Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GORO.V ·

Independent Metalurgical Testing Confirms Higher GOLD Recoveries Achievable at Cerro Prieto GOLD MINE

Metallurgy & Processing

AC/13185763.1

INDEPENDENT METALURGICAL TESTING CONFIRMS

HIGHER GOLD RECOVERIES ACHIEVABLE AT CERRO

PRIETO GOLD MINE

Vancouver, British Columbia (October 22, 2024) Goldgroup Mining Inc. (“ Goldgroup” or the

“Company”) ( TSX-V: GGA , OTC: GGAZF , BMV SIX:GGAN.MX) is pleased to share recent

positive metallurgical testing results for Esperanz a and Ne uva Esperanz a Zones at the

Company’s 100% owned Cerro Prieto Mine located near Magdelana, Sonora State, Mexico.

HIGHLIGHTS

• Cyanide Agitated Bottle Roll Leach Testing on Composite Samples

o Esperanza Zone - Average gold, silver extractions of 78.03%, and 63.12% obtained

after 72 hours of retention time.

o Nueva Esperanza Zone - Average gold silver extractions of 82.07%, and 90.42%

obtained after 72 hours of retention time.

• Locked Cycle Cyanide Column Testing for 78 days on the Esperanza Composite

o The highest gold extraction of 78.88% with silver extraction of 21.18% was obtained

at a sodium cyanide concentration of 600 ppm and crush size of P80 of 3/8”, resulting

in,

• a calculated gold and silver recoveries of 72.09% and17.27% respectively (3%

Discounted from Column Extraction) x 95% ADR Plant Recovery)

• Locked Cycle Cyanide Column Testing for 78 days on the Nueva Esperanza Composite

o The crush size of P 80 of 3/8” gives gold extraction of 77.30% and silver extraction of

31.37%, obtained at a sodium cyanide concentration of 600 ppm and crush size of P80

of 3/8”, resulting in,

• a calculated gold and silver recoveries of 72.09% and17.27% respectively (3%

Discounted from Column Extraction) x 95% ADR Plant Recovery)

Goldgroup CEO, Ralph Shearing, commented, “Historically Cerro Prieto has deposited crushed

mineralized material to the leach pads at P80 of 5/8” and over the past five years has deposited

an average of 42% ROM (Run of Mine uncrushed material) . As such, gold recovery averaged

60% in the first 5 years of operation with 5/8” crush deposited. With the addition of ROM over the

past five years, gold recovery has fallen to an average of 42.6%.”

This recent independent metallurgical testing clearly demonstrates that higher recoveries can be

obtained at the mine by adding cost effective crushing equipment , reducing the size of crushed

rock deposited on the leach pads to P80 of 3/8“ and increasing irrigation fluid’s sodium cyanide

concentration to 600 ppm from 300ppm . Goldgroup management intends to implement the

required changes to the crushing circuits and leach pad irrigation as soon as possible to realize

the potential markedly improved recoveries demonstrated by the metallurgical testing results

- 2 -

AC/13185763.1

disclosed in the press release. I am also looking forward to updating shareholders on Goldgroup’s

advancing efforts towards doubling Cerro Prieto’s production rate”

Figure 1: Cerro Prieto Historical Production

Metallurgical Test Work in a Certified Commercial Metallurgical Laboratory

In May 2024, Cerro Prieto mine site personnel prepared two composites identified as Esperanza

and Nueva Esperanza using 1/4 split of HQ drill core samples for conducting a metallurgical

study specified and under the direction by Rodrigo R Carneiro MS, a Qualified Person under 43-

101 guidelines, which included:

▪ Sample preparation and head screen assays (Au, Ag & Cu) at two crush sizes of P 80 of

5/8” and P80 of 3/8”,

▪ Agitated cyanide bottle roll testing on each composite crushed to 100% minus 10 Mesh

(2mm) for 72 hours,

▪ Locked cycle column testing on each composite at two crush sizes of P 80 of 5/8” and P80

of 3/8” for 78 days.

In June 2024, a metallurgical study on the Esperanza Composite and Nueva Esperanza

Composite was started at Laboratorio Tecnologico de Metalurgia (LTM) located in Hermosillo,

Sonora. LTM is an ISO certified commercial laboratory, and the results obtained in the cyanide

agitated bottle roll tests and locked cycle column leach tests on composites of the Esperanza

and Nueva Esperanza Composites are shown below.

- 3 -

AC/13185763.1

Cyanide Agitated Least Testing

Table No. 1

Cyanide Agitated Leach Testing on Composite Samples

Summary of Results

Sample ID

Calculated Head

(g/t)

Cumulative Extraction

(%)

Reagents

Consumption

(kg/t)

Au Ag Cu Au Ag Cu NaCN CaO

Esperanza 0.611 1.011 54.90 78.91 50.72 4.05 0.637 2.022

Esperanza (Duplicate) 0.632 2.055 45.29 77.15 75.52 5.53 0.883 1.893

Average 0.622 1.533 50.10 78.03 63.12 4.79 0.760 1.958

Nueva Esperanza 0.815 2.861 66.77 83.23 89.49 7.96 1.009 2.224

Nueva Esperanza

(Duplicate)

0.831 3.490 66.07 80.90 91.35 7.48 0.888 2.016

Average 0.823 3.176 66.42 82.07 90.42 7.72 0.949 2.120

The following comments relate to the summary of results obtained on the cyanide agitated leach

testing conducted on the Esperanza Composite samples at a particle size of 100% minus 10

Mesh.

▪ Average gold, silver and copper extractions of 78.03%, 63.12 and 4.79% respectively were

obtained after 72 hours of retention time.

▪ Average NaCN and CaO consumptions were 0.760 kg/t and 1.958 kg/t respectively, NaCN

and CaO consumptions can be considered in the medium range for an agitated leach at

a particle size of 100% minus 10 Mesh.

▪ Average gold, silver and copper calculated head of 0.622 g/t, 1.533 g/t and 50.10 g/t

respectively were obtained on the Esperanza Composite.

The following comments relate to the summary of results obtained on the cyanide agitated leach

testing conducted on the Nueva Esperanza Composite samples at a particle size of 100%

minus 10 Mesh.

▪ Average gold, silver and copper extractions of 82.07%, 90.42 and 7.72% respectively were

obtained after 72 hours of retention time.

▪ Average NaCN and CaO consumptions were 0.949 kg/t and 2.120 kg/t respectively, NaCN

and CaO consumptions can be considered in the medium range for an agitated leach at

a particle size of 100% minus 10 Mesh.

▪ Average gold, silver and copper calculated head of 0.823 g/t, 3.176 g/t and 66.42 g/t

respectively were obtained on the Esperanza Composite.

- 4 -

AC/13185763.1

Locked Cycle Cyanide Column Testing Esperanza Zone

Four (4) locked cycle column tests were conducted on the Esperanza Composite at the crush

sizes of P80 of 5/8” and P80 of 3/8” for 78 days of leach followed by 4 days of wash cycle and 2

days of drain cycle at a commercial ISO certified metallurgical laboratory and the results

obtained are summarized in Table No. 2 below.

Table 2

Locked Cycle Cyanide Column Testing on the Esperanza Composite

Summary of Results

Crush

Size

[NaCN]

(ppm)

Calculated Head Extraction Calculated

Recovery*

Reagent

Consumption

Au

(g/t)

Ag

(g/t)

Cu

(g/t)

Au

(%)

Ag

(%)

Cu

(%)

Au

(%)

Ag

(%)

NaCN

(kg/t)

CaO

(kg/t)

P80 of 5/8” 300 0.682 1.505 52.04 57.30 8.80 0.84 51.59 5.51 0.44 1.95

P80 of 5/8” 600 0.605 1.316 55.76 64.23 10.80 -0.91 58.17 7.41 0.77 1.95

P80 of 3/8” 300 0.603 1.571 49.73 71.91 27.80 3.97 65.47 23.56 0.48 1.95

P80 of 3/8” 600 0.664 1.459 47.50 78.88 21.18 2.20 72.09 17.27 0.75 1.95

*Calculated as Follows: (3% Discounted from Column Extraction) x 95% ADR Plant Recovery

The following comments relate to the column tests conducted on the Esperanza Composite at

crush sizes of P80 of 5/8” and P80 of 3/8” using sodium cyanide concentrations in the feed solution

of 300 ppm and 600 ppm.

▪ The highest gold extraction of 78.88% was obtained at a sodium cyanide concentration of

600 ppm and the lowest silver extraction of 21.18%.

▪ It seems that an incremental sodium cyanide consumption of 0.27 g/t obtained at the crush

size of P80 of 3/8” and using 600 ppm of sodium cyanide justifies the additional incremental

of gold extraction of 6.97%.

▪ Calculated gold and silver recoveries of 72.09% and 17.27% respectively were estimated

discounted 3% from the column extraction and ADR Plant recovery of 95%.ted 3% from

the column gold and silver extractions and ADR Plant recovery of 95%.

Locked Cycle Cyanide Column Testing Nueva Esperanza Zone

Two (2) locked cycle column tests were conducted on the Nueva Esperanza Composite at the

crush sizes of P80 of 5/8” and P80 of 5/8” for 78 days of leach followed by 4 days of wash cycle

and 2 days of drain cycle at a commercial ISO certified metallurgical laboratory and the results

obtained are summarized in Table No. 3 below.

- 5 -

AC/13185763.1

Table 3

Locked Cycle Cyanide Column Testing on the Nueva Esperanza Composite

Summary of Results

Crush Size

[NaCN]

(ppm)

Calculated Head Extraction Estimated

Recovery*

Reagent

Consumption

Au

(g/t)

Ag

(g/t)

Cu

(g/t)

Au

(%)

Ag

(%)

Cu

(%)

Au

(%)

Ag

(%)

NaCN

(kg/t)

CaO

(kg/t)

P80 of 5/8” 600 0.787 1.764 104.57 72.40 33.74 0.01 65.93 29.20 0.67 2.18

P80 of 3/8” 600 0.749 2.387 63.00 77.30 31.37 3.38 70.58 26.95 0.73 2.18

*Calculated as Follows: (3% Discounted from Column Extraction) x 95% ADR Plant Recovery

The following comments relate to the column tests conducted on the Nueva Esperanza

Composite at two crush sizes of P80 of 5/8” and P80 of 3/8”.

▪ The crush size of P 80 of 3/8” shows the highest gold extraction of 70.58% and the

lowest silver extraction of 26.95%

▪ The additional incremental of sodium cyanide consumption of 0.06 g/t should justify

the additional incremental of gold extraction of 4.65% obtained at the crush size of P80

of 3/8”.

▪ Calculated gold and silver recoveries of 70.58% and 26.95% respectively were

estimated discounted 3% from the column extraction and ADR Plant recovery of 95%.

▪ There was not enough sample weight to conduct two column tests using sodium

cyanide concentration of 300 ppm.

Rodrigo R Carneiro, MS, QP., is the qualified person under NI 43 -101 who has reviewed and

approved the metallurgical results obtained on the Esperanza and Nueva Esperanza Zones

disclosure contained in this news release.

About Goldgroup

Goldgroup is a Canadian-based mining Company that owns and operates the Cerro Prieto heap-

leach gold mine located in the State of Sonora, Mexico and is led by a team of highly successful

and seasoned individuals with extensive expertise in mine development, corporate finance, and

exploration in Mexico.

For further information on Goldgroup, please visit www.goldgroupmining.com

On behalf of the Board of Directors

Ralph Shearing

CEO

+1 (604) 764-0965

Neither the TSX Venture Exchange nor its Regulation Service Provider accepts responsibility for

the adequacy or accuracy of this release.

- 6 -

AC/13185763.1

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION

Certain information contained in this news release, including any information relating to future

financial or operating performance, may be considered “forward -looking information” (within the

meaning of applicable Canadian securities law) and “forward -looking statements” (within the

meaning of the United States Private Securities Litigation Reform Act of 1995). These statements

relate to analyses and other information that are based on forecasts of future results, estimates

of amounts not yet determinable and assumptions of management. Actual results could differ

materially from the conclusions, forecasts and projections contained in such forward -looking

information.

The Company cautions that it chose to advance the Cerro Prieto Mine zones into production

without the benefit of completing a feasibility study demonstrating economic and technical viability

or, an independent technical report confirming resources or reser ves. Accordingly, readers

should be cautioned that Goldgroup’s production decisions has been and are being made without

a comprehensive feasibility study of established reserves or resources such that there is greater

risk and increased uncertainty as to future economic results from the Cerro Prieto Mine and a

higher technical risk of failure than would be the case if a feasibility study were completed and

relied upon to make a production decision.

These forward-looking statements reflect Goldgroup’s current internal projections, expectations

or beliefs and are based on information currently available to Goldgroup. In some cases forward-

looking information can be identified by terminology such as “ma y”, “will”, “should”, “expect”,

“intend”, “plan”, “anticipate”, “believe”, “estimate”, “projects”, “potential”, “scheduled”, “forecast”,

“budget” or the negative of those terms or other comparable terminology.

Forward-looking information is subject to a variety of known and unknown risks, uncertainties and

other factors that could cause actual events or results to materially differ from those reflected in

the forward -looking information, and are developed based on assumptions about such risks,

uncertainties and other factors including, without limitation: receipt of all required stock exchange

and regulatory approvals,; the continued listing and trading of the Company’s common shares;

uncertainties related to act ual capital costs operating costs and expenditures; production

schedules and economic returns from Goldgroup’s projects; uncertainties associated with

development activities; uncertainties inherent in the estimation of mineral resources and precious

metal recoveries; uncertainties related to current global economic conditions; fluctuations in

precious and base metal prices; uncertainties related to the availability of future financing;

potential difficulties with joint venture partners; risks that Goldgroup’s title to its property could be

challenged; political and country risk; risks associated with Goldgroup being subject to

government regulation; risks associated with surface rights; environmental risks; Goldgroup’s

need to attract and retain qualified personnel; risks associated with potential conflicts of interest;

Goldgroup’s lack of experience in overseeing the construction of a mining project; risks related to

the integration of businesses and assets acquired by Goldgroup; uncertainties related to the

competitiveness of the mining industry; risk associated with theft; risk of water shortages and risks

associated with competition for water; uninsured risks and inadequate insurance coverage; risks

associated with potential legal proceedings; risks associ ated with community relations; outside

contractor risks; risks related to archaeological sites; foreign currency risks; risks associated with

security and human rights; and risks related to the need for reclamation activities on Goldgroup’s

properties, as well as the risk factors disclosed in Goldgroup’s MD&A and other public disclosure

by Goldgroup. Any and all of the forward -looking information contained in this news release is

qualified by these cautionary statements.

- 7 -

AC/13185763.1

Although Goldgroup believes that the forward-looking information contained in this news release

is based on reasonable assumptions, readers cannot be assured that actual results will be

consistent with such statements. Accordingly, readers are cautioned ag ainst placing undue

reliance on forward-looking information. Goldgroup expressly disclaims any intention or obligation

to update or revise any forward-looking information, whether as a result of new information, events

or otherwise, except as may be required by, and in accordance with, applicable securities laws.