Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GPG.V ·

Grande Portage to Present at 2025 Alaska Miners Association Annual Convention

Marketing Announcement

1050 - 1090 West Georgia Street

Vancouver, British Columbia. V6E 3V7

Grande Portage to Present at 2025 Alaska Miners Association Annual Convention

Vancouver, British Columbia — November 3, 2025 – Grande Portage Resources Ltd. (TSXV: GPG) (OTCQB: GPTRF)

(FSE: GPB) (“Grande Portage” or the “Company”) is pleased to report updates regarding its New Amalga Gold Project in

Southeast Alaska.

The project remains open to expansion in multiple directions and hosts an Indicated Resource of 1,438,500 ounces of gold at

an average grade of 9.47 g/t Au (4,726,000 tonnes) and an Inferred Resource of 515,700 ounces of gold at an average grade of

8.85 g/t Au (1,813,000 tonnes) . The current development concept envisions a small -footprint underground mining operation

with third-party offsite processing, eliminating the need for an onsite mill or tailings storage facility.

Upcoming Alaska Miners’ Association Presentation

On November 5th Grande Portage will present a project overview during the “Advanced Exploration Projects” session of the

Alaska Miners Association annual convention in Anchorage. This conference is the premier gathering for the mining industry

in Alaska and includes representatives from operating mines, advanced development projects, early-stage exploration prospects,

vendors, regulators and investors.

Grande Portage’s presentation, titled “ New Amalga Gold Project – Developing an Ultra -Low-Footprint Underground Mine in Southeast

Alaska”, will focus on the company’s exploration efforts as well as the decisions which led to the project development strategy

currently being evaluated in the company’s ongoing Preliminary Economic Assessment, scheduled for completion in February

2026.

Grande Portage is also pleased to announce the appointment of the following consultant.

RESPEC Inc. – Roadway & Traffic Studies

A versatile engineering firm with a strong local presence and track record in Alaska projects, RESPEC Inc. provides broad range

of experience across mining, civil, environmental, and water resources projects. Grande Portage has contracted RESPEC to

perform initial roadway and traffic studies relating to the haulage of New Amalga material on Glacier Highway from the project

site to the future ore dock at Cascade Point.

The firm has extensive experience with this type of project in Alaska, including studies for the Kinross/Contango Manh Choh

Gold Mine ore haulage, engineering for the Ambler Mining District Access Road, and previous engineering for road upgrades

to the same portion of Glacier Highway as may be utilized by the New Amalga project.

Separately, RESPEC Inc. is also performing mining cost estimation work for the project’s upcoming 43 -101 Preliminary

Economic Assessment as discussed in the October 20, 2025 news release.

Incentive Share Options

Lastly, the Company wishes to announce that, subject to TSX Venture Exchange approval, it has granted incentive stock options

to various directors, officers and consultants to purchase up to 2,200,000 common shares exercisable on or before Nov 2, 2030

at a price of $0.25 per share.

1050 - 1090 West Georgia Street

Vancouver, British Columbia. V6E 3V7

- 2 -

Fig. 1: Location of the New Amalga Gold Project

Kyle Mehalek, P.E.., is the QP within the meaning of NI 43-101 and has reviewed and approved the technical disclosure

in this release. Mr. Mehalek is independent of Grande Portage within the meaning of NI 43-101.

About Grande Portage:

Grande Portage Resources Ltd. is a publicly traded mineral exploration company focused on advancing the New Amalga

Mine project, the outgrowth of the Herbert Gold discovery situated approximately 25 km north of Juneau, Alaska. The

Company holds a 100% inte rest in the New Amalga property. The New Amalga gold system is open to length and

depth and is host to at least six main composite vein-fault structures that contain ribbon structure quartz-sulfide veins.

The project lies prominently within the 160km long Juneau Gold Belt, which has produced over eight million ounces

of gold.

The Company's updated NI#43-101 Mineral Resource Estimate (MRE) reported at a base case mineral resources cut -

off grade of 2.5 grams per tonne gold (g/t Au) and consists of: an Indicated Resource of 1,438,500 ounces of gold at

an average grade of 9.47 g/t Au (4,726,000 tonnes); and an Inferred Resource of 515,700 ounces of gold at an average

grade of 8.85 g/t Au (1,813,000 tonnes), as well as an Indicated Resource of 891,600 ounces of silver at an average grade

of 5.86 g/t Ag (4,726,000 tonnes); and an Inferred Resource of 390,600 ounces of silver at an average grade of 7.33 g/t

1050 - 1090 West Georgia Street

Vancouver, British Columbia. V6E 3V7

- 3 -

silver (1,813,000 tonnes). The MRE was prepared by Dr. David R. Webb, Ph.D., P.Geol., P.Eng. (DRW Geological

Consultants Ltd.) with an effective date of July 17, 2024.

ON BEHALF OF THE BOARD

"Ian Klassen"

Ian M. Klassen

President & Chief Executive Officer

Tel: (604) 899-0106

Email: [email protected]

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain "forward -looking statements" under applicable Canadian securities legislation.

Forward-looking statements include estimates and statements that describe the Company's future plans , objectives or

goals, including words to the effect that the Company or management expects a stated condition or result to occur.

Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may",

"could", "would", "will", or "plan". Since forward -looking statements are based on assumptions and address future

events and conditions, by their very nature they involve inherent risks and uncertainties as described in the Company's

filings with Canadian securities regulators. There can be no assurance that such statements will prove to be accurate, as

actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers

should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to

update or revise any forward-looking information, whether as a result of new information, future events or otherwise,

other than as required by law.

Please note that under National Instrument 43 -101, the Company is required to disclose that it has not based any

production decision on NI 43-101-compliant reserve estimates, preliminary economic assessments, or feasibility studies,

and historically production decisions made without such reports have increased uncertainty and higher technical and

economic risks of failure. These risks include, among others, areas that are analyzed in more detail in a feasibility study

or preliminary economic assessment, such as the application of economic analysis to mineral resources, more detailed

metallurgical and other specialized studies in areas such as mining and recovery methods, market analysis, and

environmental, social, and community impacts. Any decision to pla ce the New Amalga Mine into operation at levels

intended by management, expand a mine, make other production -related decisions, or otherwise carry out mining and

processing operations would be largely based on internal non-public Company data, and on reports based on exploration

and mining work by the Company and by geologists and engineers engaged by the Company.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS

DEFINED UNDER THE POLICIES OF THE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR

ACCURACY OF THIS NEWS RELEASE