GoldMining Inc. Launches 2025 Exploration Program, São Jorge Project, Brazil
GoldMining Inc. Launches 2025 Exploration Program, São
Jorge Project, Brazil
VANCOUVER, BC
,
March 18, 2025
/CNW/ - GoldMining Inc. (the "
Company
" or "
GoldMining
") (TSX: GOLD) (NYSE American:
GLDG) is pleased to announce plans to commence a major exploration program on the Company's 100% owned São Jorge Project
("
São Jorge
" or the "
Project
") in the Tapajós gold district, Pará State,
Brazil
.
Highlights:
Planned drilling campaign of up to 5,000 metres
Systematic drilling to target expansion of the São Jorge deposit (the "
Deposit
") along strike
Drill testing new zones of potential bedrock mineralization at high priority geochemical and geophysical targets
Geophysical surveying including expansion of the existing IP survey
northwards over the William South and North prospect
areas
Additional auger drilling of up to 3,000 metres
over high tenor soil anomalies
Soil sampling program of up to 6,000 samples
to test and expand the broader mineral system across the Project
The Company has already commenced field activities including soil sampling, mapping and prospecting, and is planning a follow-up
diamond core drilling program for the 2025 field season. In the 2024 drill program results, numerous high-grade auger drill intercepts
provided compelling targets to systematically explore for new gold discoveries
within the
São Jorge
mineral system (see news release
dated
February 26, 2025
):
High-grade auger drill intercepts at William South in 2024 included 1 metre ("
m
") at 17.14 g/t Au,
1 m
at 10.20 g/t Au,
1 m
at 8.01
g/t Au and
5 m
at 2.78 g/t Au, all from shallow depths of less than
15 m
below surface
Recent soil sampling in 2025 has returned the highest ever gold-in-soil anomaly of 5.96 g/t Au at the William North prospect area
The Deposit occurs within an emerging and expanding mineral system defined by a 12 km x 7 km footprint of elevated surface
geochemical anomalies surrounding the Deposit, thereby highlighting the broader exploration potential of the Project.
Alastair Still
, Chief Executive Officer of GoldMining, commented:
"GoldMining is excited to be launching a comprehensive
exploration program at our São Jorge Project that will be the largest exploration program in the 14+ year history of our Company, and
is a testament to our belief in the previously untapped exploration potential at São Jorge. We have assembled a first-class exploration
team led by our President
Paulo Pereira
, a veteran Brazilian geologist, and our VP Exploration Tim Smith who has over thirty years of
global gold experience. It follows that an experienced technical team, combined with São Jorge's demonstrated prospectivity, proximity
to existing highway and power infrastructure, regional scale property size exceeding 46,000 hectares and location within an emerging
gold producing district, makes for a compelling growth opportunity."
Figure 1 – Tapajós Gold District and location of the Project. (CNW Group/GoldMining Inc.)
São Jorge Project Exploration Opportunity and Upside
Over the past two years the Company has embarked on a systematic exploration campaign to compile comprehensive exploration
datasets to test the broad extent and continuity of the São Jorge mineral system (see Figure 2). The associated surface sampling
program has successfully delineated several new exploration targets comprising gold ± copper ± molybdenum ± silver soil geochemical
anomalies which cumulatively outline a large mineral system defined by a 12 km x 7 km geochemical footprint surrounding the Deposit.
Follow up testing has to date produced very encouraging results, including diamond core drilling which stepped out 1 kilometre west of
the Deposit to confirm the mineralized corridor remains open along strike (see news release dated
September 9, 2024
). Additional
fences of diamond core drilling are now planned to extend the São Jorge mineralized corridor.
At William South, located 1 kilometre north of the Deposit, auger drilling intended to test the source of mineralization beneath high tenor
soil anomalies has to date returned numerous high-grade intercepts (see news releases dated
September 9, 2024
, and
November 11,
2024
) including:
1 m
at 17.14 g/t Au from
12 m
depth;
5 m
at 2.78 g/t Au from
10 m
depth;
1 m
at 10.2 g/t Au from
14 m
depth;
1 m
at 8.01 g/t Au from
6 m
depth;
1 m
at 3.78 g/t Au from
10 m
depth; and
3 m
at 1.05 g/t Au from
12 m
depth.
These auger drilling results indicate the potential to discover new gold mineralized zones at William South, which will be complemented
with the assistance of an extended IP survey to help refine diamond core targeting. The Company also plans to undertake additional
step-out auger drilling to search for new gold-in-bedrock drill targets, such as at William North where recent gold-in-soil sampling has
returned the highest tenor soil sample on the property of 5.96 g/t Au.
Figure 2 – São Jorge mineral system and exploration targets. (CNW Group/GoldMining Inc.)
Visit
www.goldmining.com
for more information, including high resolution figures and the recently published Technical Report titled "NI
43-101 Technical Report, São Jorge Project, Pará State,
Brazil
" which has an effective date of
January 28, 2025
.
Qualified Person
Paulo Pereira
, P. Geo., President of GoldMining, has supervised the preparation of, and verified and approved, all other scientific and
technical information herein this news release. Mr. Pereira is also a QP as defined in National Instrument 43-101 – Standards of
Disclosure for Mineral Projects ("
NI 43-101
").
About GoldMining Inc.
GoldMining Inc. is a public mineral exploration company focused on acquiring and developing gold assets in the Americas. Through its
disciplined acquisition strategy, GoldMining now controls a diversified portfolio of resource-stage gold and gold-copper projects in
Canada
, the
U.S.A.
,
Brazil
,
Colombia
, and
Peru
.
Notice to Readers
Technical disclosure regarding
São Jorge
has been prepared by the Company in accordance with NI 43-101. NI 43-101 is a rule of
the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and
technical information concerning mineral projects. These standards differ from the requirements of the U.S. Securities and Exchange
Commission ("SEC") and the scientific and technical information contained in this news release may not be comparable to similar
information disclosed by domestic
United States
companies subject to the SEC's reporting and disclosure requirements.
Cautionary Statement on Forward-looking Statements
Certain of the information contained in this news release constitutes "forward-looking information" and "forward-looking statements"
within the meaning of applicable Canadian and U.S. securities laws ("forward-looking statements"), which involve known and
unknown risks, uncertainties and other factors that may cause the Company's actual results, performance and achievements to be
materially different from the results, performance or achievements expressed or implied therein. Forward-looking statements, which
are all statements other than statements of historical fact, include, but are not limited to, statements respecting the Company's
expectations regarding the Project and expected work programs thereat and often contain words such as "anticipate", "intend", "plan",
"will", "would", estimate", "expect", "believe", "potential" and variations of such terms. Such forward-looking statements are based on
the then-current expectations, beliefs, assumptions, estimates and forecasts about the business and the markets in which GoldMining
operates, which may prove to be incorrect. Investors are cautioned that forward-looking statements involve risks and uncertainties,
including, without limitation: the inherent risks involved in the exploration and development of mineral properties, fluctuating metal
prices, unanticipated costs and expenses, risks related to government and environmental regulation, social, permitting and licensing
matters, any inability to complete work programs as expected, the Company's plans with respect to the Project may change as a
result of further planning or otherwise, and uncertainties relating to the availability and costs of financing needed in the future. These
risks, as well as others, including those set forth in GoldMiningꞌs most recent Annual Information Form and other filings with
Canadian securities regulators and the SEC, could cause actual results and events to vary significantly. Accordingly, readers should
not place undue reliance on forward-looking statements. There can be no assurance that forward-looking statements, or the material
factors or assumptions used to develop such forward-looking statements, will prove to be accurate. The Company does not undertake
to update any forward-looking statements, except in accordance with applicable securities law.
View original content to download multimedia:
https://www.prnewswire.com/news-releases/goldmining-inc-launches-2025-exploration-program-sao-jorge-project-brazil-302403789.html
SOURCE
GoldMining Inc.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/March2025/18/c1499.html
%SEDAR: 00031036E
For further information:
For additional information, please contact: GoldMining Inc., Amir Adnani, Co-Chairman; David Garofalo, Co-
Chairman; Alastair Still, CEO, Telephone: (855) 630-1001, Email: [email protected]
CO: GoldMining Inc.
CNW 06:00e 18-MAR-25