Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GOT.V ·

Goliath Reports 100% of all 24 Holes Drilled Intersected Significant High-Grade Gold-Silver Over 1 km of Strike and 1.1 km Down Dip on Surebet Discovery 2021 Maiden Drilling Campaign & Exploration Highlights: 100% of all 24 holes drilled during the 2021 maiden campaign totalling 5332 meters intersec

Drill Results

Goliath Reports 100% of all 24 Holes Drilled Intersected Significant High-Grade

Gold-Silver Over 1 km of Strike and 1.1 km Down Dip on Surebet Discovery

2021 Maiden Drilling Campaign & Exploration Highlights:

100% of all 24 holes drilled during the 2021 maiden campaign totalling 5332 meters intersected

significant high-grade gold-silver mineralization over 1 km of strike and 1.1 km of down dip

extent.

This successful maiden drill campaign confirms the continuity and extensive scale of a high-grade

gold-silver polymetallic system that remains open.

GD-21-03 intersected 6.37 gpt AuEq (4.46 gpt Au and 122.13 gpt Ag) over 35.72 meters*.

GD-21-05 intersected 12.6 gpt AuEq (8.06 gpt Au and 313.66 gpt Ag) over 6.38 meters*.

The average grade and width from the best hole from each 7 widely spaced drill pads assayed

9.42 gpt AuEq (6.66 gpt Au and 172.66 gpt Ag) over 6.43 meters* respectively.

The average grade and width from all 24 holes assayed 6.29 gpt AuEq (4.35 gpt Au and 104.94 gpt

Ag) over 5.87 meters* respectively.

A newly discovered “Extension Target” of widespread high-grade gold-silver polymetallic

mineralization outcrop was found 500 meters southeast of the Surebet Zone that is 1200 meters

by 400 meters.

The Extension Target samples are mineralogically, geochemically and texturally similar to the

surface and in drill core seen on the Surebet Zone; grabs assayed up to 75.04 gpt AuEq and a

channel cut assayed 14.76 gpt AuEq over 0.58 meters.

"Goliath Resource's execution of a first phase drill program at Surebet has generated a major new gold-

silver discovery in the Golden Triangle," commented Dr. Quinton Hennigh, Advisor and Director of Crescat

Capital, a strategic shareholder of Goliath. "The fact that all twenty-four core holes successfully

encountered mineralized intercepts across the Surebet Zone is remarkable, and even more so, these holes

define a mineralized footprint of 1,000 m strike and 1,100 m down dip extent. The weighted average

down hole length and grade of these twenty-four holes is 5.87 meters and 6.29 gpt AuEq respectively.

While another robust round of drilling is needed to more fully assess the Surebet Zone, this is a fantastic

start and provides an early indication this is a significant new discovery. On top of this stellar drill success,

the Company also successfully sampled new areas of mineralization that may prove to be natural

extensions of the Surebet mineralizing system, especially to the southeast. If so, this discovery could grow

very quickly. We at Crescat are delighted to be a part of this exciting story and eagerly await a new

season of aggressive drilling at Surebet."

Toronto, Ontario – January 11, 2022 – Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE: B4IF)

(the “Company” or “Goliath”) is pleased to report successful drill results from its 2021 maiden drill

campaign on the Surebet discovery where a 100% of all 24 drill holes intersected significant intervals of

Au-Ag polymetallic mineralization over 1 km of strike, 1.1 km down-dip and extended to 600 meters of

vertical relief that remains open.

Drill hole GD-21-03 intersected 6.37 gpt AuEq (4.46 gpt Au and 122.13 gpt Ag) over 35.72 meters*

(reported in NR August 30, 2021) and drill hole GD-21-05 intersected 12.6 gpt AuEq (8.06 gpt Au and

313.66 gpt Ag) over 6.38 meters*. The average grade and width from the best hole from each 7 widely

spaced drill pads assayed 9.42 gpt AuEq (6.66 gpt Au and 172.66 gpt Ag) over 6.43 meters* respectively.

The average grade and width from all 24 holes assayed 6.29 gpt AuEq (4.35 gpt Au and 104.94 gpt Ag)

over 5.87 meters* respectively.

This maiden drill campaign demonstrates the continuity and extensive scale of the high-grade gold-silver

polymetallic mineralization of the Surebet Zone that remains open.

Additionally the Company discovered a new Extension target located approximately 500 meters

southeast of the Surebet Cliff Zone where widespread high-grade gold-silver polymetallic mineralization

was confirmed in outcrop over an area of 1200 meters by 400 m. Channel and grab samples highlights

from these showings include samples assaying 75.04 gpt AuEq, 57.97 gpt AuEq, 21.82 gpt AuEq and a 0.58

m channel assaying 14.76 gpt AuEq that are mineralogically, geochemically and texturally similar to the

surface and in drill core seen on the Surebet Zone.

2021 Drill Results:

• Surebet – Cliff Pad

◦ Drill hole GD-21-03 intersected 6.37 gpt AuEq (4.46 gpt Au and 122.13 gpt Ag) over 35.72

meters*, including 31.88 gpt AuEq (24.97 gpt Au and 458.1 gpt Ag) over 4.52 meters*

(reported in NR August 30, 2021).

◦ Drill hole GD-21-04 intersected 1.80 gpt AuEq (1.31 gpt Au and 24.22 gpt Ag) over 33.31

meters*, including 10.85 gpt AuEq (8.86 gpt Au and 90.82 gpt Ag) over 3.4 meters*.

◦ Drill hole GD-21-05 intersected 12.6 gpt AuEq (8.06 gpt Au and 313.66 gpt Ag) over 6.38

meters*, including 21.25 gpt AuEq (13.86 gpt Au and 521.86 gpt Ag) over 3.66 meters*.

• Surebet – Cliff Stepout Pad

◦ Drill hole GD-21-09 intersected 7.153 gpt AuEq (5.44 gpt Au and 83.84 gpt Ag) over 9 meters*,

including 13.06 gpt AuEq (10.02 gpt Au and 152.17 gpt Ag) over 4.76 meters* and 20.28 gpt

AuEq (15.77 gpt Au and 232 gpt Ag) over 2.92 meters*.

◦ Drill hole GD-21-13 intersected 6.72 gpt AuEq (5.96 gpt Au and 28.05 gpt Ag) over 4.49

meters*.

◦ Drill hole GD-21-10 intersected 4.77 gpt AuEq (3.93 gpt Au and 33.96 gpt Ag) over 5 meters*,

including 10.06 gpt AuEq (9.04 gpt Au and 42.7 gpt Ag) over 2 meters*.

• Surebet - Waterfall Pad

◦ Drill hole GD-21-22 intersected 19.4 gpt AuEq (13.87 gpt Au and 342.14 gpt Ag) over 3.96

meters*, including 35.75 gpt AuEq (25.8 gpt Au and 623.58 gpt Ag) over 2.09 meters* and

51.93 gpt AuEq (40.72 gpt Au and 695.11 gpt Ag) over 1.26 meters*.

◦ Drill hole GD-21-20 intersected 7.82 gpt AuEq (7.16 gpt Au and 25.23 gpt Ag) over 4.35

meters*

◦ Drill hole GD-21-20 also intersected an interval of 3.91 gpt AuEq (1.97 gpt Au and 118.17 gpt

Ag) over 9.46 meters*.

• Surebet – Main Pad

◦ Drill hole GD-21-21 intersected 9.77 gpt AuEq (7.97 gpt Au and 105.75 gpt Ag) over 5.54

meters*, including 15.71 gpt AuEq (13.38 gpt Au and 135.98 gpt Ag) over 2.5 meters*.

◦ Drill hole GD-21-14 intersected 5.43 gpt AuEq (2.85 gpt Au and 154.45 gpt Ag) over 6.34

meters*, including 9.3 gpt AuEq (4.24 gpt Au and 309.15 gpt Ag) over 2 meters*.

• Surebet – West Central Pad

◦ Drill hole GD-21-23 intersected 3.81 gpt AuEq (2.35 gpt Au and 68.11 gpt Ag) over 2 meters*.

• Surebet – North Rubble Pad

◦ Drill hole GD-21-08 intersected 10.01 gpt AuEq (5.95 gpt Au and 286.5 gpt Ag) over 6.1

meters*, including 19.6 gpt AuEq (11.74 gpt Au and 562.79 gpt Ag) over 3 meters*.

• Surebet – Real Deal Pad

◦ Drill hole GD-21-24 intersected 2.35 gpt AuEq (2.13 gpt Au and 5.46 gpt Ag) over 18 meters*,

including 3.17 gpt AuEq (2.96 gpt Au and 5.61 gpt Ag) over 12 meters* and 9.38 gpt AuEq

(8.66 gpt Au and 20 gpt Ag) over 2 meters*.

◦ Drill hole GD-21-24 also intersected 3.13 gpt AuEq (3.02 gpt Au and 2.88 gpt Ag) over 5.5

meters*, including 6.34 gpt AuEq (6.18 gpt Au and 4.6 gpt Ag) over 2.5 meters*.

◦ Drill hole GD-21-24 also intersected 4.2 gpt AuEq (2.49 gpt Au and 4.08 gpt Ag) over 2.49

meters*, including 6.68 gpt AuEq (6.5 gpt Au and 10.83 gpt Ag) over 1.49 meters*.

Table 1: 2021 Golddigger drill hole assay results.

Average Width* and Grade - Best Hole Per Pad (7 pads in total)

Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

6.43 6.66 172.66 0.02 0.55 0.48 9.42

Average Width* and Grade - All 24 Holes

Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

5.87 4.35 104.94 0.02 0.61 0.50 6.29

Cliff Pad

GD-21-01 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 36.90 48.25 11.35 2.03 27.71 0.02 0.40 0.33 2.73

Including 36.90 40.00 3.10 6.17 54.07 0.04 1.11 0.99 7.85

GD-21-02 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 28.50 42.00 13.50 1.35 68.27 0.03 0.39 0.41 2.65

Including 28.50 33.50 5.00 2.83 70.29 0.07 0.84 0.01 4.57

GD-21-03 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 66.78 102.50 35.72 4.46 122.13 0.02 0.28 0.31 6.37

including 66.78 71.30 4.52 24.97 458.10 0.12 0.74 0.80 31.88

and 83.50 88.50 5.00 3.55 275.36 0.03 0.32 0.35 7.53

and 96.40 102.50 6.10 2.95 71.15 0.01 0.52 0.65 4.41

GD-21-04 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 42.19 75.50 33.31 1.31 24.22 0.01 0.20 0.14 1.80

Including 44.25 47.65 3.40 8.86 90.82 0.03 1.12 0.55 10.85

and 61.58 62.60 2.12 2.67 51.68 0.01 0.57 0.50 3.87

GD-21-05 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 50.50 56.88 6.38 8.06 316.66 0.03 0.42 0.42 12.60

Including 51.54 55.20 3.66 13.86 521.86 0.04 0.58 0.61 21.25

Interval 61.88 65.06 3.18 2.02 41.05 0.01 0.43 0.36 2.94

Including 62.48 65.06 2.58 2.47 45.59 0.01 0.50 0.40 3.51

North Rubble Pad

GD-21-06 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 87.32 90.15 2.83 0.75 46.81 0.02 0.37 0.36 1.73

Interval 116.90 120.80 3.90 1.40 88.37 0.02 0.31 0.13 2.78

Including 116.90 118.80 1.90 2.26 168.93 0.04 0.63 0.25 4.91

GD-21-07 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 110.00 117.62 7.62 0.43 88.95 0.01 0.19 0.20 1.80

Including 114.00 117.62 3.62 0.77 152.22 0.02 0.26 0.31 3.06

GD-21-08 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 134.00 147.60 13.60 1.16 54.00 0.02 0.62 0.74 2.56

Including 134.62 145.60 10.98 1.36 64.56 0.02 0.75 0.89 3.04

Including 134.62 137.60 2.98 2.06 158.81 0.02 1.90 1.48 5.75

and 140.60 145.60 5.00 1.70 37.32 0.02 0.44 0.98 2.97

Interval 172.00 178.10 6.10 5.95 286.50 0.02 0.40 0.31 10.01

Including 172.00 175.00 3.00 11.74 562.79 0.02 0.58 0.57 19.60

Including 172.00 173.60 1.60 21.94 1041.31 0.04 1.07 1.05 36.48

Cliff Stepout Pad

GD-21-09 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 349.00 358.00 9.00 5.44 83.84 0.02 0.55 0.66 7.15

Including 350.08 354.84 4.76 10.02 152.17 0.03 0.98 1.11 13.06

Including 350.08 353.00 2.92 15.77 232.00 0.03 1.41 1.54 20.28

GD-21-10 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 227.00 232.00 5.00 3.93 33.96 0.02 0.35 0.41 4.77

Including 227.00 229.00 2.00 9.04 42.70 0.02 0.37 0.52 10.06

GD-21-11 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 188.00 189.60 1.60 4.44 106.56 0.02 1.36 1.25 7.10

GD-21-12 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 172.94 176.00 3.06 1.41 17.64 0.02 0.23 0.53 2.07

GD-21-13 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 224.51 229.00 4.49 5.96 28.05 0.01 0.54 0.28 6.72

Including 224.51 225.70 1.19 21.69 86.71 0.02 1.64 0.62 23.86

Main Pad

GD-21-14 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 2.35 8.69 6.34 2.85 154.45 0.01 0.89 0.36 5.43

Including 2.35 7.00 4.65 3.33 196.97 0.01 1.12 0.47 6.61

Including 2.35 4.35 2.00 4.24 309.15 0.02 1.83 0.54 9.30

GD-21-21 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 4.50 10.04 5.54 7.97 105.75 0.01 0.51 0.36 9.77

Including 5.00 10.04 5.04 8.70 106.66 0.02 0.53 0.38 10.54

Including 6.50 9.00 2.50 13.38 135.98 0.02 0.76 0.41 15.71

Including 6.50 7.50 1.00 24.35 189.50 0.02 1.27 0.77 27.79

Waterfall Pad

GD-21-15 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 81.00 84.72 3.72 0.49 28.31 0.01 0.26 0.17 1.07

GD-21-17 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 86.00 87.00 1.00 0.56 71.65 0.02 0.87 1.07 2.48

GD-21-18 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 85.37 96.50 11.13 1.00 31.05 0.01 0.34 0.40 1.79

Including 85.37 93.00 7.91 1.24 39.18 0.01 0.44 0.51 2.24

GD-21-19 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 89.96 97.00 7.04 2.33 98.29 0.01 0.44 0.55 4.12

Including 89.96 92.50 2.54 5.25 179.78 0.02 0.94 1.29 8.72

GD-21-20 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 107.72 117.18 9.46 1.97 118.17 0.03 0.46 0.33 3.91

Including 108.00 110.00 2.00 6.88 210.47 0.07 1.27 0.62 10.58

Interval 121.65 126.00 4.35 7.16 25.23 0.01 0.30 0.36 7.82

GD-21-22 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 116.04 120.00 3.96 13.87 342.14 0.04 1.08 1.08 19.40

Including 116.04 118.13 2.09 25.80 623.58 0.06 1.86 1.83 35.75

Including 116.04 117.30 1.26 40.27 695.11 0.08 2.70 2.57 51.93

West Central Pad

GD-21-16 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 47.65 48.30 0.65 2.60 5.80 0.01 0.00 0.01 2.69

Interval 179.00 179.80 0.80 3.04 98.88 0.01 0.73 0.20 4.75

Interval 191.50 194.00 2.50 1.44 60.14 0.01 0.85 0.87 3.08

Including 192.00 194.00 2.00 1.69 63.20 0.01 0.89 0.93 3.42

Including 192.00 193.00 1.00 1.83 93.30 0.02 1.40 1.57 4.53

GD-21-23 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 115.00 116.00 1.00 2.75 87.00 0.02 0.43 0.32 4.26

Interval 137.00 139.00 2.00 2.35 68.11 0.01 0.82 0.40 3.81

Including 137.00 137.80 0.80 5.66 141.32 0.01 1.94 0.66 8.66

Real Deal Pad

GD-21-24 From (m) To (m) Interval (m) Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Interval 275.00 293.00 18.00 2.13 5.46 0.01 0.07 0.17 2.35

Including 275.00 287.00 12.00 2.96 5.61 0.01 0.07 0.16 3.17

Including 275.00 276.00 1.00 5.60 6.30 0.02 0.06 0.27 5.89

and 278.00 280.00 2.00 5.09 4.55 0.02 0.04 0.11 5.26

and 285.00 287.00 2.00 8.66 20.00 0.02 0.26 0.55 9.38

Interval 301.00 306.50 5.50 3.02 2.88 0.02 0.01 0.08 3.13

Including 304.00 306.50 2.50 6.18 4.60 0.02 0.01 0.12 6.34

Interval 386.00 388.49 2.49 4.08 6.64 0.01 0.01 0.01 4.20

Including 387.00 388.49 1.49 6.50 10.83 0.02 0.02 0.01 6.68

* Widths are reported in drill core lengths and the true widths are not known. AuEq metal values are calculated using: Au 1792.60 USD/oz, Ag 23.13

USD/oz, Cu 4.37 USD/lbs, Pb 1.05 USD/lbs and Zn 1.52 USD/lbs on November 28, 2021. There is potential for economic recovery of gold, silver,

copper, lead, and zinc from these occurrences based on other mining and exploration projects in the same Golden Triangle Mining Camp where

Goliath’s project is located such as the Homestake Ridge Gold Project (Auryn Resources Technical Report, Updated Mineral Resource Estimate and

Preliminary Economic Assessment on the Homestake Ridge Gold Project, prepared by Minefill Services Inc. (Bothell, Washington), dated May 29,

2020. Here, AuEq values were calculated using 3-year running averages for metal price, and included provisions for metallurgical recoveries,

treatment charges, refining costs, and transportation. Recoveries for Gold were 85.5%, Silver at 74.6%, Copper at 74.6% and Lead at 45.3%. It will be

assumed that Zinc can be recovered with the Copper at the same recovery rate of 74.6%. The quoted reference of metallurgical recoveries is not from

Goliath’s Golddigger Project, Surebet Zone mineralization, and there is no guarantee that such recoveries will ever be achieved, unless detailed

metallurgical work such as in a Feasibility Study can be eventually completed on the Golddigger Project. Table 4 below has all the drill hole collar

information.

Results from the inaugural drill campaign on Surebet show that all 24 holes drilled intersected significant

intervals of Au-Ag polymetallic mineralization and confirm the high-grade zone over 1 km of strike, with 500

m of vertical relief and 1.1 km down dip extent between North Rubble and Real Deal pads that remains

open. The core of the Surebet zone consists of high-grade Au-Ag polymetallic mineralization within quartz-

sulphide breccia in a surrounding envelope of mineralized quartz-sulphide stockwork and veining and

remains open.

In addition to the maiden drill campaign, follow-up prospecting that included mapping on previously

generated targets and a property-wide Bulk Leach Extractable Gold (BLEG) stream sediment sampling

program were completed that resulted in the discovery of several new showings. Prospecting and surface

sampling of the Cloud 9 and Real Deal structures located 1.0 to 1.5 km west of the main Surebet outcrop

resulted in the discovery of the new Real Deal and Lower Cloud 9 showings with grabs up to 18.22 gpt

AuEq and 5.3 gpt AuEq, respectively, extending the strike of the Cloud 9 structure to 1.15 km with 700 m

of vertical relief (remains open). New grab samples collected from the Lower Cliff assayed up 99.73 gpt

AuEq and 19.3 gpt AuEq.

Newly Discovered Outcropping Extension

The newly discovered Extension showings are located in an area approximately 500 meters southeast of

the Surebet Cliff Zone where widespread high-grade gold-silver polymetallic mineralization was

confirmed in outcrop over an area of 1200 meters by 400 meters. Grab sample highlights from this new

showing include samples assaying 75.04 gpt AuEq, 57.97 gpt AuEq, 21.82 gpt AuEq; a channel cut assayed

14.76 gpt AuEq (13.5 gpt Au) over 0.58 meters. These samples are mineralogically, geochemically and

texturally similar to surface and drill core samples from the Surebet discovery.

Follow up drilling on the Extension targets, Real Deal and Cloud 9 will provide tremendous potential to

significantly expand the footprint of the high-grade Au-Ag polymetallic Surebet discovery to the

southeast 1200 meters and down dip to the west 350 meters and beyond. Follow up drilling is also

planned to test the cliff face on the north slope, an area where high-grade Au-Ag grab samples were

collected (up to 40.75 gpt AuEq). This is believed to be the down dip extension of the Surebet structure

daylighting to the northwest and the contact between the Hazelton Group sediments and the underlying

Hazelton volcanic rocks below where Au-mineralization was confirmed in outcrop over 400 meters. The

Surebet Zone remains open in all directions.

Table 2: 2021 Surebet grab and chip samples > 1 gpt AuEq*

Sample ID Zone Au (gpt) Ag (gpt) Cu (%) Pb (%) Zn (%) AuEq (gpt)*

Y608255 Lower Cliff 66.50 2295.00 0.01 7.44 1.07 99.73

Y607977 Extension 44.40 1629.00 5.22 2.24 0.02 75.04

Y608275 Extension 33.50 1232.00 4.10 3.12 0.80 57.97

Y607972 44.90 119.00 0.14 0.01 0.00 46.67

Y607957 Extension 20.20 22.70 0.00 0.16 2.17 21.82

Y608662 Lower Cliff 9.40 709.00 0.10 0.72 0.39 19.23

Y608664 Real Deal 5.60 358.00 0.01 9.16 7.46 18.22

Y607989 Extension 13.50 32.10 0.09 0.42 0.91 14.76

Y608212 Main 7.89 217.00 0.03 2.17 4.09 13.97

Y608258 Real Deal 2.97 437.00 0.05 8.32 1.18 12.71

Y607978 Extension 6.90 333.00 0.21 0.49 0.00 11.75

Y608282 10.30 17.70 0.00 0.02 0.16 10.64

Y607969 9.90 28.20 0.03 0.00 0.00 10.31

Y608268 1.24 99.20 1.19 4.19 6.19 9.76

Y607955 9.20 10.60 0.01 0.34 0.27 9.64

Y608256 Lower Cliff 3.18 146.00 0.07 2.31 1.98 7.26