be materially different from

any future results, performance or achievements expressed or implied by the forward-looking

statements. Such risks and other factors include, among others, risks related to uncertainties inherent in

drill results and the estimation of mineral resources; commodity prices; changes in general economic

conditions; market sentiment; currency exchange rates; the Company's ability to continue as a going

concern; the Company's ability to raise funds through equity financings; risks inherent in mineral

exploration; risks related to operations in foreign countries; future prices of metals; failure of equipment

or processes to operate as anticipated; accidents, labor disputes and other risks of the mining industry;

delays in obtaining governmental approvals; government regulation of mining operations; environmental

risks; title disputes or claims; limitations on insurance coverage and the timing and possible outcome of

litigation. Although the Company has attempted to identify important factors that could affect the

Company and may cause actual actions, events or results to differ materially from those described in

forward-looking statements, there may be other factors that cause actions, events or results not to be as

anticipated, estimated or intended. There can be no assurance that forward-looking statements will

prove to be accurate, as actual results and future events could differ materially from those anticipated in

such statements. Accordingly, do not place undue reliance on forward-looking statements. All statements

are made as of the date of this news release and the Company is under no obligation to update or alter

any forward-looking statements except as required under applicable securities laws. Forward-looking

statements are based on assumptions that the Company believes to be reasonable, including

expectations regarding mineral exploration and development costs; expected trends in mineral prices

and currency exchange rates; the accuracy of the Company's current mineral resource estimates; that

the Company's activities will be in accordance with the Company's public statements and stated goals;

that there will be no material adverse change affecting the Company or its properties; that all required

approvals will be obtained and that there will be no significant disruptions affecting the Company or its

properties.

For further information, please contact:

Luis Santana, Chief Executive Officer

1 (809) 224-0629

[email protected]

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/293708