Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GPAC.V ·

Enoch’s Point EL7219, Loch Flyne EL6363, Harbinger EL7215, Woods Point EL6321, Pinnacles EL7307, Walhalla North EL7289, Walhalla EL7297 and Cooper’s Creek EL7300. 2. All figures Canadian dollars

Corporate Updates

TSX-V: GPAC OTCQX: FSXLF GER: V3H

1. www.gpacgold.com The Walhalla Project consists of the following Exploration Licenses (EL’s): Kevington EL8538,

Enoch’s Point EL7219, Loch Flyne EL6363, Harbinger EL7215, Woods Point EL6321, Pinnacles EL7307, Walhalla North

EL7289, Walhalla EL7297 and Cooper’s Creek EL7300.

2. All figures Canadian dollars unless otherwise noted.

3. GeoVic is a State Government of Victoria source (GeoVic 2020 is the publication).

| 1

Great Pacific Gold Announces 1:1 Spin Out of Australian Walhalla Gold Project

May 2, 2025 – Vancouver, BC, Canada – Great Pacific Gold Corp. ("Great Pacific" , “GPAC” or the

"Company") (TSXV:GPAC) (OTC: FSXLF) (Frankfurt:V3H) is pleased to announce that the Board of Directors

of the Company has unanimously approved a spin out transaction (the "Spin Out") whereby Great Pacific

will distribute the shares of a new company named Walhalla Gold Corp. ("Walhalla") to the shareholders

of Great Pacific. Walhalla will own the Company’s Walhalla Gold Project in Victoria, Australia.1

Highlights:

• Immediate value creation directly for Great Pacific shareholders as each Great Pacific

shareholder will receive one share of Walhalla for every share held of Great Pacific owned.

• Great Pacific will also receive $1.5 million cash2 relating to this transaction and will retain a

2% Net Smelter Royalty (NSR) on the project.

• Walhalla Gold Project, located in Victoria, Australia, has a prolific history of gold production,

with total historic production reported of 1,510,309 ounces at a grade of 33.59 g/t gold

(GeoVic, 2020).3

• Walhalla Gold Project is district-scale 1,400 sq km land package with both advanced stage

and greenfield targets.

• High-priority greenfield target called Pinnacles, where extensive soil geochemistry has

highlighted a 400m x 1,100m gold mineralized aplitic dyke which contains disseminated

sulphides and outcrops at surface.

• Pinnacles target is fully permitted, accessible, and ready for immediate drilling.

As part of the Spin Out, Great Pacific and Walhalla entered into a non-binding letter of intent (the “LOI”)

with 1537559 B.C. Ltd. (“Finco”) whereby Finco has agreed to make a payment of $1.5 million cash to

GPAC and to fund the exploration, advancement and development of the Walhalla Gold Project.

Great Pacific CEO, Greg McCunn states, "Victoria, well known in recent times for the success of the

Fosterville Mine owned by Agnico Eagle, is experiencing a resurgence of exploration activity and interest

due to successes such as the Southern Cross Sunday Creek discovery. With the Walhalla Belt now

consolidated by the Company following the acquisition of Woods Point and initial field work complete in

preparation for drilling, this is an excellent time to spin out the project for the direct benefit of Great Pacific

| 2

Gold shareholders. The Company will also receive a direct benefit from a $1.5 million non-contingent cash

payment and will retain exposure to the future success of the project via the retention of a 2% NSR.”

Walhalla Gold Project

Located in the state of Victoria (Figure 1), the district-scale Walhalla project consists of over 1,400km2 of

concessions. In addition to multiple areas with past historic production, Walhalla contains a high-priority

greenfield target called Pinnacles. Extensive soil geochemistry has highlighted a 400m x 1,100m gold

mineralized aplitic dyke which contains disseminated sulphides and outcrops at surface. The Pinnacles

target is fully permitted, accessible, and ready for immediate drilling.

Highlights of the Walhalla Belt:

• History of gold production, with total historic production reported of 1,510,309 ounces at a

grade of 33.59 g/t gold (GeoVic, 2020).

• Large (1,400km2) land package comprising numerous occurrences and historic mines hosting

epizonal-style Au mineralization, most with no modern drilling and exploration.

• Cohen’s Reef: historic production from laminated quartz veins within a single mineralized shoot

down to 1,120m. Historic drilling at depth suggests multiple shoots and extensions (e.g. 4.25m

@ 11.15 g/t Au from 258.4m).

• Longfellows Reef: Located 1 km west of and parallel to Cohens Reef, comprises of old gold

workings over a strike length of 1.5km. Grab samples from the main adit returned 200m @ 4.95

g/t Au and 75m @ 4.1 g/t Au.

• Pinnacles: A 400m by 1,100 m zone of sulphide mineralization associated with disseminated

sulphide in aplitic dykes and quartz stockwork veins in silicified sedimentary rocks. Highlight

channel sampling includes 81.6m @ 1.02 g/t Au and 18.0m @ 3.28 g/t Au

Figure 1: Walhalla Gold Project and Pinnacles Target Geochemistry Results, Victoria Australia

| 3

Terms of Transaction

Under the terms of the Spin Out and the LOI:

• Great Pacific shareholders will receive one share of Walhalla for every share in Great Pacific held

(1:1 spinout transaction) as of a future record date to be determined.

• Great Pacific will receive a one -time payment of $1,500,000 from Finco on or before May 30,

2025.

• Finco will complete a private placement financing(s) of approximately $4,500,000 prior to

completion of the Spin Out (the “Financings”). The terms of the Financings will be determined at

a later date.

• After completion of the Financings and in conjunction with closing of the Spin Out, Walhalla will

acquire all of the issued and outstanding shares of Finco on the basis of one share of Walhalla for

every share of Finco.

• Great Pacific will retain a 2% net smelter return on the Walhalla Gold Project.

• Walhalla intends to apply to list its common shares as a mining issuer on the CSE.

A proposed management team and board of directors of Walhalla will be announced in due course. Finco

will issue a total of 10 million common shares to the new management team and board as part of the Spin

Out transaction.

After closing of the Spin Out and acquisition of Finco, the capital structure of Walhalla will equal the issued

and outstanding shares of Great Pacific plus the then issued and outstanding shares of Finco.

Under the terms of the LOI, Great Pacific, Walhalla and Finco will enter into an arrangement agreement

setting forth the definitive terms of the Spin Out and acquisition of Finco on or before May 30, 2025. The

Spin Out and acquisition of Finco by Walhalla will be subject to the acceptance of the TSXV, listing of the

common shares of Walhalla on the CSE, completion of the Financing, regulatory and shareholder

approvals of Great Pacific and such other terms and conditions set forth in the arrangement agreement.

Further details of the capital structure, additional directors and terms of the Financing will be set forth in

a subsequent news release and information circular to be mailed to the shareholders of Great Pacific.

Qualified Person

The technical content of this news release has been reviewed, verified and approved by Callum Spink, the

Company’s Vice President, Exploration, who is a member of the Australian Institute of Geoscientists,

MAIG, and a Qualified Person as defined by Nationa l Instrument NI 43 -101 Standards of Disclosure for

Mineral Projects. Mr. Spink is responsible for the technical content of this news release.

On behalf of Great Pacific Gold:

Greg McCunn

Chief Executive Officer and Director

For further information visit gpacgold.com or contact:

Investor Relations

Phone +1-778-262-2331

Email: [email protected]

About Great Pacific Gold

| 4

Great Pacific Gold has a portfolio of exploration -stage projects in Papua New Guinea ("PNG"). The

Company is focused on developing gold -copper resources from its highly prospective land packages. Its

core projects include:

• Kesar Project: located in the Eastern Highlands province of PNG and contiguous with the mine

tenements of K92 Mining Inc. ("K92"), the Kesar Project is a greenfield exploration project with

several high -priority targets in close proximity to the property boundary with K9 2. Multiple

epithermal veins at Kesar are on strike and have the same orientation as key K92 deposits, such

as Kora. Exploration work to date by the Company at the Kesar Project has shown that these veins

have high grades of gold present in outcrop and very elevated gold in soil grades, coincident with

aeromagnetic highs. The Company is carrying out an ongoing diamond drill program on key target

areas at the Kesar Project.

• Wild Dog Project: located in the East New Britain province of PNG, the Wild Dog Project is a

brownfield exploration project with a history of small -scale gold mining. The Wild Dog Project

contains numerous epithermal and porphyry hydrothermal -magmatic targets evidenced by

previous exploration and operations. The Company completed a road refurbishment in August

2024 and baseline environmental work in Q4 2024. In Q1 2025, the Company began preparing

for a drilling program with camp and infrastructure being established, airborne geophysics

(MobileMT) survey completed and a geological team in place. Drilling is expected to begin on the

property in May 2025.

• Arau Project: located in the Eastern Highlands province of PNG, the Arau Project contains the

highly prospective Mt. Victor exploration target with potential for a high sulphidation epithermal

gold-base metal deposit. A Phase 1 Reverse Circulation drilling program was c ompleted at Mt.

Victor in August 2024, with encouraging results. The Arau Project includes the Elandora licence,

which also contains various epithermal and copper-gold porphyry targets.

The Company also holds the Tinga Valley Project in PNG.

Forward-Looking Statements

Information set forth in this news release contains forward -looking statements that are based on

assumptions as of the date of this news release. These statements reflect management's current

estimates, beliefs, intentions and expectations. They are not gu arantees of future performance. Great

Pacific Gold cautions that all forward looking statements are inherently uncertain and that actual

performance may be affected by many material factors, many of which are beyond their respective control.

Such factors i nclude, among other things: risks and uncertainties relating to Great Pacific Gold's limited

operating history, its exploration and development activities on its mineral properties and the need to

comply with environmental and governmental regulations. Acc ordingly, actual and future events,

conditions and results may differ materially from the estimates, beliefs, intentions and expectations

expressed or implied in the forward looking information. Except as required under applicable securities

legislation, Great Pacific Gold does not undertake to publicly update or revise forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.