Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GOT.V ·

Goliath Drills 59.1 Meters of Continuous Sulphide Mineralization Confirming a Mineralized Footprint of 5.25 Square Kilometers; System Remains Wide Open in All Directions Drill Highlights: 100% of all holes completed to date on the Surebet discovery have intersected significant zones of

Drill Results

Goliath Drills 59.1 Meters of Continuous Sulphide Mineralization

Confirming a Mineralized Footprint of 5.25 Square Kilometers;

System Remains Wide Open in All Directions

Drill Highlights:

100% of all holes completed to date on the Surebet discovery have intersected significant zones of

sulphide mineralization confirming a mineralized footprint of 5.25 square kilometers; system remains

wide open in all directions (see map below). Assays are pending on all 2022 drill holes and will be

reported once received compiled and interpreted.

Hole GD-22-31 collared from Pad 15 (1344 meters step-out from Surebet Main) intersected 2 intervals

of robust sulphide mineralization from 16.43 meters to 18.38 meters (interval 1.95 meters*) and from

160.90 meters to 220.00 meters (interval 59.10 meters*) (see image below). Mineralization primarily

consists of fracture -fill stringers of pyrrhotite and pyrite, hosted in porphyritic andesite. A second

interval intersected 98.99 meters of mainly di sseminated sulphide mineralization associated with

quartz-chlorite-epidote veining from 3.17 meters to 102.16 meters (98.99 meter* interval).

Hole GD-22-38 drilled from Pad 11 (1344 meters step-out from Surebet Main) intersected a significant

interval of continuous breccia and vein stockwork containing sulphide mineralization from 43.00

meters to 81.70 meters (38.7 meters* interval) consisting of stringers and aggregations of semi -

massive to massive pyrrhotite, chalcopyrite and pyrite (see image below).

Hole GD-22-39 collared from Pad A (1205 meters step-out from Surebet Main) intersected 28.20

meters* of sulphides, quartz veining and brecciation hosted in siltstone from 81.10 meters to 110.00

meters containing interstitial pyrrhotite, galena, sphalerite and chalcopyrite in veins and stringers

(see image below).

Hole GD-22-37 collared from Pad 9 (1430 meters step-out from Surebet Main) contains 14.74 meters*

of significant sulphide mineralization hosted in a siltstone unit containing quartz veinlets with

interstitial to net-textured pyrrhotite, sphalerite and pyrite from 58.56 meters to 73.30 meters. It also

contains a section of porphyritic andesite with pyrrhotite-pyrite stringer and disseminated sulphides

from 170.00 meters to 192.00 meters (interval 22 meters*), past the contact between sediments and

underlying volcanic rocks (see image below).

Hole GD-22-45 drilled from Lake Pad (1642 meters step-out from Surebet Main) intersected 2

intervals of mineralized quartz breccia hosted in sandstone and containing interstitial pyrrhotite and

pyrite from 40.07 meters to 42.62 meters (interval 2.55 meters*) and from 167.07 meters to 168.61

meters (interval 1.54 meters*) (see image below).

Previously reported 2022 drill hole highlights:

Hole GD-22-30 drilled from the New Gold Pad (North Extension) intersected broad zones of significant

sulphide mineralization including continuous mineralized breccia from surface up to 360 meters* (see

image below).

Drill hole GD-22-26 on Pad J in the New East Extension Zone intersected a broad zone containing 135

meters* of vein/breccia -hosted and disseminated sulphide mineralization in volcanic rocks from

bedrock (30 m) to the end of the hole (165 m) consisting of pyrrhotite, chalcopyrite and pyrite. The

hole terminated in sulphide mineralization and remains open (see image below).

Observations:

Two distinct styles of mineralization have been observed: 1) sulphide mineralization occurring in

quartz veins, stockwork and/or breccia, and 2) sulphide mineralization occurring i n the host rock

(sediments or volcanics).

The drilling and data continue to demonstrate the presence of a n extensive mineralizing system

drilled and confirmed over and area of 5.25 square kilometers that remains open in all directions .

Assays are pending and will be released once received, compiled, and interpreted.

The extensive mineralizing system has been confirmed over 2.5 km North-South (between Pad J and

New Gold located 1 km North of North Rubble ) and 2.1 km East-West (between Lake Pad and Pad J

located in the Extension Target) (see map above). The system remains open in all directions.

Due to the extent of the mineralized intercepts observed at Pad A and Pad J, the technical team

recommended to drill 3 additional holes from the newly added Pad G in the New Extension Zone.

The 2022 drill program is focused on expanding the known parameters of the Surebet high-grade

gold-silver discovery with ~ 27,000 m of drilling planned in 86 holes from 25 pad locations using 5

drill rigs. The program is designed for resource level infill drilling and outline the large mineralized

system over an area of 2.1 km East-West by 2.5 km North-South (5.25 square kilometers).

100% of all 24 holes drilled during the 2021 maiden campaign totalling 5,332 meters intersected

significant high-grade gold-silver mineralization over 1 km of strike and 1.1 km of down dip extent.

GD-21-03 intersected 6.37 gpt AuEq (4.46 gpt Au and 122.13 gpt Ag) over 35.72 meters*. The

average grade and width from all 24 holes assayed 6.29 gpt AuEq (4.35 gpt Au and 104.94 gpt Ag)

over 5.87 meters* respectively.

Toronto, Ontario – August 11, 2022 – Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE:B4IF)

(the “Company” or “Goliath”) is pleased to report observations from drill holes completed on Pad 9, 11, 15,

A and Lake Pad on the Surebet discovery at its 100% controlled Golddigger Property (the “Property”), Golden

Triangle, B.C. All holes drilled to date during the 2022 drill campaign on Surebet has intersected significant

intervals of sulphide mineralization consisting of a combination of pyrrhotite, galena, sphalerite, chalcopyrite

and pyrite in semi-massive to massive veins, stringers and/or disseminated throughout the rock. The

extensive mineralizing system on Surebet has been confirmed over 2.5 km North-South and 2.1 km East-West

for a total footprint of 5.25 square kilometers (see map above) . The system remains wide open in all

directions.

Roger Rosmus, Founder and CEO of Goliath Resources, states: “We are very excited to see so many

exceptional drill intercepts of mineralization over such an extensive area that is now confirmed over 5.25

square kilometers that remains wide open in all directions. This indicates that there is significant upside

potential to the known perimeters of the Surebet system coupled with our successful 2021 Maiden drill

campaign. We believe the Surebet discovery should continue to provide our shareholders with tremendous

upside with our aggressive 27 ,000+ meter drill program planned as we continue to de -risk our Surebet

discovery and move it up the value curve. We are all looking forward to announcing the first set of assay

results once received, compiled, and interpreted.”

Two distinct styles of mineralization have been observed: 1) sulphide mineralization occurring in quartz veins,

stockwork and/or breccia, and 2) sulphide mineralization occurring in the host rock (sediments or volcanics).

Drill holes GD-22-39, GD-22-42, GD-22-47, GD-22-49 and GD-22-50 collared from Pad A, and GD-22-40, GD-

22-43 and GD -22-45 collared from Lake Pad are characterized by mineralization occurring in quartz veins,

stockwork or breccia. Mineralization primarily occurs as semi-massive to massive sulphides in veins/breccia,

as stringers and aggregations within or at the edge of veins, or as interstitial mineralization between breccia

clasts. The majority of the mineralization consists of pyrrhotite (locally up to 30%), pyrite (locally up to 15%),

sphalerite (locally up to 10%) , galena (locally u p to 10%) and chalcopyrite (locally up to 5%). This type of

mineralization corresponds to what has been observed in the main Surebet Zone and is typically hosted in

shear zones within the sedimentary units. Mineralization observed in drill holes GD-22-28, GD-22-29 and GD-

22-31 collared from Pad 15 occurs in the host rock, where sulphides usually occur as fracture fill stringers and

aggregations within the host rock itself (sedimentary or volcanic units). The principal sulphides observed are

pyrrhotite (up to 15 %), sphalerite (up to 5 %), chalcopyrite (up to 5 %) and pyrite (up to 15 %). The host rock

generally consists of moderately chloritized plagioclase -phyric andesite. Occasionally the host rock is the

overlying interbedded, moderatel y chlorite and biotite altered, sandstone and siltstone. These units are

intruded by a series of felsic and mafic dykes that don’t carry any mineralization. Drill holes GD-22-32, GD-

22-34 and GD-22-37 collared from Pad 9 and GD-22-36, GD-22-38, GD-22-41 and GD-22-44 collared from Pad

11 intersect the contact between sediments and volcanic rocks and contain both types of mineralization.

Drill interval highlights

Pad ID Hole ID From (m) To (m) Length (m) Lithology Mineralization Textures

15

GD-22-28 4.67 33.35 28.68

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite Dissemi-

nated/Veins/Stringer

GD-22-29

124.81 140.22 15.41

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

165.1 175.46 10.36

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

GD-22-31

16.43 18.38 1.95

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Chalcopyrite-

Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

160.9 220 59.10

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Chalcopyrite-

Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

9

GD-22-32 110.66 128.1 17.44 Quartz-Sulfide

(Vein/Breccia) Pyrrhotite-Pyrite Dissemi-

nated/Veins/Stringer

GD-22-34

209.4 230.4 21.00

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Sphalerite-

Pyrite

Dissemi-

nated/Veins/Stringer

230.4 240 9.60

Quartz-Sulfide

Vein/Breccia/Stock-

work

Pyrrhotite-Sphalerite-

Pyrite

Dissemi-

nated/Veins/Stringer

GD-22-37 58.56 73.3 14.74 Quartz-Sulfide

(Vein/Breccia)

Pyrrhotite-Sphalerite-

Pyrite

Dissemi-

nated/Veins/Stringer

170 192 22.00

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Sphalerite-

Pyrite

Dissemi-

nated/Veins/Stringer

11

GD-22-36

45 86 41.00 Quartz-Sulfide

(Vein/Breccia) Pyrrhotite-Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

243 246 3.00

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

GD-22-38 43 81.7 38.70

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Chalcopyrite-

Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

GD-22-41

38.6 41.4 2.80

Quartz-Sulfide

Vein/Breccia/Stock-

work

Pyrrhotite-Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

203.37 209.16 5.79

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

GD-22-44

29.84 30.75 0.91

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

176.9 195.6 18.70

Mineralized Volcanics

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

A

GD-22-39 81.8 110 28.20

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Galena-

Sphalerite-Chalcopyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

GD-22-42 80.19 97.5 17.31

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Galena-

Sphalerite-Chalcopyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

GD-22-47 66.55 74.92 8.37

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Galena-

Sphalerite-Chalcopyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

GD-22-49

69.17 77.31 8.14

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Galena-

Sphalerite-Chalcopyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

99.82 99.95 0.13

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Galena-

Sphalerite-Chalcopyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

113.67 117.17 3.50 Quartz-Sulfide

(Vein/Breccia)

Pyrrhotite-Galena-

Sphalerite-Chalcopyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

GD-22-50

64.27 75.62 11.35

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Galena-

Sphalerite-Chalcopyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

105 109 4.00 Quartz-Sulfide

(Vein/Breccia)

Pyrrhotite-Galena-

Sphalerite-Chalcopyrite

Dissemi-

nated/Veins/Semi-mas-

sive/Stringer

Lake

GD-22-40 138.5 139.5 1.00

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Chalcopyrite-

Pyrite

Dissemi-

nated/Veins/Stringer

GD-22-43 102 104.75 2.75

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite Dissemi-

nated/Veins/Stringer

GD-22-45

40.07 42.62 2.55

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite Dissemi-

nated/Veins/Stringer

167.07 168.61 1.54

Quartz-Sulfide

(Vein/Breccia/Stock-

work)

Pyrrhotite-Pyrite Dissemi-

nated/Veins/Stringer

Assays are pending on all 2022 drill holes and will be reported once received compiled and interpreted.

2022 drill campaign

During the 2022 drill campaign, Goliath plans to test the Surebet mineralized system at depth over an

extensive area reaching as far as Lake Pad to the West (940 m SW of Real Deal) and New Gold to the North (1

km north of North Rubble) focused on delineatin g a mineralized area of 2.1 km East-West by 2.5 km North-

South (see map above). Several drill locations are planned up to 600 meters West of Real Deal to target the

Surebet mineralized system at depth based on the projected model generated from the 2021 drill results and

2020 channel sample results. Multiple surface channel, chip and grab samples collected from Real Deal and

Cloud 9 secondary structures believed to be associated with the Surebet Zone returned significant gold and

silver values, further confirming the presence of a large gold -silver rich mineralizing system at depth. These

secondary structures are interpreted to be acting as conduits for fluids to the surface.

Due to the extent of the mineralized intercepts observed at Pad J and Pad A, the company has decided to drill

3 additional holes from the newly built Pad G.

Golddigger Property

The Golddigger Property is 100 % controlled covering an area of 23,859 hectares (59,646 acres or 239 square-

kilometers) and is in the world class geological setting of the Eskay Rift within the Golden Triangle of British

Columbia and within 2 km of the ‘Red Line’ that is host to multiple world class deposits. The property is on

tide water 30 kilometers southeast of Stewart, British Columbia.

Surebet is characterized by a series of NW -SE trending structures that occur within a package of Hazelton

Group sediments underlain by Hazelton volcanics and are within a few kilometers of the Red Line. All 24

diamond drill holes completed in 2021 intersected significant intervals of Au-Ag polymetallic mineralization

over 1 km of strike, 1.1 km down-dip and 600 meters of vertical relief. Drill hole GD-21-03* intersected 6.37

gpt AuEq (4.46 gpt Au and 122.13 gpt Ag) over 35.72 meters and drill hole GD -21-05* intersected 12.6 gpt

AuEq (8.06 gpt Au and 313.66 gpt Ag) over 6.38 meters. The average grade and width from all 24 holes *

assayed 6.29 gpt AuEq (4.35 gpt Au and 104.94 gpt Ag) over 5.87 meters, respectively.

LiDAR imagery, drone imagery, and field observations have identified several additional paralleling structures

within a 4 square-kilometers area. Geochemical analyses have confirmed high-grade gold-silver polymetallic

mineralization within these structures. The steeply dipping Real Deal and Cloud 9 structures, as well as t he

off-shoot structures from the Extension Zone, display similar mineralization, geochemistry and textures to

the Surebet Zone. Geologic observations at surface and within drill core show structural strain concentrating

in the Surebet Zone along its shallo wer-dipping geometry. Real Deal and Cloud 9 are believed to be en -

echelon structures that connect with Surebet at depth. The mineralized Surebet Zone remains open in all

directions.

Qualified Person

Rein Turna P . Geo is the qualified person as defined by National Instrument 43 -101, for Goliath Resource

Limited projects, and supervised the preparation of, and has reviewed and approved, the technical

information in this release.

Other

All rock, channel and talus fine samples were crushed and pulverized at MSALABS's laboratory in Terrace, BC.

MSALABS is either Certified to ISO 9001:2008 or Accredited to ISO 17025:2005 in all of its locations. The

resulting sample pulps were analyzed for gold by fire assay and metallic screen fire assay in Langley, BC. The

pulps were also assayed using multi -element aqua regia digestion at MSALABS's laboratory in Langley, BC.

The coarse reject portions of the rock samples, as well as the pulps, were shipped to Goliath Resources Ltd.’s

storage facility in Terrace, BC. All samples were analyzed using MSALABS's assay procedure ICP-130, a 1:1:1

aqua regia digestion with inductively-coupled plasma atomic emission spectrometry (ICP-AES) or inductively-

coupled plasma mass spectrometry (ICP-MS) finish for 35 elements as well as the FAS-121 lead collection fire

assay fusion procedure with atomic absorption spectroscopy (AAS) finish. Any results greater than 100 ppm

for silver or 10,000 ppm copper, lead and zinc were additionally assayed using MSALABS's ICA -6xx method

particular to each element. This method used an HNO3-HCl digestion followed by ICP-AES (or titrimetric and

gravimetric analysis). Gold values of greater than 10 ppm Au were assayed by the FAS -425 method which

includes a fire-assay fusion procedure with a gravimetric finish. Samp les with Au greater than 5 ppm were

additionally analyzed using metallic screen fire assay with MSALABS’s MSC-150 or MSC-350 method. QA/QC

samples including blanks, standards, and duplicate samples were inserted regularly into the sample sequence.

The read er is cautioned that grab samples are spot samples which are typically, but not exclusively,

constrained to mineralization. Grab samples are selective in nature and collected to determine the presence

or absence of mineralization and are not intended to be representative of the material sampled.

About Goliath Resources Limited

Goliath Resources Limited is an explorer of precious metals projects in the prolific Golden Triangle of north-

western British Columbia and Abitibi Greenstone Belt of Quebec. All of its projects are in world class geolog-

ical settings and geopolitical safe jurisdictions amenable to mining in Canada.

For more information please contact:

Goliath Resources Limited

Mr. Roger Rosmus

Founder and CEO

Tel: +1-416-488-2887 x222

[email protected]

www.goliathresourcesltd.com

* Widths are reported in drill core lengths and the true widths are not known. AuEq metal values are

calculated using: Au 1792.60 USD/oz, Ag 23.13 USD/oz, Cu 4.37 USD/lbs, Pb 1.05 USD/lbs and Zn 1.52

USD/lbs on November 28, 2021. There is potential for economic recovery of gold, silver, copper, lead, and

zinc from these occurrences based on other mining and exploration projects in the same Golden Triangle

Mining Camp where Goliath’s project is located such as the Homestake Ridge Gold Project (Auryn Resources

Technical Report, Updated Mineral Resource Estimate and Preliminary Economic Assessment on the

Homestake Ridge Gold Project, prepared by Minefill Services Inc. (Bothell, Washington), dated May 29,