Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GPM.V ·

GPM Metals completes phase 1 reconnaissance diamond drilling at Pasco Zinc Project in Cerro de Pasco Province Peru.

Exploration Programs

GPM Metals completes phase 1 reconnaissance diamond

drilling at Pasco Zinc Project in Cerro de Pasco Province

Peru.

Toronto – October 20, 2017 – GPM Metals Inc. (TSXV:GPM) (the “Company” or

“GPM”) announces that the company has completed an 8 hole, 2,000m diamond

drill program at the Pasco Project in Central Peru.

Drilling was concentrated in the southern portion of the 4.5 km by 500m alteration

system located on a major NW trending fault at the contact of the Pucara limestone

and Mitu conglomerates.

Drilling encountered dolomitized, brecciated, quartz and carbonate vein

stockworked limestones, with up to 10% sulphides and 10% carbon in veins and

breccia matrix, over the entire length of the 8 holes. The holes were drilled over an

area of 1.2km (N/S) and 400m (E/W).

Anomalous Ag, Pb, Zn and Cu mineralisation was intersected in all holes, but

economic grades have yet to be encountered.

Drill hole locations, drill core photographs and assay tables are available at the

company’s web site.

www.gpmmetals.ca/peru

Mineralisation and brecciation appears to increase in intensity to the north and

adjacent to the Pucara Formation / Mitu Formation contact, suggesting that the

basin margin structure that forms this contact is a main conduit for the mineralising

fluids, possibly sourced from the Dacite Dome Complex to the north of area drilled.

Large volumes of carbon as vein and fracture fill deposited along with sulphides,

suggests fluid mixing of hydrocarbons and metalliferous fluids. Preliminary

petrology indicates two phases of mineralisation; Galena (Lead), Sphalerite (Zinc)

mineralisation overprinted by a Tetrahedrite (Copper / Silver) event.

Drilling targeted the southern portion of a 4.25km by 500m alteration system with

soils anomalous in Silver (20ppm to 152ppm), Lead (100ppm to 3.97%) and Zinc

(1000ppm to 2.7%). A north-east trending glaciated valley separates the southern

anomaly which is currently 1.2km by 500m and open to the south and the northern

anomaly. A second phase drill program at the northern anomalous zone is being

prioritized.

The Pasco Project is a district scale, greenfields, base metal discovery. These

concessions had not been subjected to modern mineral exploration or drilling prior

to the current program.

The 100% owned Pasco claims (6,300 hectares) are located in the Central Peruvian

Zinc belt, approximately 30 Km NE of the Cerro de Pasco Mine and 35km N of the

Votorantim / Pan American owned Shalipayco discovery

Walker Gossan Project, Arnhem Land, NT, Australia update

The Work Program Meeting for EL 24305 is to be held this year and cover

2017/2018 work programmes.

The application areas subject to the Rio Tinto Exploration agreement are being

progressed with final meetings due in 2018.

About GPM Metals Inc.

GPM Metals is a zinc focused exploration company with offices in Toronto, Brisbane

and Lima.

The Company’s current holdings include the district scale Walker Gossan Project,

NT, Australia, a joint venture with Rio Tinto Exploration Pty Limited; and the 100%

Claims interest in the Pasco Project, Department of Pasco, Peru.

Both projects are advanced exploration properties with drill ready targets and have

considerable potential to host significant zinc resources.

All scientific and technical information in this press release has been prepared under

the supervision of Dan Noone, (Vice President Exploration and a Director of GPM), a

“qualified person” within the meaning of National Instrument 43-101. Mr. Noone

(B.Sc Geology, MBA) is a member of the Australian Institute of Geoscientists.

CONTACT INFORMATION

For further information contact:

GPM Metals Inc.

Att: John Patrick Sheridan, CEO

Suite 1205 – 141 Adelaide Street West,

Toronto, Ontario M5H 3L5

Telephone : (416) 628-5904

Telefax : (416) 628-6835

Email: [email protected]

Forward Looking Statements

This news release contains certain forward-looking information and statements within the meaning of applicable

securities laws. The use of any of the words “expect”, “anticipate”, “continue”, “estimate”, “may”, “might”,

“will”, “project”, “should”, “believe”, “plans”, “intends” and similar expressions are intended to identify

forward-looking information and/or statements. Forward-looking statements and/or information are based on a

number of material factors, expectations and/or assumptions of GPM which ha ve been used to develop such

statements and/or information but which may prove to be incorrect. Although GPM believes that the expectations

reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be

placed on forward-looking statements as GPM can give no assurance that such expectations will prove to be

correct. In addition to other factors and assumptions which may be identified herein, assumptions have been made

regarding, among other things: results from planned exploration and drilling activities; GPM’s future plans for

operational expenditures; the accuracy of the interpretations of exploration and drilling activity results; availability

of financing to fund current and future plans and expenditures; the impact of increasing competition; the general

stability of the economic and political environment in which GPM has property interests; the general continuance of

current industry conditions; aboriginal matters; the timely receipt of any required regulator y approvals; the ability

of GPM to obtain qualified staff, equipment and/or services in a timely and cost efficient manner; the ability of the

operator of each project in which GPM has property interests to operate in a safe, efficient and/or effective man ner

and to fulfill its respective obligations and current plans; future commodity prices; currency, exchange and/or

interest rates; and the regulatory framework regarding royalties, taxes and/or environmental matters in the

jurisdictions in which GPM has property interests. The forward-looking information and statements included in this

news release are not guarantees of future performance and should not be unduly relied upon. Such information

and/or statements, including the assumptions made in respect thereof, involve known and unknown risks,

uncertainties and other factors that may cause actual results and/or events to differ materially from those

anticipated in such forward-looking information and/or statements including, without limitation: risks associated

with the uncertainty of exploration results and estimates, currency fluctuations, the uncertainty of conducting

operations under a foreign regime, exploration risk, the uncertainty of obtaining all applicable regulatory

approvals, the availability of labour and/or equipment, the fluctuating prices of commodities, the availability of

financing and GPM’s dependence on its management personnel, other participants in the property areas and/or

certain other risks detailed from time-to-time in GPM’s public disclosure documents, (including, without limitation,

those risks identified in this news release and GPM’s current management’s discussion and analysis). Furthermore,

the forward-looking statements contained in this news release are made as at the date of this news release and the

Company does not undertake any obligations to publicly update and/or revise any of the included forward -looking

statements, whether as a result of additional information, future events and/or otherwise, except as may be required

by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy and / or accuracy of this release