Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GOLD.TO ·

GoldMining Intersects 37 Metres Grading 2.26 g/t Gold Within Mineralized Corridor of 163 Metres Grading 1.02 g/t Gold at the São Jorge Project, Brazil

Drill Results

GoldMining Intersects 37 Metres Grading 2.26 g/t Gold Within Mineralized

Corridor of 163 Metres Grading 1.02 g/t Gold at the São Jorge Project,

Brazil

VANCOUVER, BC

,

June 18, 2024

/CNW/ -

GoldMining Inc. (the "

Company

" or "

GoldMining

")

(TSX: GOLD) (NYSE American: GLDG) is pleased to announce

assay results from the first drill hole of its recently announced drilling program at the Company's 100% owned São Jorge Project ("

São Jorge

" or the "

Project

") in

the Tapajós Gold district, Pará State,

Brazil

.

The program consists of approximately 1,000 metres ("

m

") of total proposed diamond core drilling and

3,000 m

of power auger drilling. The objectives of the

program include, among other things, to complete confirmatory drilling within and near the margins of the existing São Jorge gold deposit

1

(the "

Deposit

"), and

test a reinterpretation of the structural controls on high-grade mineralization. Assay results for the first diamond drill hole have been received and are reported in

this release.

Drill Hole SJD-120-24

highlights include

:

163 m at 1.02 grams per tonne (g/t) gold (Au) from

44 m

downhole depth

, including higher-grade intersections:

20 m at 1.37 g/t Au from

44 m

depth;

37 m at 2.26 g/t Au from

95 m

depth;

11 m at 1.00 g/t Au from

148 m

depth;

13 m at 1.35 g/t Au from

166 m

depth; and

12 m at 1.15 g/t Au from

195 m

depth.

Tim Smith

, Vice President of Exploration, commented: "We are pleased to announce the results from the first drilling at São Jorge in more than a decade. The

results from this first drill hole are strong and we believe help demonstrate an extensive corridor of mineralization consisting of multiple intercepts of broad gold

mineralization. These include some narrower higher-grade zones.

Oriented diamond core drilling has successfully confirmed our thesis for the structural controls

on mineralization within the deposit, which was the first objective of our multi-pronged drilling program. We expect that the improved geological model based

on these intercepts will provide greater confidence in future mineral resource estimation. Additionally, we have commenced the auger drilling component of the

program

and forward to providing additional updates."

Drill Program Details and Geological Description

São Jorge sits within the active and rapidly developing Tapajós Gold District (see

Figure 1

), which is estimated to have produced over 20 million ounces of gold

historically from artisanal mining of surface deposits, according to the Brazil National Mining Agency. The Tapajós is home to Serabi Gold Plc.'s producing high-

grade underground Palito Mine and G Mining Ventures Corp.'s ("

G Mining

") brand new Tocantinzinho open pit mine, which recently commenced commissioning of

its ore processing facility (see G Mining news release

June 11, 2024

).

São Jorge is located immediately adjacent to paved Hwy BR-163 and a new 138 kV powerline corridor tied into the district electrical grid recently constructed for

Tocantinzinho. Exploration activities at São Jorge are operated from a permanent camp adjacent to the existing Deposit and just 3 kilometres from the highway.

Figure 1 – Tapajós Gold District and location of São Jorge Project. (CNW Group/GoldMining Inc.)

The Company commenced drilling at São Jorge in

May 2024

(see news release dated

May 29, 2024

). Structural analysis of historic mapping and oriented core

from drilling by previous operators identified two principal vein/fracture orientations, the intersection of which produces a steeply plunging high-grade 'shoot'

geometry. To test this interpretation, three infill (confirmatory) oriented core drill holes are planned within the known Deposit and near its margins (see

Figure 2

).

This drilling, including results of the first hole contained in this news release could provide evidence for a better understanding of the controls on high-grade

mineralization and optimization of the resource modelling methodology.

SJD-120-24 intersected numerous zones of gold mineralization starting in the saprolite zone near the surface and extending into bedrock (see

Figure 3

).

Mineralization comprises fracture-controlled sulphide ± quartz veins, with the sulphides consisting of dominant pyrite with lesser chalcopyrite, along metre-scale

northwest-southeast striking shear zones hosted within monzogranite and along a sheared footwall contact between monzogranite and syenogranite, which

cumulatively defines the São Jorge high-strain corridor. Pyrite occurs as hairline stringers, disseminated grains and semi-massive pyrite in 3 – 5 cm thick veins.

Better gold grades are related to a higher abundance of sulphide minerals, particularly thicker veins, and/or a higher density of semi-massive to massive pyrite

veins.

Figure 4

illustrates the strong visual nature of mineralization at São Jorge.

1

Additional information regarding the São Jorge Project, including existing resource estimates and historical work at the project, is set out in the technical report titled "São Jorge Gold Project, Pará State, Brazil: Independent Technical Report on Mineral Resources", prepared for the Company

and dated effective May 31, 2021, which is available under the Company's profile at

www.sedarplus.ca

.

Figure 2 – São Jorge gold deposit drill hole locations, including location of SJD-120-24 and other drill holes pending assay results.

Section line as illustrated in

Figure 3 is shown. (CNW Group/GoldMining Inc.)

Figure 3 – São Jorge gold deposit drill hole cross-section, showing location of recently completed SJD-120-24, facing northeast (see section trace on Figure 2).

(CNW Group/GoldMining Inc.)

Figure 4 – São Jorge gold mineralization from drillhole SJD-120-24: (A) 11.47 g/t Au from 97.0 to 98.0 m downhole comprising intensely pyrite veined and

silicified/brecciated monzogranite; and (B) 3.75 g/t Au from 265.0 to 266.0 m downhole comprising fracture-controlled sulphide veins displaying two principal

structural orientations. (CNW Group/GoldMining Inc.)

Table 1

– São Jorge assay intercepts from the first hole of the program received as of

June 18, 2024

.

Hole Number

Interval From

(m)

Interval To

(m)

Core Length

1

(m)

Au Grade

(g/t)

SJD-120-24

44.00

207.00

163.00

1.02

SJD-120-24

44.00

64.00

20.00

1.37

Including

45.00

50.00

5.00

2.82

Including

45.00

46.00

1.00

7.25

SJD-120-24

69.00

70.00

1.00

3.03

SJD-120-24

74.00

75.00

1.00

5.05

SJD-120-24

95.00

132.00

37.00

2.26

Including

97.00

98.00

1.00

11.47

Including

102.00

104.00

2.00

12.22

SJD-120-24

148.00

159.00

11.00

1.00

Including

152.00

155.00

3.00

2.31

SJD-120-24

166.00

179.00

13.00

1.35

SJD-120-24

195.0

207.0

12.00

1.15

including

201.00

206.00

5.00

2.24

Including

205.00

206.00

1.00

7.29

SJD-120-24

249.00

250.00

1.00

1.07

SJD-120-24

259.00

260.00

1.00

1.27

SJD-120-24

265.00

266.00

1.00

3.74

Notes:

1.

True widths are estimated to be approximately 66% of downhole length, assuming primarily steeply dipping vein-hosted mineralization.

Table 2

– São Jorge 2024 drill hole collar location coordinates.

Hole

Number

Easting

Metres

(UTM Zone

21S)

Northing

Metres

(UTM Zone

21S)

Elevation

(m above

sea level)

Depth

(m)

Azimuth

(

Degrees

)

Dip

(

Degrees

)

Status

SJD 120-24

657535

9282655

209.45

271.84

335

-50

All assays

received

SJD 121-24

Pending

SJD 122-24

Pending

Qualified Person

Paulo Pereira

, P. Geo., President of GoldMining, has supervised the preparation of, and verified and approved, the scientific and technical information herein this

news release. Mr. Pereira is a Qualified Person as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("

NI 43-101

").

Data Verification

For this drill core sampling program, samples were taken from the NQ/HQ core by sawing the drill core in half, with one-half sent to SGS Geosol Laboratórios

Ltda. ("

SGS

") in

Brazil

for assaying, and the other half of the core retained at the site for future reference. Sample lengths downhole were uniformly

1.0 m

. SGS

is a certified commercial laboratory in Vespasiano, Minas Gerais,

Brazil

, and is independent of GoldMining. GoldMining has implemented a quality assurance and

quality control program for the sampling and analysis of drill core, including duplicates, mineralized standards and blank samples for each batch of 100 samples.

The gold analyses were completed by FAA505 method (fire-assay with an atomic absorption finish on 50 grams of material).

About GoldMining Inc.

GoldMining Inc. is a public mineral exploration company focused on acquiring and developing gold assets in the Americas. Through its disciplined acquisition

strategy, GoldMining now controls a diversified portfolio of resource-stage gold and gold-copper projects in

Canada

, the

U.S.A.

,

Brazil

,

Colombia

, and

Peru

. The

Company also owns approximately 21.5 million shares of Gold Royalty Corp. (NYSE American: GROY), 9.9 million shares of U.S. GoldMining Inc. (Nasdaq:

USGO), and 26.7 million shares of NevGold Corp. (TSXV: NAU). See

www.goldmining.com

for additional information.

Notice to Readers

Technical disclosure regarding

São Jorge

has been prepared by the Company in accordance with NI 43-101. NI 43-101 is a rule of the Canadian Securities

Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These

standards differ from the requirements of the U.S. Securities and Exchange Commission ("SEC") and the scientific and technical information contained in this

news release may not be comparable to similar information disclosed by domestic

United States

companies subject to the SEC's reporting and disclosure

requirements.

Cautionary Statement on Forward-looking Statements

Certain of the information contained in this news release constitutes "forward-looking information" and "forward-looking statements" within the meaning of

applicable Canadian and U.S. securities laws ("forward-looking statements"), which involve known and unknown risks, uncertainties and other factors that may

cause the Company's actual results, performance and achievements to be materially different from the results, performance or achievements expressed or

implied therein. Forward-looking statements, which are all statements other than statements of historical fact, include, but are not limited to, statements and

expectations respecting the proposed drill program at the Project; , including the potential benefits thereof and the Company's expectations regarding the

Project. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives,

assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans",

"projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or

stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and

similar expressions) are not statements of historical fact and may be forward-looking statements or information. Forward-looking statements are based on the

then-current expectations, beliefs, assumptions, estimates and forecasts about the business and the markets in which GoldMining operates. Investors are

cautioned that all forward-looking statements involve risks and uncertainties, including: the inherent risks involved in the exploration and development of

mineral properties, fluctuating metal prices, unanticipated costs and expenses, risks related to government and environmental regulation, social, permitting and

licensing matters, any inability to complete the drill program as expected, the Company's plans with respect to São Jorge may change as a result of further

planning or otherwise, and uncertainties relating to the availability and costs of financing needed in the future. These risks, as well as others, including those

set forth in GoldMiningꞌs Annual Information Form for the year ended

November 30, 2023

, and other filings with Canadian securities regulators and the SEC,

could cause actual results and events to vary significantly. Accordingly, readers should not place undue reliance on forward-looking statements. There can be

no assurance that forward-looking statements, or the material factors or assumptions used to develop such forward-looking statements, will prove to be

accurate. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities law.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/goldmining-intersects-37-metres-grading-2-26-gt-gold-within-mineralized-corridor-of-163-metres-grading-1-02-gt-gold-at-the-sao-jorge-project-brazil-302174885.html

SOURCE

GoldMining Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/June2024/18/c6757.html

%SEDAR: 00031036E

For further information:

For additional information, please contact: GoldMining Inc., Amir Adnani, Co-Chairman, David Garofalo, Co-Chairman, Alastair Still,

CEO, Telephone: (855) 630-1001, Email: [email protected]

CO: GoldMining Inc.

CNW 06:30e 18-JUN-24